Developer: Meraas · City Walk Phase 3
City Walk Crestlane 4 is a residential project by Meraas in City Walk Phase 3, Dubai, with prices from AED 2 700 000, handover Q2 2030, construction 0% complete per the DLD registry, 201 apartments (+3 non-residential units), 186 sold to first buyers per the DLD register (as of 23 Nov 2026).
· DLD data as of 23 Nov
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 89 | 788–839 |
| 2 Bedroom | 72 | 1 189–1 588 |
| 3 Bedroom | 30 | 2 083–3 908 |
| 4 Bedroom | 10 | 4 648–6 828 |
| Other units | 3 | 736–1 563 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~68 sq.ft (6.3 m²); 2 Bedroom — ~70 sq.ft (6.5 m²); 3 Bedroom — ~322 sq.ft (30 m²); 4 Bedroom — ~1581 sq.ft (147 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈15 of 201 apartments availableestimate
Sold to first buyers 186 (93%)Available ≈15
| Type | Total | Sold | Available |
|---|---|---|---|
| 1 bedroom | 89 | 83 | 6 |
| 2 bedrooms | 72 | 72 | 0 |
| 3 bedrooms | 30 | 30 | 0 |
| 4+ bedrooms | 10 | 1 | 9 |
| Total | 201 | 186 | 15 |
| Building | Apartments | Sold | Available |
|---|---|---|---|
| Building A | 110 | 105 | 5 |
| Building B | 91 | 81 | 10 |
| Whole project | 201 | 186 | 15 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded; this is an estimate. Non-residential units (3) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2030 →
Data from the Dubai Land Department project registry (updated 24.11.2026 05:55).
The register shows the same percentage as at the inspection on 16.12.2025.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
15 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Meraas · District: City Walk Phase 3
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 75 | 2 769 000 | 36 920 | 83 |
| 2 bedrooms | 117 | 4 018 000 | 34 342 | 72 |
| 3 bedrooms | 200 | 7 681 000 | 38 405 | 30 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 20.10.2026 | 1 BR | 74.7 | 2 677 000 |
| 07.10.2026 | 1 BR | 74.8 | 2 684 000 |
| 16.09.2026 | 1 BR | 74.7 | 2 776 000 |
| 16.09.2026 | 3 BR | 290.7 | 10 661 000 |
| 26.08.2026 | 1 BR | 74.7 | 2 684 000 |
| 26.08.2026 | 3 BR | 200.9 | 7 225 000 |
| 25.08.2026 | 1 BR | 74.7 | 2 704 000 |
| 25.08.2026 | 1 BR | 78.0 | 2 723 000 |
| 17.08.2026 | 1 BR | 73.2 | 2 656 000 |
| 12.08.2026 | 3 BR | 352.8 | 12 090 000 |
| 20.07.2026 | 1 BR | 78.0 | 2 710 000 |
| 16.07.2026 | 3 BR | 352.8 | 12 149 000 |
| 01.07.2026 | 4 BR | 584.6 | 17 659 000 |
| 01.07.2026 | 1 BR | 73.2 | 2 664 000 |
| 01.07.2026 | 1 BR | 78.0 | 2 742 000 |
| 22.06.2026 | 1 BR | 75.6 | 2 828 000 |
| 19.06.2026 | 1 BR | 74.8 | 2 677 000 |
| 01.06.2026 | 1 BR | 78.0 | 2 736 000 |
| 22.05.2026 | 3 BR | 200.2 | 7 366 000 |
| 21.05.2026 | 1 BR | 74.7 | 2 676 000 |
| 21.05.2026 | 1 BR | 73.2 | 2 658 000 |
| 15.05.2026 | 1 BR | 75.6 | 2 873 000 |
| 14.05.2026 | 1 BR | 73.2 | 2 948 000 |
| 14.05.2026 | 1 BR | 73.2 | 2 662 000 |
| 14.05.2026 | 1 BR | 73.2 | 2 650 000 |
| 14.05.2026 | 1 BR | 75.6 | 2 881 000 |
| 14.05.2026 | 1 BR | 78.0 | 2 730 000 |
| 14.05.2026 | 1 BR | 74.7 | 2 769 000 |
| 14.05.2026 | 1 BR | 74.7 | 2 676 000 |
| 14.05.2026 | 1 BR | 74.7 | 2 776 000 |
| 14.05.2026 | 1 BR | 74.7 | 2 683 000 |
| 14.05.2026 | 1 BR | 74.7 | 2 704 000 |
| 14.05.2026 | 1 BR | 73.2 | 2 950 000 |
| 14.05.2026 | 1 BR | 73.2 | 2 749 000 |
| 14.05.2026 | 1 BR | 73.2 | 2 656 000 |
| 28.04.2026 | 2 BR | 110.3 | 3 491 000 |
| 27.04.2026 | 1 BR | 73.2 | 2 964 000 |
| 27.04.2026 | 2 BR | 110.5 | 3 595 000 |
| 27.04.2026 | 1 BR | 74.7 | 2 696 000 |
| 27.04.2026 | 1 BR | 73.2 | 2 751 000 |
| 20.04.2026 | 3 BR | 371.6 | 11 729 000 |
| 17.04.2026 | 3 BR | 198.8 | 7 189 000 |
| 17.04.2026 | 1 BR | 73.2 | 2 763 000 |
| 17.04.2026 | 3 BR | 205.0 | 7 211 000 |
| 16.04.2026 | 1 BR | 73.2 | 2 749 000 |
| 16.04.2026 | 2 BR | 147.4 | 5 111 000 |
| 13.04.2026 | 2 BR | 116.4 | 3 784 000 |
| 09.04.2026 | 2 BR | 117.0 | 3 795 000 |
| 09.04.2026 | 3 BR | 205.0 | 7 211 000 |
| 09.04.2026 | 1 BR | 74.7 | 2 769 000 |
Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 700 000 AED is 11 401 AED.
Estimates only; not a bank approval.


Tetiana Karpenko
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about City Walk Crestlane 4: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
City Walk Crestlane 4 is a residential development by Meraas in City Walk Phase 3, Dubai. The project comprises 201 apartments (+3 non-residential units), including apartments, residences and duplexes. It is active, with a recorded completion ratio of 1%, and handover is scheduled for Q2 2030.
City Walk Crestlane 4 forms part of the Crestlane residences in City Walk, a development of two mid-rise towers. The homes are positioned alongside water features and landscaped park areas, with selected residences offering direct access to water features and park landscapes. Design features include double-height living areas, private terraces and panoramic park vistas. Designated residences have private lift access from designated parking. The development also incorporates sweeping city views, water-focused spaces and landscaped outdoor areas. City Walk is a mixed-use destination with residences, retail, restaurants and hotels, set within a pedestrian-oriented urban setting.
The selection includes one-, two- and three-bedroom apartments, three-bedroom residences, four-bedroom residences and four-bedroom duplexes. The project therefore provides layouts ranging from one-bedroom homes to larger duplex residences. Private terraces are a stated feature of the development, while double-height living areas form part of the residential design. Certain homes have direct park access, and designated residences include private lift access from parking. The recorded total is 201 apartments (+3 non-residential units). Starting prices are AED 2.7 million. Individual home pricing and availability vary by unit type and layout.
City Walk Crestlane 4 includes infinity pools, beach-style pools and children’s pools. Outdoor recreation facilities include a padel court, tennis court, jogging tracks and cycling lanes. Residents also have access to yoga and exercise lawns, outdoor fitness stations, a cardio space, weights area, training studio and yoga studio. Water features, sunken seats, landscaped spaces and an events lawn extend the outdoor amenity offering. The development also includes an outdoor cinema, providing a dedicated open-air screening space. These facilities combine pool, fitness, sports and landscaped social areas within the residential setting.
The project includes community hubs, a community lounge and a collaborative suite. Indoor facilities also include a library, games room, multipurpose space and a double-height lobby. Children’s facilities comprise a kids’ play area and kids’ pools. An events lawn provides an outdoor setting for community gatherings, while sunken seating is incorporated alongside water features. The multipurpose space is connected with park access. Together with private terraces, park landscapes and water features, these areas provide a range of indoor and outdoor settings across the development.
City Walk Crestlane 4 is located in City Walk Phase 3. City Walk Mall is 2 minutes away, while Downtown Dubai is 5 minutes away and Dubai Mall is 7 minutes away. Jumeirah Beach is 10 minutes away, DIFC is 11 minutes away and DXB Airport is 15 minutes away. City Walk Central Park is 0.3 km from the project, and Vox Cinema at Galleria Mall Al Wasl is 0.4 km away. Roxy Cinema at The Hub at City Walk is 0.6 km away. Other nearby destinations include Boxpark at 1.2 km, Mercato Beach at 1.4 km and Jumeirah Fishing Harbour at 1.5 km.
City Walk Crestlane 4 is offered with a 75/25 payment plan. The payment structure requires 20% on booking, followed by 55% during construction and the remaining 25% on handover. Handover is scheduled for Q2 2030, with a recorded completion date of 25 April 2030. The project is active and its recorded completion ratio is 1%. The construction start date is recorded as 25 February 2026. This structure places 75% of the purchase price across booking and the construction period, with 25% due at handover.
Meraas is the developer of City Walk Crestlane 4. Its portfolio includes Bluewaters Residences, Bvlgari Residences, Port de La Mer, Jumeirah Bay, City Walk Residences, Nikki Beach Residences and La Mer Maisons. City Walk Crestlane 4 is part of City Walk, where the residential setting combines apartments with streetside retail, dining, leisure spaces and hotels. The development adds a collection of waterfront-oriented residences, landscaped areas and shared facilities to the City Walk address.
Compare with other projects under construction: new off-plan launches in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 6 completed buildings in City Walk Phase 3 for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in City Walk Crestlane 4 between 9 Apr 2026 and 20 Oct 2026: median 36 136 AED/m² (3 357 AED/sq ft); half of the deals fell between 35 118 and 37 048 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 2 709 000 | 35 | 36 269 | 74.7 |
| 2 BR | AED 3 785 000 | 5 | 32 517 | 116.4 |
| 3 BR | AED 7 210 000 | 9 | 35 172 | 205 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai new projects AED 2–5 million
30 projects · prices from DLD and developers
Sands Phase 2 by Ellington Deira Central · 1–4 BR
from AED 2,600,000
The Cape Majan · 1–4 BR
from AED 3,550,000
South Bay 2 South Bay 2
from AED 3,675,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
186 of 201 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 186 (since 2026). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:City Walk Crestlane 4 — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-22, https://continentalclub.ae/project/city-walk-crestlane-4-city-walk-phase-3/