Developer: Valores Property Development · International City 2
Elevia Residences 3 is a residential project by Valores Property Development in International City 2, Dubai, with prices from AED 450 000, handover Q3 2027, construction 0% complete per the DLD registry, 105 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
| Type | Units | Typical size, sq.ft |
|---|---|---|
| Studio | 83 | 425–491 |
| 1 Bedroom | 17 | 841–975 |
| 2 Bedroom | 5 | 1 181–1 224 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 450 000 AED is 1 900 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 11.10.2026 09:55).
The register shows the same percentage as at the inspection on 29.07.2025.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Valores Property Development · District: International City 2

Elevia Residences 3 is a 105-unit residential development by Valores Property Development in International City 2, within Warsan Fourth, Dubai. The project comprises one building planned as basement, ground floor, five floors and a roof level, with studios and one- and two-bedroom apartments. It is active, with construction recorded at 4% complete and handover scheduled for Q3 2027.
Elevia Residences 3 is planned as a single residential building with a basement, ground floor, five upper floors and a roof level. Its architectural concept uses a contemporary façade with curved balconies, glass railings and floor-to-ceiling windows. The apartments are designed with open-plan living and dining areas, while the layouts are intended to bring natural light into the homes through large windows. Interiors include integrated living and dining spaces, alongside kitchens fitted with kitchen appliances. The project’s design combines neutral-coloured finishes with glass elements across the exterior. Aroma International Building Contracting is the construction company for the development.
The residential collection at Elevia Residences 3 includes studio apartments, one-bedroom apartments and two-bedroom apartments. There are 105 units in total within the building. The homes are planned with open layouts that combine living and dining areas, and each apartment includes a kitchen with appliances. Floor-to-ceiling windows form part of the residential design, together with curved balconies and glass railings on the façade. The project is positioned in International City 2, a district whose wider masterplan includes mid-rise apartment buildings alongside other residential formats. Prices at Elevia Residences 3 start from AED 450,000.
Elevia Residences 3 includes a pool, gym, children’s play area and common area. These facilities are part of the shared amenity provision for the 105 residences. The pool and gym provide on-site recreation and fitness facilities, while the children’s play area is included as a dedicated space for younger residents. The common area forms an additional shared setting within the development. The building’s apartment types span studios, one-bedroom homes and two-bedroom homes, providing three residential configurations within the project. The project is planned as one building rather than a multi-building development.
Elevia Residences 3 is located in International City 2, in the Warsan Fourth area of Dubai. International City 2 forms part of the wider International City programme and sits between Emirates Road, Academic City, Dubai Silicon Oasis and International City 1. The district’s masterplan includes a central high-rise circle, with surrounding low- and mid-rise neighbourhoods. Silicon North Park is 1.9 km from the project, and Warsan Residential Park is 2.0 km away. Warsan Residential Children’s Park is 2.6 km away, while Novo Cinema at Dragon Mall is 3.3 km away. Dubai Safari Park is 6.6 km from the development, and Ras Al Khor Wildlife Sanctuary is 8.0 km away.
The published payment structure for Elevia Residences 3 is a 50/50 plan. Buyers pay 10% on booking, followed by 40% during construction and the remaining 50% on handover. The project is scheduled for handover in Q3 2027, with a recorded completion date of 31 July 2027. Construction started on 1 August 2025. The current project status is active, and the recorded completion ratio is 4%. The development’s starting price is AED 450,000. The project is registered as a 105-unit residential building with one building in total.
Valores Property Development is the developer of Elevia Residences 3. Founded in 2024, the company is developing the project in International City 2. The development is positioned within a part of Warsan Fourth that is planned for a mix of residential areas, including mid-rise apartments. Valores Property Development is named as the developer across the project, while Aroma International Building Contracting is assigned as the construction company. Elevia Residences 3 is one of the residential projects planned within the wider International City 2 area, where private developers have delivered varied building designs across separately developed parcels.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 23 completed buildings in International City 2 for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Elevia Residences 3 — Continental Club Property, from Dubai Land Department registry and developer data, 2026-08-02, https://continentalclub.ae/project/elevia-residences-3-international-city-2/