Developer: Dar Al Aiham Properties · International City 2

Dar Al Aiham One

Dar Al Aiham One is a residential project by Dar Al Aiham Properties in International City 2, Dubai, with indicative prices from AED 505 000 (estimate from DLD sales; developer price not yet published), handover Q2 2027, construction 48.6% complete per the DLD registry, 71 apartments, 2 sold to first buyers per the DLD register (as of 23 Nov 2026).

Price fromAED 505 000Our calculationEstimate: median of DLD sales, last 12 months, studios, International City 2. Developer price not yet published.
Unit typesStudio · 1–3 BR1 647 ft²Developer supplied
HandoverQ2 2027Developer supplied
Construction48.6%DLD registry · checked 17.11.2026

· price from DLD deals · DLD data as of 23 Nov

≈70 of 71 apartments still available · DLD, 23 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeSize, sq.ft
Studio1 647
1 bedroom1 647
2 bedroom1 647
3 bedroom1 647

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~72 sq.ft (6.7 m²); 1 Bedroom — ~158 sq.ft (15 m²); 2 Bedroom — ~453 sq.ft (42 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 23 Nov 2026

≈70 of 71 apartments availableestimate

Sold to first buyers 2 (3%)Available ≈70

TypeTotalSoldAvailable
Studios10010
1 bedroom52250
2 bedrooms808
3 bedrooms101
Total71269

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded; this is an estimate.

Units left in every Dubai off-plan project →

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

48.62%
  • StatusActive
  • Construction started30.12.2025
  • HandoverQ2 2027
  • Status date17.11.2026
  • Progress between DLD inspections+27.84% (03.08.2026 → 17.11.2026)
  • Escrow bankUnited Bank Limited
  • DLD project number4323

Data from the Dubai Land Department project registry (updated 25.11.2026 05:55).

Inspection history 3
025507510008.01.202617.11.2026
Actual, per inspections

Pace: 4.73% per month. At this rate 100% falls on 13.10.2027.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 44
03.08.2026 20.78%
Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 1 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 2 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 3 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 4 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 5 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 6 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 7 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 8 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 9 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 10 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 11 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 12 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 13 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 14 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 15 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 16 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 17 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 18 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 19 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 20 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 21 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 22 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 23 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 24 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 25 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 26 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 27 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 28 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 29 of 30Dar Al Aiham One, International City 2 construction progress — 3 August 2026, 20.78% complete, photo 30 of 30
08.01.2026 0.00%
Dar Al Aiham One, International City 2 construction progress — 8 January 2026, 0.00% complete, photo 1 of 6Dar Al Aiham One, International City 2 construction progress — 8 January 2026, 0.00% complete, photo 2 of 6Dar Al Aiham One, International City 2 construction progress — 8 January 2026, 0.00% complete, photo 3 of 6Dar Al Aiham One, International City 2 construction progress — 8 January 2026, 0.00% complete, photo 4 of 6Dar Al Aiham One, International City 2 construction progress — 8 January 2026, 0.00% complete, photo 5 of 6Dar Al Aiham One, International City 2 construction progress — 8 January 2026, 0.00% complete, photo 6 of 6

8 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
23.11.20261 BR73.2851 000
05.10.20261 BR71.5866 045

Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 505 000 AED is 2 132 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Gym
  • Swimming pool
  • Jogging track
  • Lush landscaping
  • 24/7 security
  • Outdoor family seating
  • Kids area
  • Regular maintenance
Dar Al Aiham One

Your broker for this project

Boniface Anyange

Boniface Anyange

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Dar Al Aiham One: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Dar Al Aiham One is a G+1P+6 residential apartment development in International City 2, Dubai, by Dar Al Aiham Properties. The project comprises 71 apartments, with studios and one-, two- and three-bedroom apartment types. It is active, with reported construction completion at 48.62%, and handover is scheduled for Q2 2027.

The development and building design

Dar Al Aiham One is planned as a low-rise building with a ground floor, one podium level and six residential floors. Its 71 apartments are set within a design defined by clean lines, balanced geometry and minimal detailing. The building includes expansive outdoor spaces and landscaped areas. A natural-marble entrance and reception area form part of the arrival sequence, while controlled access points and 24/7 security are included in the project features. The design places floor-to-ceiling windows within the residences to bring natural light into the interiors and connect living areas with the outdoors. The building’s layouts are designed as open living spaces, with contemporary fixtures and premium finishes specified across the residences.

Apartment types and interiors

The unit mix at Dar Al Aiham One includes studios and one-, two- and three-bedroom apartments. Homes are listed with sizes of up to 1,647.20 sq ft. Interiors are planned with floor-to-ceiling windows, open layouts and fully fitted kitchens with appliances. The design also includes contemporary finishes and fixtures, with layouts intended to combine private areas and open living space. The residence planning incorporates functional storage solutions and private balconies. The unit selection provides choices ranging from studio accommodation to three-bedroom apartments within the same G+1P+6 building.

Amenities and resident facilities

Resident amenities at Dar Al Aiham One include a gym, swimming pool and jogging track. The outdoor provision includes lush landscaping, outdoor family seating and a dedicated kids area. A 24/7 security service is included, alongside regular maintenance. The gym and jogging track provide spaces for exercise, while the swimming pool is part of the leisure facilities. Family seating and the kids area form part of the outdoor amenities, with landscaping integrated across the development. Fully fitted kitchens are also included within the apartment specification.

International City 2 location

Dar Al Aiham One is located in International City 2, within Dubai’s Warsan 4 area. International City 2 forms part of the wider International City programme and contains low- and mid-rise residential neighbourhoods, newly released land parcels and a planned central zone for higher towers. The district is bounded by Emirates Road to the west, Academic City to the east, Dubai Silicon Oasis to the south and International City 1 to the north. The local masterplan includes a District Centre, a pedestrianised Ramblas spine, residential clusters, open-space areas and the International City Phase 3 residential sector. Roads and pavements are substantially in place across the district.

Nearby places and transport

A bus station is listed two minutes from Dar Al Aiham One, while the Blue Line Metro Station is listed three minutes away. A hospital is listed seven minutes away. Silicon North Park is 1.2 km from the project, Silicon Oasis Lake Park is 2.4 km away and Warsan Residential Park is 2.7 km away. Novo Cinema at Dragon Mall is 3.9 km away. Dubai Safari Park is 7.0 km from the development, Yalla Bowling at City Centre Mirdif is 7.9 km away, and Ras Al Khor Wildlife Sanctuary is 8.5 km away. Al Badia Golf Club is 8.4 km away, while The Track Meydan Golf is 8.5 km away.

Construction progress and handover

Dar Al Aiham One is active, with a reported completion ratio of 0.00. The recorded project start date is 30 December 2025, and the recorded completion date is 30 June 2027. Handover is scheduled for Q2 2027. The project is identified under project number 4323. Its current status places it at the start of the construction programme, ahead of the scheduled June 2027 completion date. Buyers considering the project can assess the stated handover timing alongside the available studio through three-bedroom apartment mix and the building’s listed amenities.

Dar Al Aiham Properties

Dar Al Aiham Properties is the developer of Dar Al Aiham One. The company was founded in 2025. Dar Al Aiham One is a residential project with 71 apartments in International City 2, combining studios and one-, two- and three-bedroom apartments in a G+1P+6 building. The development’s specified features include fully fitted kitchens, a marble-finished entrance, floor-to-ceiling windows, a gym, swimming pool, jogging track, landscaped areas, outdoor family seating, a kids area, regular maintenance and 24/7 security.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median14.29 AEDper sq ft per year · 154 AED/m²
Range in the area9.68 – 16.74AED per sq ft · 23 buildings
A 1,000 sq ft unit≈ 14,290 AEDper year at the median · ≈ $3,891
vs Dubai median▼ -10.8%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 23 completed buildings in International City 2 for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Dar Al Aiham One?
Dar Al Aiham One is developed by Dar Al Aiham Properties. The company was founded in 2025.
Where is Dar Al Aiham One located?
Dar Al Aiham One is located in International City 2 in Dubai’s Warsan 4 area. The district lies between Emirates Road, Academic City, Dubai Silicon Oasis and International City 1.
What apartment types are available at Dar Al Aiham One?
The project includes studios and one-, two- and three-bedroom apartments. Unit sizes are listed up to 1,647.20 sq ft.
How many homes are in Dar Al Aiham One?
Dar Al Aiham One has 71 apartments. The building is configured as G+1P+6.
When is the Dar Al Aiham One handover date?
Dar Al Aiham One handover (completion) is scheduled for Q2 2027 (developer data). The DLD register lists 30 June 2027. Construction progress was 48.62% at the DLD inspection of 17 November 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Dar Al Aiham One?
The project is active. Its reported completion ratio is 0.00.
What amenities are planned at Dar Al Aiham One?
Amenities include a gym, swimming pool, jogging track, lush landscaping, outdoor family seating, kids area, regular maintenance and 24/7 security. Apartments include fully fitted kitchens.
What is near Dar Al Aiham One?
A bus station is listed two minutes away, the Blue Line Metro Station three minutes away and a hospital seven minutes away. Silicon North Park is 1.2 km away and Novo Cinema at Dragon Mall is 3.9 km away.
How many apartments are left in Dar Al Aiham One?
According to the Dubai Land Department (DLD) register, as of 23 Nov 2026 ≈70 of 71 apartments in Dar Al Aiham One have no registered sale; 2 have been sold to first buyers (3%). This is an estimate. This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Dar Al Aiham One?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

PDF shortlist · updated 1 November 2026

International City 2: new projects and prices

23 projects · prices from DLD and developers

  1. Moonsa Residences Moonsa Residences International City 2 · Studio, 1–3 BR from AED 400,000
  2. Elevia Residences Elevia Residences International City 2 · Studio, 1–2 BR from AED 450,000
  3. Elevia Residences 3 Elevia Residences 3 International City 2 · Studio, 1–2 BR from AED 450,000

20 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Dar Al Aiham One — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-24, https://continentalclub.ae/project/dar-al-aiham-one-international-city-2/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.