Developer: Binghatti Developers · Jumeirah Village Triangle
Binghatti Flare 02 is a residential project by Binghatti Developers in Jumeirah Village Triangle, Dubai, with handover 15.06.2027, construction 17.8% complete per the DLD registry.
Data from the Dubai Land Department project registry (updated 14.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Binghatti Developers · District: Jumeirah Village Triangle
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 12.08.2026 | 1 BR | 76.3 | 1 396 999 |
| 27.07.2026 | Studio | 45.7 | 855 999 |
| 20.07.2026 | 1 BR | 80.0 | 1 272 759 |
| 14.07.2026 | 1 BR | 75.5 | 1 342 479 |
| 30.06.2026 | 3 BR | 230.5 | 3 049 999 |
| 25.06.2026 | 1 BR | 75.3 | 1 368 999 |
| 22.06.2026 | Studio | 35.7 | 855 999 |
| 18.06.2026 | 1 BR | 34.7 | 634 229 |
| 16.06.2026 | Studio | 41.3 | 861 999 |
| 11.06.2026 | 1 BR | 76.2 | 1 405 999 |
| 10.06.2026 | 4 BR | 364.0 | 4 499 999 |
| 04.06.2026 | Studio | 35.7 | 855 999 |
| 21.05.2026 | Studio | 40.2 | 952 999 |
| 08.05.2026 | 1 BR | 80.0 | 1 358 999 |
| 29.04.2026 | 1 BR | 69.3 | 1 305 999 |
| 22.04.2026 | 1 BR | 89.7 | 1 396 999 |
| 22.04.2026 | 3 BR | 141.6 | 2 749 999 |
| 22.04.2026 | 1 BR | 89.7 | 1 385 999 |
| 20.04.2026 | Studio | 35.6 | 855 999 |
| 20.04.2026 | 1 BR | 69.3 | 1 305 999 |
Dubai Land Department transaction registry, updated 2026-08-13. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 38 | 861 999 | 22 684 | 191 |
| 1 bedroom | 76 | 1 383 999 | 18 211 | 301 |
| 2 bedrooms | 143 | 2 299 999 | 16 084 | 51 |
| 3 bedrooms | 206 | 2 999 999 | 14 563 | 8 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Binghatti Flare 02 is a residential development by Binghatti Developers in Jumeirah Village Triangle, Dubai. The project is active, with construction recorded at 17.83% completion on 19 June 2026 and a scheduled completion date of 15 June 2027.
Binghatti Flare 02 is planned as one residential building with two basement levels, a ground floor, four parking levels, 34 residential floors, two mechanical levels and a roof. Its project number is 4008. The development combines a substantial vertical residential component with dedicated basement and podium parking levels. The planned configuration places the 34 residential floors above the ground-floor and parking structure, while the two mechanical levels and roof form the upper part of the building. The project is located in Jumeirah Village Triangle, a residential community in southern-central Dubai.
Construction for Binghatti Flare 02 started on 15 July 2025. The project is active and was recorded at 17.83% completion at its inspection on 19 June 2026. The scheduled completion date is 15 June 2027. These dates place the development within an ongoing construction programme, from its July 2025 start through to the June 2027 completion schedule. The project is a single-building residential development, with its construction progress measured across the full building configuration rather than across multiple buildings.
Binghatti Flare 02 is located in Jumeirah Village Triangle, also known as JVT. The community occupies a triangular parcel adjoining Sheikh Zayed Road and Al Khail Road. JVT is characterised by a geometric street layout, low-rise villas and townhouses, garden plots, and landscaped public spaces. Apartment development is concentrated on the outer edges of the Triangle, where completed, under-construction and planned mid-rise and high-rise schemes sit alongside the lower-density residential fabric. Parks and open green areas are integrated into the community layout.
Jumeirah Village Triangle is positioned close to Sheikh Zayed Road and Al Khail Road, with road routes towards central and coastal parts of Dubai. Dubai Marina is listed at 6.2 km from the community, while JBR Beach is listed at 6.7 km and Palm Jumeirah at 8.9 km. Mall of the Emirates is listed at 8.0 km, Expo City Dubai at 10.5 km and Global Village at 12.1 km. Downtown Dubai is listed at 18.8 km, Dubai Mall at 19.0 km and DIFC at 20.6 km. Travel times vary with traffic conditions and the route used.
JVT includes parks and landscaped public spaces within its residential layout. Arcadia British School and Sunmarke School are nearby schools. The community’s housing stock is primarily made up of villas and townhouses, while apartment blocks are located on its periphery. Residents use retail and service amenities in neighbouring communities including Motor City, The Springs and The Meadows. JVT’s position near Sheikh Zayed Road also provides road access towards shopping, dining and business destinations in Dubai Marina, Palm Jumeirah and other districts.
The nearest Dubai Metro reference point for Jumeirah Village Triangle is R73 on the Red Line, listed at 4,198 metres from the community. JVT is designed primarily around car travel, with Sheikh Zayed Road and Al Khail Road forming its principal road connections. The community’s location between these two corridors supports driving routes to Dubai Marina, JBR Beach, Palm Jumeirah, Business Bay, Downtown Dubai and the airport areas. Transport times depend on traffic conditions and the route selected.
Binghatti Developers is the developer of Binghatti Flare 02. The company also has Binghatti Luxuria among the construction activity identified in Jumeirah Village Triangle. Binghatti Flare 02 is a separate residential project in the same community, planned as one building with 34 residential floors above its ground-floor and parking structure. Its construction programme began on 15 July 2025, and its scheduled completion date is 15 June 2027.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.