by Laraix Developers in International City 2
Zyra Vista Residences is a residential project by Laraix Developers in International City 2, Dubai, with handover 31.03.2027, construction 2.1% complete per the DLD registry.
Construction progress
- Handover31.03.2027
- Status date01.07.2026
- DLD project number3560
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Laraix Developers · District: International City 2
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 20.07.2026 | 1 BR | 70.7 | 896 620 |
| 09.02.2026 | 2 BR | 134.0 | 1 276 330 |
| 09.02.2026 | 2 BR | 119.1 | 1 188 943 |
| 06.02.2026 | Studio | 34.2 | 459 197 |
| 26.01.2026 | Studio | 34.2 | 515 090 |
| 22.01.2026 | 1 BR | 69.8 | 886 470 |
| 22.12.2025 | 2 BR | 134.0 | 1 283 541 |
| 20.11.2025 | Studio | 34.2 | 533 486 |
| 14.11.2025 | 1 BR | 68.1 | 849 460 |
| 14.11.2025 | 1 BR | 68.1 | 898 467 |
| 14.11.2025 | 1 BR | 80.9 | 971 901 |
| 14.11.2025 | 1 BR | 69.8 | 909 007 |
| 10.11.2025 | 1 BR | 69.8 | 872 221 |
| 10.11.2025 | 1 BR | 75.4 | 961 834 |
| 10.11.2025 | 2 BR | 119.1 | 1 198 764 |
| 10.11.2025 | 1 BR | 70.7 | 897 723 |
| 10.11.2025 | 1 BR | 68.1 | 898 467 |
| 10.11.2025 | 1 BR | 68.0 | 897 016 |
| 07.11.2025 | 2 BR | 119.1 | 1 198 764 |
| 22.09.2025 | 2 BR | 119.1 | 1 198 764 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Zyra Vista Residences is a one-building residential development by Laraix Developers in International City 2, within Warsan Fourth. The building is configured with a basement, ground floor, six floors and a roof, with 51 residential units. The project is active, with a recorded completion ratio of 2.12% on 1 July 2026 and a scheduled completion date of 31 March 2027.
The project at a glance
Zyra Vista Residences is planned as a single residential building containing 51 units. Its registered building configuration is B+G+6 floors plus a roof, comprising a basement, ground level, six upper floors and roof level. The project occupies a total recorded area of 4109.16. Laraix Developers is the developer name used for Zyra Vista Residences. The development is located in International City 2, an area within Dubai’s Warsan 4 district. International City 2 is a planned extension of Nakheel’s International City programme and incorporates areas commonly known as Phase 2 and Phase 3. Its masterplan combines a central area designated for taller towers with surrounding low- and mid-rise neighbourhoods.
Residential building configuration
The development’s 51-unit count applies across its one residential building. The project description identifies a basement, ground floor, six floors and a roof, placing Zyra Vista Residences within the mid-rise residential format used across the International City Phase 3 area. International City 2 has been developed through private land parcels, resulting in varied architectural character between projects rather than a uniform building style. The district’s central circular area is allocated to taller towers, while other parts of the masterplan are intended for low- and mid-rise apartment buildings. International City Phase 3 is principally associated with mid-rise residential blocks.
Construction progress and scheduled completion
Zyra Vista Residences started on 5 April 2025. The project is active and recorded a 2.12% completion ratio at its inspection on 1 July 2026. Its scheduled completion date is 31 March 2027. The development has 51 units and one building, with the same unit count applying to the building configuration recorded for the project. International City 2 is in an early stage of development, with mid-rise and low-rise residential neighbourhoods, released land parcels and a central zone designated for taller buildings. Public-realm, landscaping and utility works in the wider district are being established through a staged masterplan.
International City 2 and Warsan Fourth
International City 2 occupies land in Warsan 4. The district is bounded by Emirates Road to the west, Academic City to the east, Dubai Silicon Oasis to the south and International City 1 to the north. A high-voltage power reservation corridor forms part of the northern separation from International City 1. Along the eastern boundary, frontage to Academic City Road is separated from the site by an easement reserved for a potential Dubai–Sharjah gas pipeline. The masterplan is divided into five character zones: District Centre, The Ramblas, Residential Clusters, Open Space areas and International City Phase 3. District Centre is planned as a mixed-use area with mid-rise offices, retail buildings and active street frontages. The Ramblas is planned as a pedestrianised spine with mixed-use buildings and ground-floor retail.
Local infrastructure and neighbourhood development
Roads and pavements are substantially in place across International City 2, with pavements installed along most streets. Landscaping and planted greenery remain limited while public open spaces are established in stages. The district has a small number of grocery and retail outlets in operation. Infrastructure works include roads, district cooling, power and communications networks, water distribution, sewerage, fire services and irrigation. Residential Clusters in the masterplan are supported by shops, health services, offices and food-and-beverage outlets. Open Space areas include district parks, community parks, playgrounds and plazas, alongside educational precincts for schools and nurseries. Greenview, formerly identified as Phase 2, was redesigned for townhouses and villas, while Phase 3 is associated primarily with mid-rise apartment buildings.
Schools and transport context
Kings’ School Nad Al Sheba is 0.3 km from Zyra Vista Residences, while Repton School Dubai is 0.6 km away. Repton School Dubai has an Outstanding government inspection rating, and GEMS Modern Academy also has an Outstanding rating. Eight nearby schools have achieved either Very Good or Outstanding inspection ratings. The nearest Dubai Metro station is on the Red Line and is 9,071 metres from International City 2. A Blue Line metro route and station are planned for the corridor between Phase 2 and Phase 3. Dubai Silicon Oasis lies immediately south of the district, although there is currently no direct transport connection from International City 2 to Dubai Silicon Oasis.