Developer: Meraas · Madinat Jumeirah Living

Nourelle

Nourelle is a residential project by Meraas in Madinat Jumeirah Living, Dubai, with prices from AED 3 680 000, handover Q2 2029, construction 6.3% complete per the DLD registry, 236 apartments, 220 sold to first buyers per the DLD register (as of 23 Nov 2026).

Price fromAED 3 680 000Developer supplied
Unit types1–4 BR843–5 623 sq.ftDLD registry
HandoverQ2 2029Developer suppliedDLD registry: 01.03.2029
Construction6.3%DLD registry · checked 03.11.2026

· DLD data as of 23 Nov

≈16 of 236 apartments still available · DLD, 23 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom80843–971
2 Bedroom1051 245–2 084
3 Bedroom491 908–2 663
4 Bedroom24 731–5 623

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: 1 Bedroom — ~83 sq.ft (7.7 m²); 2 Bedroom — ~159 sq.ft (15 m²); 3 Bedroom — ~311 sq.ft (29 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 23 Nov 2026

≈16 of 236 apartments availableestimate

Sold to first buyers 220 (93%)Available ≈16

TypeTotalSoldAvailable
1 bedroom806614
2 bedrooms1051041
3 bedrooms49481
4+ bedrooms220
Total23622016
By building (3)
BuildingApartmentsSoldAvailable
Building 1665016
Building 281810
Building 389890
Whole project23622016

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded; this is an estimate.

Units left in every Dubai off-plan project →

Payment plan 75/25 75% before handover · 25% on handover

The purchase price is split into these stages.

120%Down payment
255%During construction
325%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

6.29%
  • StatusActive
  • Construction started07.12.2025
  • HandoverQ2 2029
  • Status date03.11.2026
  • Progress between DLD inspections+2.34% (14.07.2026 → 03.11.2026)
  • Escrow bankMashreq Bank
  • Scale3 bldg
  • DLD project number4108

Data from the Dubai Land Department project registry (updated 26.11.2026 05:55).

Inspection history 4
025507510023.09.202503.11.2026
Actual, per inspections

Pace: 0.95% per month. At this rate 100% falls on 24.01.2035.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 66
14.07.2026 3.95%
Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 1 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 2 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 3 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 4 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 5 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 6 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 7 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 8 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 9 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 10 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 11 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 12 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 13 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 14 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 15 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 16 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 17 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 18 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 19 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 20 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 21 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 22 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 23 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 24 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 25 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 26 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 27 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 28 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 29 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 30 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 31 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 32 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 33 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 34 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 35 of 36Nourelle, Madinat Jumeirah Living construction progress — 14 July 2026, 3.95% complete, photo 36 of 36

30 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Nourelle

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

220DLD registrations incl. resales, since 2025
30 370AED per m², median
0%resale, the rest bought from the developer
-27%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved -6% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom792 979 00037 70966
2 bedrooms1293 861 00029 930104
3 bedrooms2076 532 00031 55648

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
28.10.20262 BR137.85 460 000
07.07.20261 BR78.53 964 000
01.07.20262 BR137.05 587 000
21.05.20261 BR96.94 195 000
19.05.20261 BR77.84 111 000
11.05.20261 BR83.43 989 000
31.03.20261 BR80.93 941 000
06.03.20262 BR125.15 403 000
23.02.20262 BR119.65 411 000
23.02.20261 BR79.14 182 000
10.02.20261 BR78.44 302 000
06.02.20262 BR118.05 238 000
05.02.20263 BR198.99 468 000
06.01.20262 BR116.92 893 000
06.01.20262 BR118.05 286 000
06.01.20263 BR216.27 177 000
06.01.20262 BR118.72 655 000
06.01.20263 BR177.05 715 000
06.01.20263 BR213.65 244 000
06.01.20261 BR78.92 395 000
06.01.20262 BR166.03 439 000
06.01.20262 BR142.73 751 000
06.01.20261 BR78.32 377 000
06.01.20263 BR180.44 678 000
06.01.20261 BR78.52 215 000
06.01.20262 BR129.12 931 000
06.01.20263 BR206.46 505 000
06.01.20263 BR178.65 596 000
06.01.20263 BR177.75 696 000
06.01.20261 BR78.62 279 000
06.01.20261 BR78.92 285 000
06.01.20261 BR78.32 268 000
06.01.20262 BR125.82 989 000
06.01.20263 BR216.26 503 000
06.01.20263 BR206.56 181 000
06.01.20263 BR177.04 923 000
06.01.20261 BR78.92 351 000
06.01.20261 BR78.32 334 000
06.01.20261 BR78.74 353 000
06.01.20262 BR128.13 806 000
06.01.20263 BR216.47 106 000
06.01.20261 BR83.32 456 000
06.01.20261 BR86.02 475 000
06.01.20261 BR85.12 454 000
06.01.20263 BR206.67 142 000
06.01.20262 BR129.92 949 000
06.01.20264 BR439.519 954 000
06.01.20262 BR116.82 683 000
06.01.20262 BR111.83 307 000
06.01.20261 BR77.92 199 000

Dubai Land Department transaction registry, updated 25.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 3 680 000 AED is 15 540 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Day care centres
  • Swimming pools
  • Community stores
  • Pocket parks
  • Pool deck
  • Drop-off area
  • Gym
  • Yoga studio
  • Kids’ play areas
  • Sky gardens
  • Courtyard and gardens
  • Lobby
  • Lift lobby
  • Residents’ lounge
  • Infinity pool

What is nearby

  • Blue Waters15 min
  • Dubai International Airport25 min
  • Dubai Mall20 min
  • Mall of the Emirates5 min
  • Palm Jumeirah10 min
  • Sheikh Zayed Road2 min
Nourelle

Your broker for this project

Elena Orlova

Elena Orlova

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Nourelle: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Nourelle is an active residential development by Meraas in Madinat Jumeirah Living, comprising three residential buildings and 236 apartments. Construction started on 7 December 2025 and the project was 3.95% complete at its inspection on 14 July 2026. Handover is scheduled for Q2 2029.

Three buildings connected by a skybridge

Nourelle is planned as a trio of residential buildings, with two of the buildings connected by a sculptural skybridge. Each building has a basement, ground floor, 12 residential floors and a roof level. The design incorporates contemporary façades, geometric proportions, integrated greenery and large windows intended to bring natural light into the homes. Sky gardens form part of the skybridge, while landscaped greenery is also planned at ground level and around the arrival area. The entrance includes a drop-off area, water feature, canopy and lobby spaces. The development sits beside Jumeirah Burj Al Arab, Jumeirah Marsa Al Arab and Jumeirah Beach Hotel.

Apartments and residence mix

The project contains 236 apartments across its three buildings. The registered mix includes 80 one-bedroom apartments, 103 two-bedroom apartments and 49 three-bedroom apartments. The remaining homes comprise one four-bedroom residence, two duplexes and one penthouse. One- to four-bedroom homes are offered within the development, and select layouts include expansive terraces. Three-bedroom residences include ensuite bedrooms, while the four-bedroom residence includes walk-in closets. Open-plan kitchen, dining and living areas are planned within the residences, with balconies forming part of the home layouts. The development’s starting price is AED 3.68 million.

Pools, gardens and everyday facilities

Amenities at Nourelle include swimming pools, an infinity pool and a pool deck. The skybridge incorporates sky gardens and pool areas, while the wider landscape includes pocket parks, a courtyard and gardens. Fitness provision consists of a gym, a rooftop gym studio, a yoga studio and a rooftop yoga studio. Residents’ facilities also include a lounge, lobby and lift lobby. For families, the project includes kids’ play areas and day care centres. Community stores are planned for daily essentials. The amenity programme combines garden spaces, wellness facilities, water features and dedicated areas for children within the three-building development.

Madinat Jumeirah Living setting

Nourelle is located in Madinat Jumeirah Living in Umm Suqeim 3, beside Jumeirah Burj Al Arab. Madinat Jumeirah is 1.0 km from the project, while Wild Wadi is 1.2 km away. Mall of the Emirates and its VOX Cinemas are 1.5 km away, and Sunset Beach and Umm Suqeim Park are each 2.0 km away. Al Barsha 1 Park is 2.7 km from Nourelle. The project’s setting places it within the Madinat Jumeirah Living residential community and close to the Jumeirah coast. Jumeirah Marsa Al Arab and Jumeirah Beach Hotel are adjacent to the development.

Connections to key destinations

Sheikh Zayed Road is listed at 2 minutes from Nourelle, and Palm Jumeirah at 5 minutes. The Dubai Mall is listed at 10 minutes, while Mall of the Emirates is listed at 15 minutes. Bluewaters Island is listed at 20 minutes and DXB Airport at 25 minutes. These connections place the project near major road access, retail destinations, Palm Jumeirah, Bluewaters Island and Dubai International Airport. The nearby local area also includes Emirates Golf Club at 5.8 km, Dubai Hills Golf Club at 7.1 km and Cinema Akil at Alserkal Avenue at 3.4 km.

Payment plan and handover

Nourelle has a 75/25 payment plan. The payment structure requires a 20% down payment on booking, followed by 55% during construction and 25% on handover. The scheduled handover period is Q2 2029. The project commenced construction on 7 December 2025. Its recorded construction status is Active, with a completion ratio of 3.95% at the 14 July 2026 inspection. The development’s registered completion date is 1 March 2029. Buyers can therefore assess the payment schedule alongside the project’s construction progress and stated handover period.

Meraas

Nourelle is developed by Meraas. Meraas has developed residential addresses in Dubai including Bluewaters Residences, Bvlgari Residences, Port de La Mer, Jumeirah Bay, City Walk Residences, Nikki Beach Residences, La Mer Maisons and Bluewaters Residences. At Nourelle, Meraas is delivering a three-building residential project within Madinat Jumeirah Living. The project combines one- to four-bedroom residences with duplex and penthouse homes, sky gardens, pools, fitness facilities, community stores, day care centres and landscaped outdoor areas. The planned handover is Q2 2029.

Frequent questions

Who is the developer of Nourelle?
Nourelle is developed by Meraas.
Where is Nourelle located?
Nourelle is located in Madinat Jumeirah Living in Umm Suqeim 3, adjacent to Jumeirah Burj Al Arab.
What types of homes are available at Nourelle?
The development includes one-, two-, three- and four-bedroom residences, as well as two duplexes and one penthouse.
How many units are there at Nourelle?
Nourelle contains 236 apartments across three buildings.
What is the starting price at Nourelle?
The starting price is AED 3.68 million.
What is Nourelle’s payment plan?
The payment plan is 75/25: 20% on booking, 55% during construction and 25% on handover.
When is the Nourelle handover date?
Nourelle handover (completion) is scheduled for Q2 2029 (developer data). The DLD register lists 1 March 2029. Construction progress was 6.29% at the DLD inspection of 3 November 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Nourelle?
Nourelle is Active and was 3.95% complete at its inspection on 14 July 2026.
What amenities are planned at Nourelle?
Amenities include swimming pools, an infinity pool, sky gardens, a gym, yoga studios, pocket parks, community stores, day care centres and kids’ play areas.
What is near Nourelle?
Madinat Jumeirah is 1.0 km away, Wild Wadi is 1.2 km away, and Sunset Beach is 2.0 km away.
How many apartments are left in Nourelle?
According to the Dubai Land Department (DLD) register, as of 23 Nov 2026 ≈16 of 236 apartments in Nourelle have no registered sale; 220 have been sold to first buyers (93%). This is an estimate. This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Nourelle?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Nourelle between 6 Jan 2026 and 28 Oct 2026: median 30 215 AED/m² (2 807 AED/sq ft); half of the deals fell between 28 367 and 43 278 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
1 BRAED 2 371 0002030 08378.8
2 BRAED 3 503 0001627 936125.4
3 BRAED 6 504 0001331 510206.4
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Dubai new projects AED 2–5 million

30 projects · prices from DLD and developers

  1. Sands Phase 2 by Ellington Sands Phase 2 by Ellington Deira Central · 1–4 BR from AED 2,600,000
  2. The Cape The Cape Majan · 1–4 BR from AED 3,550,000
  3. South Bay 2 South Bay 2 South Bay 2 from AED 3,675,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Nourelle worth?

220 of 236 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 220 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Meraas

All 94 projects by Meraas →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Nourelle — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-29, https://continentalclub.ae/project/nourelle-madinat-jumeirah-living/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.