Developer: Binghatti Developers · JVC District 12

Binghatti Aurora

Binghatti Aurora is a residential project by Binghatti Developers in JVC District 12, Dubai, with prices from AED 700 000, construction 100% complete per the DLD registry, 275 units, 333 DLD-registered sales since 2024.

Price fromAED 700 000Developer supplied
Unit typesStudio · 1 · 2 BR379–1 975 ft²DLD registry
StatusReadyDLD registry

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio92379–461
1 Bedroom163733–1 014
2 Bedroom20996–1 975

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~51 sq.ft (4.7 m²); 1 Bedroom — ~127 sq.ft (12 m²); 2 Bedroom — ~385 sq.ft (36 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Payment plan

The purchase price is split into these stages.

120%Down payment
250%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

100%
  • StatusReady
  • Construction started01.08.2024
  • HandoverReady To Move in
  • Status date14.10.2025
  • Escrow bankADIB
  • DLD project number3165

Data from the Dubai Land Department project registry (updated 20.11.2026 05:55).

DLD advertising permit

DLD advertising permit

Listed by Continental Club Property under a Dubai Land Department (Trakheesi) permit. Scan the QR to verify.

Inspection history 4
025507510002.07.202414.10.2025
Actual, per inspections
Construction progress 120
14.10.2025 100.00%
Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 1 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 2 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 3 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 4 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 5 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 6 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 7 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 8 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 9 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 10 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 11 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 12 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 13 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 14 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 15 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 16 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 17 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 18 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 19 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 20 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 21 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 22 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 23 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 24 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 25 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 26 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 27 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 28 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 29 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 30 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 31 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 32 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 33 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 34 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 35 of 36Binghatti Aurora, JVC District 12 construction progress — 14 October 2025, 100.00% complete, photo 36 of 36

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Binghatti Aurora

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

333deals since 2024
15 795AED per m², median
23%resale, the rest bought from the developer
+8%over the past year
7.3%gross rental yield

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio36700 00019 444107
1 bedroom731 000 00013 699202
2 bedrooms1251 650 00013 20023

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — +15% on the price per square metre in this building. The district moved +10% over the same period, so the building outpaced the market.

13 7192024——
18 51120251 3957.5%
15 8272026*1 1647.4%

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
05.11.20261 BR94.0950 000
30.10.20261 BR85.01 100 000
30.10.2026Studio35.9692 249
26.10.20261 BR100.61 080 000
26.10.2026Studio36.0600 000
15.10.20261 BR73.0970 000
13.10.20261 BR93.4980 000
08.10.20261 BR93.0980 000
01.10.20261 BR72.91 040 000
24.09.20261 BR72.81 150 000
02.09.2026Studio35.3675 000
12.08.20261 BR134.61 220 000
10.08.20261 BR72.61 025 000
05.08.20262 BR126.81 730 000
22.07.2026Studio36.0650 000
21.07.20261 BR72.81 050 000
07.07.20261 BR72.41 050 000
06.07.20261 BR93.41 130 000
23.06.20261 BR72.61 160 000
10.06.20261 BR72.71 070 000
02.06.2026Studio35.6690 000
22.05.2026Studio35.1675 000
22.05.20261 BR190.61 050 000
18.05.20261 BR93.11 027 512
06.05.20261 BR93.41 029 848
06.05.20261 BR93.21 027 863
06.05.20261 BR93.01 026 000
06.05.20261 BR94.3977 248
23.04.2026Studio36.0735 000
22.04.2026Studio35.61 000 000
13.04.2026Studio35.3710 000
10.04.20261 BR72.61 200 000
02.04.20261 BR67.81 399 998
31.03.20261 BR73.01 538 461
26.03.20261 BR85.21 180 000
24.03.20262 BR126.82 150 000
23.03.20261 BR73.01 474 998
17.03.2026Studio38.5650 000
12.03.2026Studio36.1805 000
23.02.2026Studio35.6740 000
10.02.20261 BR72.71 150 000
06.02.20261 BR72.91 487 498
03.02.2026Studio35.3937 498
03.02.20261 BR72.81 487 498
02.02.20261 BR73.01 080 000
30.01.20261 BR72.81 499 998
23.01.20261 BR73.01 538 461
22.01.20261 BR93.21 150 000
20.01.2026Studio36.0700 000
19.01.20261 BR70.21 060 000
Rentals — 20
DateTypeSize, m²Rent, AED/yr
19.11.20261bed room+Hall85.090 000
14.11.2026Studio35.348 000
05.11.20261bed room+Hall72.9100 000
05.11.20261bed room+Hall72.6110 400
04.11.20261bed room+Hall72.798 000
03.11.20262 bed rooms+hall92.5108 000
01.11.2026Studio35.355 000
01.11.20261bed room+Hall72.880 000
27.10.2026Studio36.147 000
24.10.2026Studio35.352 000
15.10.20261bed room+Hall72.890 000
01.10.2026Studio35.345 000
28.09.2026Studio35.350 000
26.09.2026Studio35.649 200
20.09.2026Studio35.150 000
15.09.2026Studio35.750 000
15.09.20261bed room+Hall107.890 000
12.09.2026Studio36.050 000
12.09.2026Studio37.152 000
08.09.2026Studio36.148 000

Dubai Land Department transaction registry, updated 20.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 700 000 AED is 2 956 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Landscaped Parks
  • Gymnasium
  • Restaurants
  • Indoor Swimming Pool
  • CCTV Security
  • Barbecue Area
  • Children's Play Area

What is nearby

  • Al Maktoum International Airport30 мин
  • Burj Al Arab20 мин
  • Circle Mall5 мин
  • Downtown Dubai20 мин
  • Dubai Butterfly Garden10 мин
  • Dubai International Airport28 мин
  • Dubai Mall20 мин
  • Dubai Marina20 мин
  • Mall of the Emirates15 мин

Places nearby

🌳 Khansoor Park · 0.3 km🌳 Eisbej Park · 0.3 km🌳 Markh Park · 0.3 km🌳 Halool Park · 0.4 km🌳 Henna Park · 0.5 km
Binghatti Aurora

Your broker for this project

Olesia Kotova

Olesia Kotova

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Binghatti Aurora: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Binghatti Aurora is a completed residential apartment development by Binghatti Developers in JVC District 12, within Jumeirah Village Circle, Dubai. The single-building project contains 275 residences and is ready to move in. Its construction status is Finished, with completion recorded at 100.00%.

The building and architectural approach

Binghatti Aurora is arranged as a basement, ground floor, five residential floors and a roof. It is a single-building residential development on a plot of 76,983.41 square feet, equivalent to 7,152 square metres. The building uses Binghatti’s signature colour tone and contemporary design language. Its façade incorporates distinctive balcony forms that contribute to the building’s appearance and provide shading to the interiors. The project is located in JVC District 12, a residential subdistrict within the wider Jumeirah Village Circle community. Construction began on 1 August 2024, and the recorded completion date is 31 December 2025.

Apartment collection

The development comprises 275 residential units across three apartment types: studios, one-bedroom apartments and two-bedroom apartments. There are 92 studios, 163 one-bedroom apartments and 20 two-bedroom apartments. The residences are distributed across the project’s five residential floors. Binghatti Aurora is an apartment-only residential project rather than a mixed collection of villas or townhouses. The range of studios, one-bedroom and two-bedroom homes gives buyers a choice of layouts within one completed building in Jumeirah Village Circle. The project’s starting price is AED 700,000.

Leisure, fitness and resident facilities

Binghatti Aurora includes an adult swimming pool with Jacuzzi, a dedicated children’s pool area and an indoor gym. Outdoor facilities include an outdoor fitness area, yoga and aerobics space, jogging paths and sunken seating. A leisure deck incorporates gym and swimming-pool facilities. The project also includes 24/7 security and CCTV. Additional shared facilities listed for the building include a barbecue area, café and restaurants. The amenity programme combines pool, fitness and social spaces within the residential development. These facilities sit alongside the project’s 275 apartments in the completed building.

JVC District 12 and nearby destinations

Binghatti Aurora is in JVC District 12, within Jumeirah Village Circle. Eisbej Park, Khansoor Park and Markh Park are each 0.3 km from the project. Cinepolis at Circle Mall is 1.0 km away, while The Els Golf Club is 2.3 km away and Dubai Miracle Garden is 2.6 km away. Reel Cinemas at The Springs Souk is 2.9 km from the building. The location map places Circle Mall at five minutes, Dubai Butterfly Garden at 10 minutes and Mall of the Emirates at 15 minutes. Dubai Marina, Downtown Dubai, Dubai Mall and Burj Al Arab are each listed at 20 minutes. Dubai International Airport is listed at 28 minutes and Al Maktoum International Airport at 30 minutes.

Price, project status and payment enquiries

Apartments at Binghatti Aurora start from AED 700,000. The project is ready to move in and has a Finished construction status with a recorded completion ratio of 100.00%. It contains 275 units in one building. Binghatti Aurora is registered under project number 3165. Payment-plan enquiries are handled by calling us. The project is an active residential development comprising a basement, ground level, five residential floors and a roof.

Binghatti Developers

Binghatti Aurora is developed by Binghatti Developers. Binghatti was founded in 2008 by Hussein Binghatti and his sons. The Dubai-based Emirati property brand has a portfolio of more than 60 projects valued at more than AED 35 billion. It delivered 25,000 units before 2024. Binghatti’s portfolio spans projects from accessible to ultra-high-end market segments and includes collaborations with luxury brands. Burj Binghatti Jacob & Co Residences and Mercedes-Benz Places are included in its portfolio. Binghatti Aurora carries the developer’s established design language through its façade, colour treatment and balcony design.

Service charge, 2026

Approved rate17.65 AED▲ +7.6% per sq ft per year · 190 AED/m²
General / reserve fund16.39 / 1.26AED/sq ft
vs Jumeirah Village Circle median▲ +7.4%median 16.44 · rank 124/192
A 1,000 sq ft unit≈ 17,650 AEDper year · ≈ $4,806

Managed by Stealth Owner Association Management Services · budget 1 Jan 2026 — 31 Dec 2026

History, budget breakdown and nearby buildings →

RERA-approved budget from the DLD service charge index (Mollak) for “Binghatti Aurora”. Total is the general and reserve funds; additional charges are separate.

Frequent questions

Who is the developer of Binghatti Aurora?
Binghatti Aurora is developed by Binghatti Developers.
Where is Binghatti Aurora located?
Binghatti Aurora is located in JVC District 12, within Jumeirah Village Circle, Dubai.
What apartments are available at Binghatti Aurora?
The project includes studios, one-bedroom apartments and two-bedroom apartments. There are 92 studios, 163 one-bedroom apartments and 20 two-bedroom apartments.
What is the starting price at Binghatti Aurora?
Prices start from AED 700,000.
Is Binghatti Aurora complete?
Yes. Binghatti Aurora has a Finished status and a recorded completion ratio of 100.00%.
When can buyers move into Binghatti Aurora?
Binghatti Aurora is ready to move in.
What is the payment plan for Binghatti Aurora?
Payment-plan enquiries are available by calling us.
What amenities does Binghatti Aurora offer?
Facilities include an adult pool with Jacuzzi, children’s pool, indoor gym, outdoor fitness area, yoga and aerobics space, jogging paths, sunken seating, 24/7 security and CCTV.
What is close to Binghatti Aurora?
Eisbej Park, Khansoor Park and Markh Park are each 0.3 km away. Cinepolis at Circle Mall is 1.0 km from the project.
How can I buy an apartment in Binghatti Aurora?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Binghatti Aurora between 19 Jan 2026 and 5 Nov 2026: median 15 811 AED/m² (1 469 AED/sq ft); half of the deals fell between 12 493 and 19 939 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 695 0001419 41635.8
1 BRAED 1 036 0003414 18773
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

JVC District 12: new projects and prices

16 projects · prices from DLD and developers

  1. Q Gardens Lofts 2 Q Gardens Lofts 2 JVC District 12 · Studio, 1–2 BR from AED 485,000
  2. Sapphire 32 Sapphire 32 JVC District 12 · Studio, 1–3 BR from AED 500,000
  3. Avant Garde 2 Residences Avant Garde 2 Residences JVC District 12 · Studio, 1–2 BR from AED 670,000

13 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Binghatti Aurora worth?

DLD has recorded 333 sales in this building since 2024, 78 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Binghatti Developers

All 82 projects by Binghatti Developers →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Binghatti Aurora — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-19, https://continentalclub.ae/project/binghatti-aurora-jvc-district-12/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.