Developer: Skyland Degrees · JVT District 2

Ashwood Residences

Ashwood Residences is a residential project by Skyland Degrees in JVT District 2, Dubai, with prices from AED 899 000, handover Q4 2027, construction 14.6% complete per the DLD registry, 151 apartments (+2 non-residential units), 31 sold to first buyers per the DLD register (as of 13 Nov 2026).

Price fromAED 899 000Developer supplied
Unit typesStudio · 1–3 BR365–2 758 ft²DLD registry
HandoverQ4 2027Developer supplied
Construction14.6%DLD registry · checked 03.08.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio42365–381
1 Bedroom82633–853
2 Bedroom251 146–1 591
3 Bedroom22 758
Other units21 613–2 289

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~83 sq.ft (7.7 m²); 1 Bedroom — ~160 sq.ft (15 m²); 2 Bedroom — ~388 sq.ft (36 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 13 Nov 2026

≈120 of 151 apartments availableestimate

Sold to first buyers 31 (21%)Available ≈120

TypeTotalSoldAvailable
Studios422319
1 bedroom82874
2 bedrooms25025
3 bedrooms202
Total15131120

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded; this is an estimate. Non-residential units (2) are not included.

Sales pace · DLD data as of 10 Nov 2026

Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.

Compare with similar projects

Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.

Compare with 3 closest Ask a broker on WhatsApp

Handover date & construction progress

14.57%
  • StatusActive
  • Construction started01.04.2025
  • HandoverQ4 2027
  • Status date03.08.2026
  • Progress between DLD inspections+6.95% (31.03.2026 → 03.08.2026)
  • Escrow bankBank of Baroda
  • DLD project number3464

Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).

DLD advertising permit

DLD advertising permit

Listed by Continental Club Property under a Dubai Land Department (Trakheesi) permit. Scan the QR to verify.

Inspection history 4
025507510016.01.202503.08.2026
Actual, per inspections

Pace: 1.04% per month. At this rate 100% falls on 11.06.2033.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 85
03.08.2026 14.57%
Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 1 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 2 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 3 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 4 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 5 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 6 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 7 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 8 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 9 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 10 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 11 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 12 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 13 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 14 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 15 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 16 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 17 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 18 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 19 of 20Ashwood Residences, JVT District 2 construction progress — 3 August 2026, 14.57% complete, photo 20 of 20
31.03.2026 7.62%
Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 1 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 2 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 3 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 4 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 5 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 6 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 7 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 8 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 9 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 10 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 11 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 12 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 13 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 14 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 15 of 16Ashwood Residences, JVT District 2 construction progress — 31 March 2026, 7.62% complete, photo 16 of 16

49 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Ashwood Residences

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

33DLD registrations incl. resales, since 2025
20 646AED per m², median
6%resale, the rest bought from the developer
0%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved -1% over the same period, so the building matched it.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio34722 30821 24423
1 bedroom731 374 80818 8338

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
05.10.2026Studio34.3694 174
19.05.2026Studio34.3741 874
19.02.2026Studio35.3745 544
03.02.20261 BR74.81 374 808
03.02.2026Studio33.9708 409
03.02.2026Studio34.3714 624
03.02.20261 BR61.81 195 197
30.12.20251 BR61.81 145 077
11.11.2025Studio33.9707 603
30.10.20251 BR72.51 453 317
30.10.2025Studio35.4746 679
29.10.2025Studio33.9720 415
29.10.2025Studio34.3722 308
15.10.2025Studio33.9740 939
13.10.2025Studio34.3716 931
13.10.2025Studio33.9746 496
24.09.2025Studio34.3674 501
18.09.2025Studio35.3783 442
17.09.2025Studio33.9645 742
10.09.20251 BR61.81 173 544
10.09.2025Studio33.9695 576
10.09.2025Studio34.3701 677
02.09.2025Studio35.3743 059
02.09.20251 BR60.01 155 231
29.08.20251 BR74.81 423 266
29.08.2025Studio33.9735 424
18.08.20251 BR74.81 433 940
07.08.2025Studio35.3729 017
07.08.2025Studio35.3745 544
14.07.2025Studio35.3779 779
14.07.2025Studio34.3664 821
21.12.20231 626.820 250 000
28.12.20151 626.818 200 000

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 899 000 AED is 3 796 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Temperature-controlled swimming pool
  • Sunbeds and deck
  • Padel court
  • Café/lounge
  • Gym
  • Steam room
  • Fitting room
  • Indoor and outdoor kids’ play area
  • Event lawns
  • Zen garden
  • Barbecue area
  • Luggage room
  • Dedicated concierge
  • EV charging stations
Ashwood Residences

Your broker for this project

Olesia Kotova

Olesia Kotova

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Ashwood Residences: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Ashwood Residences is a 151-apartment residential development by Skyland Degrees in JVT District 2, within Jumeirah Village Triangle. The project comprises one building configured as U/G + G + 4P + 17 + R and offers studio, one-bedroom, two-bedroom and three-bedroom apartments. Construction is active, with completion recorded at 14.57% and a scheduled project completion date of 31 March 2027.

The project and building configuration

Ashwood Residences is planned as a single residential building with a configuration of U/G + G + 4P + 17 + R. Its 151 apartments (+2 non-residential units) are distributed across studio, one-bedroom, two-bedroom and three-bedroom apartment categories. The interiors are described as fully furnished and include German appliances and designer finishes. Other specified in-home and building features include home automation, smart corridor lighting, 24/7 hot water, a pod-enabled building system and individual letterboxes. The project also lists 11-foot ceilings, EV charging stations, golf course views and Emirates Hills views. A double-height lobby forms part of the building’s arrival space, while a dedicated concierge and luggage room are included among the resident services.

Apartment selection and interiors

The available apartment selection at Ashwood Residences includes studios as well as one-bedroom, two-bedroom and three-bedroom residences. The studio layout includes a living room, bedroom and bathroom. One-bedroom apartments include a living room, kitchen, bedroom and bathroom. Two-bedroom layouts include a living room, kitchen area, master bedroom, secondary bedroom and bathroom. The three-bedroom plan incorporates a living room, kitchen, two master bedrooms, a study room, walk-in closet, bathrooms, powder room and maid’s room. Across the residences, the project specifies fully furnished interiors, German appliances, designer finishes and home automation. The listed building features also include 11-foot ceilings and 24/7 hot water.

Amenities and resident facilities

The amenity programme at Ashwood Residences includes a temperature-controlled swimming pool with sunbeds and a deck. Fitness and wellness facilities comprise a gym, steam room, padel court, zen garden for yoga and meditation, and a fitting room. Indoor and outdoor children’s play areas are included, alongside event lawns for gatherings and a barbecue area. Residents also have access to a café/lounge, dedicated concierge and luggage room. EV charging stations form part of the project’s listed facilities. The amenity collection combines recreation, fitness, children’s spaces and areas for events within the development.

JVT District 2 setting

Ashwood Residences is located in JVT District 2, a sub-district within Jumeirah Village Triangle. JVT District 2 Park is 0.4 km away, while JVT District 1 Park is 0.5 km away and JVT District 3 Park is 0.7 km away. Jumeirah Golf Estates Golf Course is 2.8 km from the development; Montgomerie Golf Course and The Els Golf Club are each 3.5 km away. Reel Cinemas at The Springs Souk is 3.6 km away, and Cinepolis at Circle Mall is 5.1 km away. Marina Walk is 6.2 km away and The Walk JBR is 6.4 km away. The location is also positioned within the broader Jumeirah Village Triangle community.

Travel connections and nearby destinations

Al Furjan Metro Station is listed at 9 minutes from Ashwood Residences. Jumeirah Park District is listed at 7 minutes, NMC Royal Hospital at 11 minutes and Dubai Marina Mall at 11 minutes. Palm Jumeirah is listed at 12 minutes, while Expo City and Dubai Miracle Garden are each listed at 15 minutes. Emirates Hills is listed at 16 minutes, and Jumeirah Village Circle and Jumeirah Golf Estate are each listed at 17 minutes. Mediclinic Parkview Hospital is listed at 18 minutes and Dubai Hills Mall at 20 minutes. Kings’ School Al Barsha is listed at 22 minutes, Al Maktoum International Airport at 22 minutes and Burj Khalifa at 26 minutes. Bluewaters Island is listed at 5 minutes.

Construction progress and completion date

Ashwood Residences is an active project. Construction commenced on 1 April 2025, and the recorded completion ratio is 14.57%. The scheduled project completion date is 31 March 2027. The development is registered as one building containing 151 apartments (+2 non-residential units). Its location is identified as JVT District 2, with the project also recorded under the Al Barsha South Fifth area designation. Buyers considering an off-plan residence can assess the project’s recorded construction stage alongside its scheduled completion date, apartment mix and specified amenity programme.

Skyland Degrees

Skyland Degrees is the developer of Ashwood Residences. The development is a residential project in JVT District 2 within Jumeirah Village Triangle, with a 151-apartment programme across studios and one-bedroom, two-bedroom and three-bedroom apartments. The project’s listed residential features include furnished interiors, German appliances, designer finishes, home automation, smart corridor lighting, 11-foot ceilings and EV charging stations. Its amenity offering includes a temperature-controlled swimming pool, padel court, gym, steam room, children’s play areas, event lawns, zen garden, barbecue area, café/lounge, concierge and luggage room. The project is active and has a scheduled completion date of 31 March 2027.

Frequent questions

Who is the developer of Ashwood Residences?
Ashwood Residences is developed by Skyland Degrees.
Where is Ashwood Residences located?
Ashwood Residences is located in JVT District 2, within Jumeirah Village Triangle.
What apartment types are available at Ashwood Residences?
The project includes studio, one-bedroom, two-bedroom and three-bedroom apartments.
How many homes are planned at Ashwood Residences?
Ashwood Residences comprises 151 apartments (+2 non-residential units) in one residential building.
What is the construction status of Ashwood Residences?
The project is active, with a recorded completion ratio of 14.57%.
When is the Ashwood Residences handover date?
Ashwood Residences handover (completion) is scheduled for Q4 2027 (developer data). The DLD register lists 31 March 2027. Construction progress was 14.57% at the DLD inspection of 3 August 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What amenities does Ashwood Residences include?
Amenities include a temperature-controlled swimming pool, padel court, gym, steam room, children’s play areas, event lawns, zen garden, barbecue area, café/lounge, concierge and EV charging stations.
What is near Ashwood Residences?
JVT District 2 Park is 0.4 km away. Al Furjan Metro Station is listed at 9 minutes, Dubai Marina Mall at 11 minutes and Palm Jumeirah at 12 minutes.
How many apartments are left in Ashwood Residences?
According to the Dubai Land Department (DLD) register, as of 13 Nov 2026 ≈120 of 151 apartments in Ashwood Residences have no registered sale; 31 have been sold to first buyers (21%). This is an estimate. This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Ashwood Residences?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 33 registered DLD sales in Ashwood Residences between 28 Dec 2015 and 5 Oct 2026: median 20 646 AED/m² (1 918 AED/sq ft); half of the deals fell between 19 244 and 21 114 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 722 0002321 04434.3
1 BRAED 1 283 000819 09567.2
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

JVT District 2: new projects and prices

9 projects · prices from DLD and developers

  1. Santorini Residences Santorini Residences JVT District 2 · Studio, 1–2 BR from AED 756,000
  2. Silviana Park Living Silviana Park Living JVT District 2 · Studio, 1–2 BR from AED 780,000
  3. Binghatti Flare Binghatti Flare JVT District 2 · Studio, 1–4 BR from AED 834,000

6 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Ashwood Residences worth?

31 of 151 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 33 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Ashwood Residences — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-13, https://continentalclub.ae/project/ashwood-residences-jvt-district-2/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.