Developer: Obj1 Real Estate Development · Jumeirah Village Triangle
Vivid Tower is a residential project by Object 1 Development in Jumeirah Village Triangle, Dubai, with handover 30.11.2026, construction 12.3% complete per the DLD registry.
Data from the Dubai Land Department project registry (updated 14.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Object 1 Development · District: Jumeirah Village Triangle
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 25.06.2026 | 1 BR | 87.0 | 1 159 813 |
| 13.05.2026 | Studio | 45.5 | 705 647 |
| 23.04.2026 | Studio | 42.9 | 781 909 |
| 23.02.2026 | 2 BR | 122.1 | 1 867 331 |
| 23.02.2026 | Studio | 42.8 | 688 533 |
| 18.02.2026 | 1 BR | 84.5 | 1 200 303 |
| 18.02.2026 | 1 BR | 84.5 | 1 201 439 |
| 09.02.2026 | Studio | 50.8 | 766 235 |
| 03.02.2026 | Studio | 42.7 | 725 920 |
| 12.01.2026 | Studio | 43.0 | 697 855 |
| 05.01.2026 | Studio | 45.5 | 699 728 |
| 18.12.2025 | Studio | 45.5 | 809 460 |
| 17.12.2025 | Studio | 50.8 | 844 578 |
| 16.12.2025 | 2 BR | 123.4 | 1 568 233 |
| 10.12.2025 | Studio | 42.8 | 700 729 |
| 08.12.2025 | Studio | 42.8 | 700 626 |
| 08.12.2025 | 2 BR | 122.3 | 1 837 972 |
| 21.11.2025 | 1 BR | 84.5 | 1 286 659 |
| 12.11.2025 | 2 BR | 122.1 | 1 773 964 |
| 12.11.2025 | 2 BR | 122.1 | 1 706 145 |
Dubai Land Department transaction registry, updated 2026-08-13. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +2% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 43 | 750 161 | 17 446 | 55 |
| 1 bedroom | 85 | 1 225 544 | 14 418 | 22 |
| 2 bedrooms | 123 | 1 700 000 | 13 821 | 27 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Vivid Tower is a single-building residential development by Obj1 Real Estate Development in Jumeirah Village Triangle, Dubai. The building is planned with an underground water tank, ground floor, four parking levels, 16 residential floors and a roof level. The project is active, with a reported completion ratio of 7.53% and scheduled completion on 30 November 2026.
Vivid Tower comprises 147 units within one residential building in Jumeirah Village Triangle. The project began on 20 January 2025 and has a scheduled completion date of 30 November 2026. Its reported total project area is 11,052.94 square metres. Obj1 Real Estate Development is the developer of Vivid Tower. The development’s Jumeirah Village Triangle setting places it within a primarily residential part of Dubai characterised by villas, townhouses and an increasing number of apartment buildings at the outer edges of the community. Parks and landscaped public spaces form part of the wider community layout.
The planned building configuration is an underground water tank, ground floor, four parking floors, 16 residential floors and a roof level. Vivid Tower is designed as a residential building with a concrete structure and blockwork, followed by internal and external finishes. The project consists of one building and 147 units. This vertical arrangement places the residential accommodation above the ground and parking levels, while the roof forms the uppermost level of the scheme. The development is located in the area identified as Al Barsha South Fifth, within the Jumeirah Village Triangle location.
Jumeirah Village Triangle is a residential community in southern-central Dubai, adjoining Sheikh Zayed Road and Al Khail Road. The neighbourhood is arranged on a triangular parcel of land and is known for its geometric street layout. Its existing housing stock is dominated by low-rise villas and townhouses, many set on garden plots, while apartment development is concentrated on the community’s outer edges. Parks and open green areas are integrated into the area. Residents commonly use retail and services in neighbouring communities including Motor City, The Springs and The Meadows. Arcadia British School and Sunmarke School are among the nearby schools.
Jumeirah Village Triangle is oriented around car travel, with Sheikh Zayed Road and Al Khail Road providing routes to other parts of Dubai. Dubai Marina is listed at 6.2 km from the community, while JBR Beach is listed at 6.7 km and Palm Jumeirah at 8.9 km. Mall of the Emirates is listed at 8.0 km, Expo City Dubai at 10.5 km and Global Village at 12.1 km. Downtown Dubai and Burj Khalifa are listed at 18.8 km, with Dubai Mall at 19.0 km. The nearest Red Line Metro reference point, R73, is listed at 4,198 metres from the community.
Vivid Tower is active. Its reported completion ratio is 7.53%, based on an inspection dated 29 April 2026. The project start date is 20 January 2025 and the scheduled completion date is 30 November 2026. The development contains one building with 147 units and a total area of 11,052.94 square metres. The construction scope identifies a concrete structure and blockwork, with internal and external finishes included in the building design. The planned configuration extends from an underground water-tank level through the ground floor, four parking floors and 16 residential floors to the roof level.
Obj1 Real Estate Development is the developer of Vivid Tower. The company is named as the developer for the 147-unit residential project in Jumeirah Village Triangle. Vivid Tower is scheduled to be delivered on 30 November 2026, following a project start date of 20 January 2025. The scheme is planned as one residential building with an underground water tank, ground floor, four parking levels, 16 residential floors and a roof. Its reported total project area is 11,052.94 square metres, and the reported construction completion ratio is 7.53%.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.