Developer: Object 1 Development · JVC District 13

Ozone1 Residence

Ozone1 Residence is a residential project by Object 1 Development in JVC District 13, Dubai, with prices from AED 612 000, handover date being confirmed, construction 56.8% complete per the DLD registry, complex-wide (2 buildings): 269 apartments (+3 non-residential units), 241 sold to first buyers per the DLD register (as of 13 Nov 2026).

Price fromAED 612 000Our calculation
Unit typesStudio · 1 · 2 BR428–1 141 ft²DLD registry
HandoverDate being confirmedDLD registry
Construction56.8%DLD registry · checked 14.07.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio42428–429
1 Bedroom144747–831
2 Bedroom831 055–1 141
Other units3662–3 292

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Unit availability · DLD data as of 13 Nov 2026

≈28 of 269 apartments availablecomplex-wide (2 buildings)

Sold to first buyers 241 (90%)Available ≈28

TypeTotalSoldAvailable
Studios42366
1 bedroom14412618
2 bedrooms83794
Total26924128

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded. Figures are for the whole complex (several towers share one project number). Non-residential units (3) are not included.

Sales pace · DLD data as of 10 Nov 2026

Source: Dubai Land Department registrations (include off-plan resales). Ask us for current availability.

Payment plan 30% On Completion

The purchase price is split into these stages.

110%Down payment
260%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.

Compare with 3 closest Ask a broker on WhatsApp

Handover date & construction progress

56.83%
  • Construction started04.01.2024
  • Status date14.07.2026
  • Progress between DLD inspections+3.07% (07.05.2026 → 14.07.2026)
  • Escrow bankADIB
  • DLD project number2977

Data from the Dubai Land Department project registry (updated 17.11.2026 05:55).

Inspection history 7
025507510004.03.202414.07.2026
Actual, per inspections

Pace: 1.86% per month. At this rate 100% falls on 20.06.2028.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
14.07.2026 56.83%
Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 1 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 2 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 3 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 4 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 5 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 6 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 7 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 8 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 9 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 10 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 11 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 12 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 13 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 14 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 15 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 16 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 17 of 18Ozone1 Residence, JVC District 13 construction progress — 14 July 2026, 56.83% complete, photo 18 of 18
07.05.2026 53.76%
Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 1 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 2 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 3 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 4 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 5 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 6 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 7 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 8 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 9 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 10 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 11 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 12 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 13 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 14 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 15 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 16 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 17 of 18Ozone1 Residence, JVC District 13 construction progress — 7 May 2026, 53.76% complete, photo 18 of 18

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Ozone1 Residence

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

256DLD registrations incl. resales, since 2024
13 663AED per m², median
1%resale, the rest bought from the developer
-1%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building matched it.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio40644 08216 10239
1 bedroom70973 49913 907130
2 bedrooms1061 318 94412 44383

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — +8% on the price per square metre in this building. The district moved +10% over the same period, so the building tracked the market.

12 9862024——
14 1162025——
14 0092026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
03.11.20262 BR106.01 538 524
13.10.20262 BR111.81 990 959
06.10.2026Studio39.9501 346
06.10.20261 BR69.41 151 047
16.09.20262 BR142.71 853 422
14.09.20261 BR69.41 221 973
05.08.20262 BR106.01 566 743
20.07.20261 BR69.4918 040
20.07.2026Studio39.8610 989
20.07.2026Studio39.9612 992
20.07.20262 BR106.01 331 480
20.07.20261 BR71.8947 471
20.07.20261 BR69.4916 729
20.07.20261 BR77.2995 673
20.07.20262 BR98.41 234 413
07.07.20262 BR106.01 484 765
03.07.20262 BR106.01 701 965
03.07.20262 BR106.01 701 965
24.03.20261 BR69.41 007 394
02.02.20262 BR98.41 233 180
30.01.20261 BR69.41 028 597
20.01.20262 BR106.01 000 000
20.01.20262 BR98.41 306 602
12.01.20261 BR69.4695 928
22.12.2025Studio39.8592 555
16.12.20252 BR106.01 663 457
25.11.20251 BR82.51 190 578
20.11.20251 BR71.8981 309
20.11.20251 BR70.0973 042
12.11.20251 BR71.8904 363
05.11.20251 BR69.4979 627
27.10.20252 BR98.01 318 944
24.10.2025Studio39.9654 096
24.10.2025Studio39.8652 450
21.10.20251 BR69.4958 663
21.10.20252 BR106.01 513 233
08.10.2025Studio39.8644 082
08.10.20251 BR69.4960 175
02.10.20252 BR106.01 541 806
25.09.20251 BR69.4978 227
25.09.20252 BR98.41 233 180
25.08.2025Studio39.8640 106
25.08.20251 BR69.41 007 394
22.08.2025Studio39.8644 082
21.08.20251 BR71.81 010 000
12.08.20251 BR69.4991 234
06.08.20252 BR106.01 500 000
06.08.20252 BR98.01 303 427
06.08.20251 BR71.81 058 988
30.07.20251 BR82.61 140 606

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 612 000 AED is 2 584 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • 24/7 concierge service
  • Outdoor swimming pool
  • Kids pool
  • Sun loungers
  • Poolside cabanas
  • Sauna
  • Aroma room
  • Kids area
  • Climbing wall
  • Outdoor yoga area
  • Indoor yoga room
  • Clubhouse
  • Cinema
  • Outdoor squash court
  • Outdoor lounge area
  • BBQ area
  • Dining area
  • Kitchen
  • Gym
  • Outdoor gym
  • Outdoor kids play area
  • Green area
  • 4-story parking

Places nearby

🌳 Khansoor Park · 0.5 km🌳 Qesad Park · 0.6 km🌳 Eisbej Park · 0.6 km🌳 Henna Park · 0.6 km🧸 Ladybird Early Learning Centre JVC · 0.6 km
Ozone1 Residence

Your broker for this project

Eldar Musaev

Eldar Musaev

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Ozone1 Residence: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Ozone1 Residence is a 25-storey residential project in JVC District 13, within Jumeirah Village Circle. Object 1 Development is developing 269 apartments, comprising studios, one-bedroom and two-bedroom residences. The project is at the new-launch stage, with handover scheduled for Q2 2026.

The project and residences

Ozone1 Residence comprises 42 studios, 144 one-bedroom apartments and 83 two-bedroom apartments, for a total of 269 homes. The building is described as a 25-storey residential project and includes four levels of parking. Apartments are offered in furnished and semi-furnished configurations. The interiors include kitchen fittings and appliances, while the project’s apartment specifications identify Bertazzoni kitchen equipment, quartz countertops, Blum hardware, Ramon Soler mixers and Electrolux ionizers. Daikin air-conditioning and ventilation systems are specified for the residences, alongside air purification and ionization in each apartment. The residential concept centres on indoor air systems, with ventilation, air-conditioning and ionization incorporated into the apartment offering.

Apartment types

The available home types at Ozone1 Residence are studios, one-bedroom apartments and two-bedroom apartments. Studios account for 42 of the 269 residences, while one-bedroom homes form the largest category with 144 apartments. There are also 83 two-bedroom apartments. Furnished and semi-furnished apartment options are identified for the project. Kitchen specifications include Bertazzoni equipment, a quartz countertop and Blum hardware. Apartment air systems include Daikin ventilation and air-conditioning, with an Electrolux ionizer specified as part of the air-purification and ionization provision. These details apply to the project’s apartment offering across its studio, one-bedroom and two-bedroom home types.

Wellness, leisure and shared facilities

The amenity programme includes an outdoor swimming pool for adults and children, a separate kids’ pool, sun loungers and poolside cabanas. Wellness facilities include a sauna, aroma room, indoor yoga room, outdoor yoga area, gym and outdoor gym. The development also has a clubhouse with a cinema, an outdoor squash court and an outdoor lounge area. For families, there is a children’s area with a climbing wall as well as an outdoor kids’ play area. A BBQ area, kitchen and dining area are included within the shared spaces. The building provides a 24/7 concierge service and four-storey parking. A green area is also part of the amenity layout.

JVC District 13 location

Ozone1 Residence is located in District 13 of Jumeirah Village Circle. The project is connected through Al Khail Road, Hessa Street and Mohammed Bin Zayed Road. A park is listed at five minutes from the development, while Dubai Autodrome is listed at 10 minutes and Dubai Marina at 18 minutes. Mall of the Emirates, Palm Jumeirah, Burj Al Arab and Emirates Golf Club are each listed at 25 minutes. The project information also identifies an expected Blue Metro Line under the 20-Minute City programme. Within the building, two retail spaces are shown on the ground floor alongside the main entrance, lobby and lift lobby.

Payment plan and handover

The payment plan is structured as 10% on booking, 60% during construction and 30% on handover. The during-construction portion is divided across the first through sixth instalments. The payment-plan header identifies 30% on completion. Ozone1 Residence is scheduled for handover in Q2 2026. The project is currently classified as a new launch. Buyers considering the payment structure can therefore assess a 10% booking payment, followed by the construction-stage instalments and the final 30% payment at handover.

Developer

Ozone1 Residence is being developed by Object 1 Development. The company was founded in 2013. For this project, Object 1 Development’s residential offering combines furnished and semi-furnished apartment options with Daikin air-conditioning and ventilation systems, apartment-level air purification and ionization, and a shared amenity programme that includes pools, a gym, yoga spaces, a sauna, an aroma room, a cinema and four-storey parking.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median15.94 AEDper sq ft per year · 172 AED/m²
Range in the area1.61 – 42.66AED per sq ft · 233 buildings
A 1,000 sq ft unit≈ 15,940 AEDper year at the median · ≈ $4,340
vs Dubai median▼ -0.5%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 233 completed buildings in JVC District 13 for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Ozone1 Residence?
Ozone1 Residence is developed by Object 1 Development, a company founded in 2013.
Where is Ozone1 Residence located?
The project is in JVC District 13, within Jumeirah Village Circle.
What apartment types are available at Ozone1 Residence?
The project includes studios, one-bedroom apartments and two-bedroom apartments. There are 42 studios, 144 one-bedroom homes and 83 two-bedroom homes.
How many apartments are in Ozone1 Residence?
Ozone1 Residence has 269 apartments in total.
When is Ozone1 Residence scheduled for handover?
Handover is scheduled for Q2 2026.
What is the Ozone1 Residence payment plan?
The plan is 10% on booking, 60% during construction and 30% on handover.
What is the current status of Ozone1 Residence?
Ozone1 Residence is at the new-launch stage.
What amenities does Ozone1 Residence have?
Amenities include adult and children’s pools, a gym, indoor and outdoor yoga areas, sauna, aroma room, cinema, outdoor squash court, kids’ areas, BBQ and dining facilities, and four-storey parking.
What is nearby Ozone1 Residence?
A park is listed at five minutes, Dubai Autodrome at 10 minutes and Dubai Marina at 18 minutes.
How many apartments are left in Ozone1 Residence?
According to the Dubai Land Department (DLD) register, as of 13 Nov 2026 ≈28 of 269 apartments in the complex (2 buildings) in Ozone1 Residence have no registered sale; 241 have been sold to first buyers (90%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Ozone1 Residence?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Ozone1 Residence between 30 Jul 2025 and 3 Nov 2026: median 14 139 AED/m² (1 314 AED/sq ft); half of the deals fell between 13 247 and 15 251 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 641 000916 09939.8
1 BRAED 971 0002213 98869.4
2 BRAED 1 485 0001914 009106
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

JVC District 13: new projects and prices

15 projects · prices from DLD and developers

  1. Levanto by Oro24 Levanto by Oro24 JVC District 13 · Studio, 1–3 BR from AED 465,000
  2. Plaza Residences Plaza Residences JVC District 13 · Studio, 1–3 BR from AED 485,000
  3. Q Gardens Lofts Q Gardens Lofts JVC District 13 · Studio, 1–4 BR from AED 503,000

12 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Ozone1 Residence worth?

241 of 269 apartments in the complex have been sold to first buyers per the DLD register. DLD registrations, including resales: 256 (since 2024). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Object 1 Development

All 40 projects by Object 1 Development →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Ozone1 Residence — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-04, https://continentalclub.ae/project/ozone1-residence-jvc-district-13/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.