by AJ Gargash Real Estate Development in International City 2
Mayflower Residences is a residential project by AJ Gargash Real Estate Development in International City 2, Dubai, with handover 31.03.2026, construction 87.9% complete per the DLD registry.
Construction progress
- Handover31.03.2026
- Status date16.04.2026
- DLD project number3301
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: AJ Gargash Real Estate Development · District: International City 2
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 27.07.2026 | 1 BR | 94.8 | 755 760 |
| 12.03.2026 | 1 BR | 70.9 | 720 000 |
| 08.01.2026 | 1 BR | 69.6 | 725 000 |
| 30.04.2025 | 1 BR | 96.5 | 755 000 |
| 22.04.2025 | 1 BR | 105.4 | 808 000 |
| 21.04.2025 | 1 BR | 71.9 | 588 417 |
| 04.04.2025 | 1 BR | 72.7 | 591 656 |
| 04.04.2025 | 1 BR | 215.4 | 815 040 |
| 26.03.2025 | 2 BR | 119.8 | 1 007 475 |
| 18.03.2025 | 1 BR | 62.9 | 603 476 |
| 13.03.2025 | 2 BR | 128.6 | 1 099 046 |
| 13.03.2025 | 1 BR | 67.1 | 612 475 |
| 10.03.2025 | 1 BR | 72.1 | 596 154 |
| 10.03.2025 | 2 BR | 128.6 | 1 109 441 |
| 19.02.2025 | 1 BR | 63.5 | 640 000 |
| 19.02.2025 | 1 BR | 63.5 | 634 600 |
| 17.02.2025 | 1 BR | 92.5 | 753 880 |
| 17.02.2025 | 1 BR | 92.5 | 751 060 |
| 17.02.2025 | 1 BR | 92.0 | 742 600 |
| 12.02.2025 | 1 BR | 69.4 | 604 787 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Mayflower Residences is a single residential building with ground-floor retail in International City 2, Dubai. It is being developed by A J G Warsan Real Estate Development and comprises 99 units. The project is active, with construction recorded at 87.86% completion and a scheduled completion date of 31 March 2026.
The project and building design
Mayflower Residences is planned as one residential building configured with a utility basement, basement, ground floor, six floors and a roof level. Retail space is incorporated at ground-floor level, placing commercial premises within the building’s layout. The structure is designed in concrete and blockwork, with internal and external finishes included in the scope of the development. The project contains 99 units across the building. Its registered project number is 3301, matching the development’s identification within Dubai’s project records. The development started on 28 March 2024 and remains active.
Construction status and scheduled completion
Construction at Mayflower Residences is recorded at 87.86% complete. The latest inspection date is 16 April 2026, and the project status is active. The scheduled completion date is 31 March 2026. These dates place the scheme in its delivery phase, with the building structure, finishes and the ground-floor retail component forming part of the registered project scope. Mayflower Residences has 99 units in one building, rather than being a multi-building residential complex.
International City 2 setting
Mayflower Residences is located in International City 2, within Dubai’s Warsan 4 area. International City 2 is a planned extension of International City, encompassing the areas commonly known as Phase 2 and Phase 3. The district is bounded by Emirates Road to the west, Academic City to the east, Dubai Silicon Oasis to the south and International City 1 to the north. Its masterplan includes a central high-rise circle and surrounding low- and mid-rise neighbourhoods. International City Phase 3 is centred on mid-rise apartment buildings, while Greenview, previously labelled Phase 2, was redesigned for townhouse and villa parcels.
Local parks, leisure and entertainment
Several parks and leisure destinations are positioned within the wider surrounding area. Silicon North Park is 2.0 km from Mayflower Residences, while Silicon Oasis Lake Park is 2.8 km away and Silicon Oasis Community Park is 3.4 km away. Novo Cinema at Dragon Mall is 3.5 km from the development. Dubai Safari Park is 6.2 km away, Yalla Bowling at City Centre Mirdif is 7.8 km away and Ras Al Khor Wildlife Sanctuary is 9.3 km away. Al Badia Golf Club is 8.8 km from the project, while The Track Meydan Golf is 9.4 km away.
Travel connections from the district
International City 2 is bordered by Emirates Road and sits beside Dubai Silicon Oasis and Academic City. Typical driving times from the district are 21 minutes to Dubai Mall, 31 minutes to Palm Jumeirah, 29 minutes to Burj Al Arab, 34 minutes to The Walk at JBR and 15 minutes to Dubai International Airport. Al Maktoum International Airport is reached in 38 minutes by typical driving time. The nearest Red Line Dubai Metro station is 9,071 metres from International City 2. A Blue Line metro route and station are planned for the corridor between Phase 2 and Phase 3.
The developer
Mayflower Residences is developed by A J G Warsan Real Estate Development. The company is named as the developer for the 99-unit residential project in International City 2. The development programme began on 28 March 2024, with a scheduled completion date of 31 March 2026. The project comprises one building with a utility basement, basement, ground floor, six residential floors and a roof level. Ground-floor retail is included alongside the residential component.


















