by KBW Development in JVC District 12
Le Parc Homes 2 is a residential project by KBW Development in JVC District 12, Dubai, with prices from AED 4 000 000, ready to move in.
Residence types
- 4 Bedroom townhouses
Floor plans
Construction progress
- StatusReady
- Construction started2023-02-01
- HandoverReady To Move in
- Status date06.03.2025
- Escrow bankEmirates NBD
- Scale13 villas
- DLD project number2682
Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: KBW Development · District: JVC District 12
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 16.04.2026 | 4 BR | 192.0 | 4 600 000 |
| 16.04.2026 | 4 BR | 192.0 | 2 275 000 |
| 02.03.2026 | 4 BR | 192.6 | 3 240 000 |
| 02.03.2026 | 4 BR | 96.3 | 2 049 893 |
| 15.01.2026 | 4 BR | 192.3 | 3 340 000 |
| 15.01.2026 | 4 BR | 192.3 | 4 400 000 |
| 04.06.2025 | 4 BR | 192.0 | 3 640 000 |
| 04.06.2025 | 4 BR | 192.3 | 3 640 000 |
| 02.05.2025 | 4 BR | 285.8 | 3 194 235 |
| 30.04.2025 | 4 BR | 285.8 | 3 194 235 |
| 10.04.2025 | 4 BR | 192.6 | 4 050 000 |
| 24.03.2025 | 4 BR | 222.8 | 4 600 000 |
| 03.02.2025 | 4 BR | 194.0 | 4 200 000 |
| 16.12.2024 | 4 BR | 191.7 | 3 900 000 |
| 14.08.2024 | 4 BR | 195.0 | 3 900 000 |
| 25.07.2024 | 4 BR | 194.6 | 3 800 000 |
| 25.07.2024 | 4 BR | 327.4 | 5 000 000 |
| 25.07.2024 | 4 BR | 194.0 | 3 750 000 |
| 25.07.2024 | 4 BR | 194.3 | 3 991 560 |
| 19.03.2024 | 4 BR | 222.8 | 3 836 820 |
Rentals — 2
| Date | Type | Size, m² | Rent, AED/yr |
|---|---|---|---|
| 4 bed rooms+hall | 194.0 | 264 000 | |
| 4 bed rooms+hall | 194.0 | 258 000 |
Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →
Amenities
- Roof-top terrace
- Maid's room
- Family room
- Laundry area
- Multiple storage spaces
- Private pool
- Home automation system
- CCTV
- 2-car parking
What is nearby
- Downtown Dubai20 мин
- Dubai International Airport25 мин
- Dubai Marina15 мин
Places nearby
About the project
Le Parc Homes 2 is a finished townhouse development in JVC District 12, within Jumeirah Village Circle, Dubai. KBW Development developed 13 three-level, four-bedroom townhouses with private pools, rooftop terraces and two-car parking. The project is ready to move in and was recorded as 100% complete following an inspection dated 6 March 2025.
The project and its design
Le Parc Homes 2 comprises 13 townhouses arranged over three levels. Each residence is configured with four bedrooms and a maid’s room, with a rooftop terrace extending the private living space. The homes have oversized open-plan layouts, high ceilings and floor-to-ceiling windows. A second family living room is positioned on the second floor, adding a separate area for family use within the house. Each townhouse includes a private pool, garden and parking. The architectural and interior approach uses a contemporary, minimalist treatment, with natural stone and granite countertops specified for the kitchens. The project’s location is JVC District 12, a residential subdistrict of Jumeirah Village Circle.
Townhouse configuration and interior spaces
The residences are four-bedroom townhouses with a reported size of 3,500 square feet for each house. Bedrooms have built-in closets, while the master bedroom includes a walk-in closet and an en-suite bathroom. The plan also incorporates a maid’s room, a family room, a laundry area and multiple storage spaces. The rooftop terrace forms an additional private outdoor area, and every home has its own pool and garden. Two-car parking is provided with each residence. These are houses rather than apartments, with living accommodation distributed through the three-level layout and a second family living room on the second floor.
Materials, kitchens and home systems
Kitchen specifications include European-style cabinets, granite countertops and top-of-the-line appliances. The interior materials schedule includes Italian-style porcelain tiles and stone, alongside German sanitary ware. Bathrooms use fixtures and fittings from Kohler. Floor-to-ceiling windows and high ceilings are incorporated within the living spaces, while built-in wardrobes serve all bedrooms. The homes are ready for a home automation system and include CCTV. The combination of private pool, rooftop terrace, garden, storage areas, laundry area and two-car parking is part of the individual townhouse specification rather than a shared apartment-building amenity package.
Private amenities and practical features
Each townhouse at Le Parc Homes 2 has a private pool and a rooftop terrace. Internal facilities include a maid’s room, a second family living room, laundry area and multiple storage spaces. The houses also provide two parking spaces and a private garden. CCTV is included, and the homes are ready for home automation. The project details identify floor-to-ceiling windows, high ceilings, built-in closets, European-style kitchen cabinets, appliances, German sanitary ware and Italian-style porcelain tiles and stone. These features apply to the three-level four-bedroom townhouse format offered at the development.
JVC District 12 location
Le Parc Homes 2 is located in JVC District 12, part of Jumeirah Village Circle. Eisbej Park and Khansoor Park are each 0.3 km from the development, while Markh Park is 0.4 km away. Cinepolis at Circle Mall is 1.1 km away. Dubai Miracle Garden is 2.6 km from the project, and The Els Golf Club is 2.3 km away. Other nearby destinations include Reel Cinemas at The Springs Souk at 2.9 km, Jumeirah Golf Estates Golf Course at 4.4 km and Montgomerie Golf Course at 4.5 km. The Storm Coaster is 5.5 km away, while Ski Dubai and Vox Cinemas at Mall of the Emirates are each 7.0 km away.
Price, completion and purchase terms
Prices for Le Parc Homes 2 start from AED 4,000,000. The development is ready to move in. It is recorded as finished, with a completion ratio of 100.00% on an inspection dated 6 March 2025. Construction started on 1 February 2023. The project comprises 13 townhouses and has a total project area of 2,819.45 square metres. Payment-plan information is available on request. Buyers considering a purchase can assess the available four-bedroom townhouse format, the individual private pool and garden, the rooftop terrace, and the completed status of the development.
KBW Development
Le Parc Homes 2 is developed by KBW Development. KBW Development is a family-owned group of development companies with a presence in Dubai, Kuwait, Jordan and Spain. Khaled Esbaitah has more than 30 years of real-estate industry experience and has overseen developments including The Fairmont Palm Jumeirah and The 8 Palm. Bader Esbaitah is the managing partner of KBW Development and holds a master’s degree in Interior and Spatial Design from the Royal College of Art in London. His work at the company focuses on project interiors and procurement.
Registered transactions in Le Parc Homes 2
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
What buyers actually paid
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 4 bedrooms | 194 | 3 836 820 | 19 777 | 24 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.







































