Developer: Meraas · City Walk Phase 3
City Walk Crestlane 3 is a residential project by Meraas in City Walk Phase 3, Dubai, with prices from AED 2 600 000, handover Q4 2028, construction 4.6% complete per the DLD registry, 193 apartments (+2 non-residential units), 191 sold to first buyers per the DLD register (as of 23 Nov 2026).
· DLD data as of 23 Nov
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 79 | 788–807 |
| 2 Bedroom | 72 | 1 184–1 407 |
| 3 Bedroom | 34 | 1 808–3 452 |
| 4 Bedroom | 8 | 4 588–4 928 |
| Other units | 2 | 703–727 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~67 sq.ft (6.2 m²); 2 Bedroom — ~70 sq.ft (6.5 m²); 3 Bedroom — ~217 sq.ft (20 m²); 4 Bedroom — ~1190 sq.ft (111 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
fewer than 10 of 193 apartments availableestimate
Sold to first buyers 191 (99%)Available fewer than 10
| Type | Total | Sold | Available |
|---|---|---|---|
| 1 bedroom | 79 | 79 | 0 |
| 2 bedrooms | 72 | 72 | 0 |
| 3 bedrooms | 34 | 34 | 0 |
| 4+ bedrooms | 8 | 6 | 2 |
| Total | 193 | 191 | 2 |
| Building | Apartments | Sold | Available |
|---|---|---|---|
| Building A | 112 | 111 | 1 |
| Building B | 81 | 80 | 1 |
| Whole project | 193 | 191 | 2 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded; this is an estimate. Non-residential units (2) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 24.11.2026 05:55).
Pace: 0.46% per month. At this rate we do not project a completion date: it falls more than 10 years out.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
84 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Meraas · District: City Walk Phase 3
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 75 | 2 616 000 | 34 880 | 82 |
| 2 bedrooms | 110 | 3 356 000 | 30 509 | 72 |
| 3 bedrooms | 168 | 6 338 000 | 37 726 | 35 |
| 4 bedrooms | 431 | 16 725 000 | 38 805 | 6 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 30.07.2026 | 1 BR | 74.9 | 2 629 000 |
| 22.07.2026 | 1 BR | 73.2 | 2 666 000 |
| 03.07.2026 | 3 BR | 320.6 | 10 158 000 |
| 18.02.2026 | 1 BR | 73.3 | 2 570 000 |
| 10.07.2025 | 3 BR | 168.3 | 6 369 000 |
| 17.06.2025 | 2 BR | 128.8 | 4 381 000 |
| 11.06.2025 | 1 BR | 73.3 | 2 628 000 |
| 29.05.2025 | 3 BR | 181.2 | 6 063 000 |
| 29.05.2025 | 3 BR | 181.3 | 6 049 000 |
| 29.05.2025 | 3 BR | 168.3 | 6 134 000 |
| 29.05.2025 | 2 BR | 110.1 | 3 242 000 |
| 26.05.2025 | 1 BR | 74.9 | 2 621 000 |
| 21.05.2025 | 3 BR | 168.3 | 6 096 000 |
| 21.05.2025 | 2 BR | 110.1 | 3 234 000 |
| 21.05.2025 | 1 BR | 74.8 | 2 595 000 |
| 21.05.2025 | 1 BR | 73.3 | 2 628 000 |
| 21.05.2025 | 1 BR | 74.8 | 2 640 000 |
| 21.05.2025 | 1 BR | 73.3 | 2 622 000 |
| 21.05.2025 | 2 BR | 110.1 | 3 588 000 |
| 21.05.2025 | 1 BR | 73.3 | 2 564 000 |
| 21.05.2025 | 2 BR | 110.0 | 3 234 000 |
| 21.05.2025 | 2 BR | 110.0 | 3 583 000 |
| 21.05.2025 | 3 BR | 320.9 | 10 626 000 |
| 21.05.2025 | 1 BR | 73.2 | 2 640 000 |
| 21.05.2025 | 4 BR | 447.8 | 14 863 000 |
| 21.05.2025 | 1 BR | 73.3 | 2 621 000 |
| 21.05.2025 | 1 BR | 71.8 | 2 812 000 |
| 21.05.2025 | 1 BR | 74.8 | 2 582 000 |
| 21.05.2025 | 3 BR | 268.2 | 6 699 000 |
| 21.05.2025 | 2 BR | 110.1 | 3 298 000 |
| 21.05.2025 | 1 BR | 73.3 | 2 583 000 |
| 21.05.2025 | 2 BR | 110.4 | 3 553 000 |
| 20.05.2025 | 1 BR | 74.6 | 2 637 000 |
| 20.05.2025 | 2 BR | 110.1 | 3 596 000 |
| 20.05.2025 | 3 BR | 168.3 | 6 353 000 |
| 20.05.2025 | 2 BR | 128.4 | 4 493 000 |
| 20.05.2025 | 1 BR | 74.9 | 2 608 000 |
| 20.05.2025 | 1 BR | 74.9 | 2 602 000 |
| 20.05.2025 | 2 BR | 110.1 | 3 207 000 |
| 20.05.2025 | 2 BR | 109.9 | 3 225 000 |
| 20.05.2025 | 3 BR | 198.8 | 9 419 000 |
| 20.05.2025 | 3 BR | 168.1 | 6 128 000 |
| 05.05.2025 | 3 BR | 202.0 | 7 676 000 |
| 05.05.2025 | 1 BR | 74.8 | 2 609 000 |
| 02.05.2025 | 1 BR | 73.4 | 2 604 000 |
| 02.05.2025 | 1 BR | 73.3 | 2 589 000 |
| 02.05.2025 | 2 BR | 115.3 | 3 340 000 |
| 02.05.2025 | 3 BR | 202.0 | 7 657 000 |
| 02.05.2025 | 2 BR | 129.0 | 4 274 000 |
| 02.05.2025 | 1 BR | 74.8 | 2 601 000 |
Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 600 000 AED is 10 979 AED.
Estimates only; not a bank approval.


Tetiana Karpenko
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about City Walk Crestlane 3: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
City Walk Crestlane 3 is a two-tower residential development by Meraas in City Walk Phase 3, Al Wasl. The project comprises 193 apartments (+2 non-residential units) and is active, with construction reported at 4.59% complete. Completion is scheduled for Q4 2028.
City Walk Crestlane 3 forms part of the Crestlane collection within City Walk. The development comprises two mid-rise towers, with a shared basement level, ground floor and rooftop levels. The buildings are arranged beside water features and a park, and the residences have direct access to these outdoor areas. The architectural approach combines contemporary lines, extensive glazing and landscaped terraces. Water is a defining element of the setting, with cascading features, lagoon-style spaces and waterside seating integrated into the community. The ground level includes two retail spaces accessed from the building façade beside the main lobby. The wider City Walk setting combines residences, retail and leisure spaces along pedestrian-oriented streets in Al Wasl.
The residence mix at City Walk Crestlane 3 includes one-, two- and three-bedroom apartments, signature three- and four-bedroom apartments, and four-bedroom duplexes. The project includes 193 apartments (+2 non-residential units) in total. Selected homes feature double-height living areas, walk-in closets, large balconies or private terraces, while designated residences have private lift access from parking. Some units are designed with 180-degree views. The residences are positioned to overlook the park or water features, with layouts intended to connect indoor spaces with the surrounding community. The two towers provide a mid-rise residential format within City Walk, rather than a single high-rise building.
The community amenities centre on water features, swimming pools and landscaped outdoor spaces. Pool options include an infinity pool, a beach-style pool and a dedicated kids’ pool. Residents also have access to padel and tennis courts, jogging tracks, cycling tracks and outdoor fitness stations. Community hubs, event lawns, yoga and exercise lawns, seating lawns and sunken seats provide spaces for recreation and gatherings. A water cinema and pet park are also included. Each building has themed indoor kids’ play areas. The project’s outdoor design places the water features and park alongside the residential towers, giving residents direct access to the landscaped community areas.
City Walk Crestlane 3 includes dedicated facilities for fitness, work and social use. The cardio space, weights area and training studio form part of the fitness offering, alongside a yoga studio. The community lounge combines indoor and outdoor areas and includes sunken seating overlooking the pool and waterscape. A collaborative suite provides workstations and a library for reading and focused work. A sky deck is also part of the amenity collection. These shared spaces sit alongside the outdoor tracks, sports courts and lawns, creating separate settings for exercise, social activity and quiet work within the development.
City Walk Crestlane 3 is located in City Walk Phase 3 in Al Wasl. City Walk Mall is listed two minutes away, while Dubai Mall and Jumeirah Beach are each listed seven minutes away. DIFC is listed 11 minutes away and DXB Airport 15 minutes away. Sheikh Zayed Road is listed three minutes away. Nearby destinations also include City Walk Central Park at 0.4 km, Roxy Cinema at The Hub at City Walk at 0.8 km and Boxpark at 1.0 km. Vox Cinema at Galleria Mall Al Wasl is listed at 0.2 km, while Mercato Beach and Jumeirah Fishing Harbour are each listed at 1.3 km.
Prices for City Walk Crestlane 3 start from AED 2.6 million. The payment plan is structured as 75/25: a 20% down payment is due on booking, 55% is payable during construction and the remaining 25% is due on handover. The project is scheduled for completion in Q4 2028, with a recorded completion date of 10 December 2028. Construction started on 16 April 2025. The project is active and its reported completion ratio is 4.59%. The development is planned as a 193-apartment residential project in City Walk Phase 3.
Meraas is the developer of City Walk Crestlane 3 and the master developer of City Walk. The Crestlane project is positioned within City Walk’s mixed-use urban setting in Al Wasl, where residential buildings sit alongside retail, leisure and pedestrian spaces. Crestlane 3 is one of the developments within the City Walk Crestlane collection. Its two mid-rise towers extend the City Walk residential offering with homes facing the water features and park, supported by shared leisure, fitness, work and community facilities. The project’s completion is scheduled for Q4 2028.
Compare with other projects under construction: off-plan property in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 6 completed buildings in City Walk Phase 3 for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in City Walk Crestlane 3 between 2 May 2025 and 30 Jul 2026: median 34 939 AED/m² (3 246 AED/sq ft); half of the deals fell between 32 773 and 35 841 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 2 586 000 | 22 | 35 281 | 73.3 |
| 2 BR | AED 3 422 000 | 14 | 31 078 | 110.1 |
| 3 BR | AED 6 608 000 | 13 | 36 450 | 181.3 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai new projects AED 2–5 million
30 projects · prices from DLD and developers
Sands Phase 2 by Ellington Deira Central · 1–4 BR
from AED 2,600,000
The Cape Majan · 1–4 BR
from AED 3,550,000
South Bay 2 South Bay 2
from AED 3,675,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
191 of 193 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 195 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:City Walk Crestlane 3 — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-17, https://continentalclub.ae/project/city-walk-crestlane-3-city-walk-phase-3/