by Park Residency Real Estate Development in International City 2
Park Residency is a residential project by Park Residency Real Estate Development in International City 2, Dubai, with handover 20.07.2029.
Construction progress
- Handover20.07.2029
- Status date09.01.2026
- DLD project number4322
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Park Residency Real Estate Development · District: International City 2
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 28.07.2026 | Studio | 36.0 | 564 964 |
| 17.07.2026 | Studio | 36.1 | 562 271 |
| 11.05.2026 | Studio | 36.0 | 509 175 |
| 11.05.2026 | Studio | 36.8 | 520 207 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Park Residency is a 98-unit residential project in International City 2, within Dubai’s Warsan 4 area. It is being developed by Park Residency Real Estate Development and is recorded as active, with a scheduled completion date of 20 July 2029.
Park Residency at a glance
Park Residency is registered as project number 4322 and has a total project area of 5,754.61. The development contains 98 units. It forms part of International City 2, a planned extension of Nakheel’s International City programme in Warsan 4. International City 2 combines the areas commonly known as Phase 2 and Phase 3 and is being developed through a mix of private residential projects, released land parcels and a central zone designated for taller buildings. The wider district is at an early stage of development, with mid-rise and low-rise residential neighbourhoods taking shape across the masterplan.
Construction status and scheduled completion
Park Residency is active. Its recorded completion ratio was 0.00% at the inspection dated 9 January 2026. The recorded construction start date is 20 July 2026, and the scheduled completion date is 20 July 2029. These dates place the project within the ongoing development cycle of International City 2, where infrastructure, residential construction and public-realm works are being delivered in stages. Buyers considering Park Residency can assess the project alongside the broader timing of development in the surrounding district.
International City 2 setting
International City 2 occupies land in Warsan 4. Emirates Road forms its western boundary, Academic City lies to the east, Dubai Silicon Oasis is to the south and International City 1 is to the north. A high-voltage power reservation corridor separates the district from International City 1 along the northern edge. The eastern boundary faces Academic City Road, with an easement reserved for a potential Dubai–Sharjah gas pipeline separating the road from the site. The district covers 731 hectares and has been planned with a central high-rise circle surrounded by low-rise and mid-rise residential neighbourhoods.
District plan and local development
The International City 2 masterplan is organised into five character zones: District Centre, The Ramblas, Residential Clusters, Open Space areas and International City Phase 3. District Centre is planned as a mixed-use zone with mid-rise offices, retail buildings and active street frontages. The Ramblas is planned as a pedestrianised spine with mixed-use buildings, ground-floor retail and residential or office space above. Residential Clusters are planned to include homes alongside shops, health services, offices and food-and-beverage outlets. Open Space areas are planned for district parks, community parks, playgrounds, plazas, schools and nurseries. International City Phase 3 is focused on mid-rise apartment buildings.
Road access and transport context
Roads and pavements are substantially in place across International City 2, with pavements installed along most streets. Public transport access is currently limited. The nearest Dubai Metro station is on the Red Line, 9,071 metres from the district. A Blue Line metro route and station are planned for the corridor between Phase 2 and Phase 3. Typical driving times from International City 2 are 21 minutes to Dubai Mall, 31 minutes to Palm Jumeirah, 29 minutes to Burj Al Arab, 34 minutes to The Walk at JBR, 15 minutes to Dubai International Airport and 38 minutes to Al Maktoum International Airport.
Park Residency Real Estate Development
Park Residency Real Estate Development is the developer of Park Residency. The company is responsible for a project comprising 98 units in International City 2. The development is scheduled to run from its recorded start date of 20 July 2026 to its scheduled completion date of 20 July 2029. Park Residency is one of the private developments within a district where land parcels have been made available to private developers, creating a varied built environment rather than a single uniform architectural style across International City 2.