Gallery

On map

Dubai, Dubai Land, Dubai Land Residence Complex, Al Waleed W.S 1

Al Waleed W.S 1 is a residential project by Al Waleed Real Estate in DubaiLand Residence Complex, Dubai, with prices from AED 590 000, handover Q1 2027, construction 18.3% complete per the DLD registry, 151 units.

Price fromAED 590 000
HandoverQ1 2027
Construction18.3%
Units151

Layouts and sizes

TypeSize, sq.ftFrom, AED
Studio412–440592 000
1 BR704–1 106857 000
2 BR1 197–1 5871 296 000

Payment plan 60/40

20%40%40%
  • Down payment20%
  • During construction40%
  • On handover40%

Construction progress

18.27%
  • StatusActive
  • Construction started2025-05-01
  • HandoverQ1 2027
  • Status date18.06.2026
  • Escrow bankEmirates NBD
  • DLD project number3712

Data from the Dubai Land Department project registry (updated 09.08.2026 09:55).

Construction progress 7
18 June 2026 18.27%
Al Waleed W.S 1, DubaiLand Residence Complex construction progress — 18 June 2026, 18.27% complete, photo 1 of 5Al Waleed W.S 1, DubaiLand Residence Complex construction progress — 18 June 2026, 18.27% complete, photo 2 of 5Al Waleed W.S 1, DubaiLand Residence Complex construction progress — 18 June 2026, 18.27% complete, photo 3 of 5Al Waleed W.S 1, DubaiLand Residence Complex construction progress — 18 June 2026, 18.27% complete, photo 4 of 5Al Waleed W.S 1, DubaiLand Residence Complex construction progress — 18 June 2026, 18.27% complete, photo 5 of 5

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
14.07.20262 BR118.71 417 762
06.02.2026Studio39.1630 981
08.12.20232 685.410 000 000

Dubai Land Department transaction registry, updated 2026-08-08. Explore Dubai property transactions →

Amenities

  • Covered parking
  • District cooling
  • Energy-efficient lighting
  • Balcony
  • Fitted wardrobes
  • Decorative wall cabinets
  • Laundry room
  • Guest washroom

What is nearby

  • Downtown Dubai15 мин
  • Dubai International Airport15 мин
  • Dubai Outlet Mall5 мин
  • Global Village15 мин

Places nearby

🌳 Silicon North Park · 4.3 km

About the project

Al Waleed W.S 1 is a single-building residential project by Al Waleed Real Estate in DubaiLand Residence Complex, within Wadi Al Safa 5. The project comprises 151 apartments and is active, with construction recorded at 18.27% completion on 18 June 2026; completion is dated 28 February 2027.

The project

Al Waleed W.S 1 is planned as a B+G+2P+12-floor building with a roof level in Wadi Al Safa 5. The building has a total built-up area of 250,624.01 sq ft and a gross floor area of 130,056.64 sq ft. Its 151 apartments comprise 22 studios, 83 one-bedroom apartments and 46 two-bedroom apartments. The project includes 155 parking spaces, alongside a swimming pool and gym facility. Apartments are designed with balconies, fitted wardrobes and decorative wall cabinets. District cooling and energy-efficient lighting are included within the development. The project sits on Dubai-Al Ain Road, opposite Dubai Silicon Oasis, with access via Oud Metha Road and Dubai-Al Ain Road.

Apartment types and layouts

Studios at Al Waleed W.S 1 range from 412 to 440 sq ft and are priced from AED 592,000. Each studio includes a balcony, with fitted wardrobes and decorative wall cabinets listed among the residential features. One-bedroom apartments range from 704 to 1,106 sq ft, with prices from AED 857,000. One-bedroom layouts are offered with either a closed or open kitchen, and each has a balcony. Two-bedroom apartments range from 1,196.62 to 1,587 sq ft and start from AED 1,296,000. These homes include two en-suite bathrooms, an additional guest washroom, a dedicated laundry room and a closed kitchen. Balconies, fitted wardrobes and decorative wall cabinets are also included across the apartment offering.

Building facilities and home features

The building provides covered parking, a swimming pool and a gym facility. District cooling and energy-efficient lighting form part of the development’s listed infrastructure. Within the residences, balconies extend the apartment layouts, while fitted wardrobes and decorative wall cabinets provide integrated storage. Two-bedroom apartments have a dedicated laundry room as well as a guest washroom, in addition to their two en-suite bathrooms. Kitchen configurations differ by apartment type: one-bedroom homes can have an open or closed kitchen, while two-bedroom apartments are specified with a closed kitchen. The building’s 155 parking spaces serve a total of 151 apartments.

DubaiLand Residence Complex location

Al Waleed W.S 1 is located in DubaiLand Residence Complex in Wadi Al Safa 5. It is positioned on Dubai-Al Ain Road opposite Dubai Silicon Oasis, with road access via Oud Metha Road and Dubai-Al Ain Road. Dubai Outlet Mall and LuLu Central are each listed at five minutes from the project. DXB Airport, Downtown and Global Village are each listed at 15 minutes. The project’s setting places it within the DubaiLand Residence Complex community while retaining direct road connections towards these destinations. The address and road positioning are central to the project’s connection to Dubai Silicon Oasis, Dubai Outlet Mall, Downtown, DXB Airport and Global Village.

Payment plan and completion

The payment plan is structured as 60/40. A 20% down payment is due on booking, followed by 40% during construction and the remaining 40% on handover. The stated handover period is Q1 2027, and the recorded completion date is 28 February 2027. Construction began on 1 May 2025. The project is active and had reached a completion ratio of 18.27% at its inspection on 18 June 2026. The development contains one building and 151 units, aligning the payment structure with a defined apartment-only residential offering.

Developer

Al Waleed Real Estate is the developer of Al Waleed W.S 1. The company is also identified as Al Waleed Group in the project materials. Al Waleed Real Estate has a stated history of more than 25 years in the UAE property sector, covering residential and commercial properties as well as property management. For Al Waleed W.S 1, the developer is delivering a 151-unit residential building in DubaiLand Residence Complex with studios, one-bedroom apartments and two-bedroom apartments. The project’s recorded start date is 1 May 2025 and its completion date is 28 February 2027.

FAQ

Who is the developer of Al Waleed W.S 1?
Al Waleed W.S 1 is developed by Al Waleed Real Estate, also identified as Al Waleed Group.
Where is Al Waleed W.S 1 located?
The project is in DubaiLand Residence Complex, Wadi Al Safa 5, on Dubai-Al Ain Road opposite Dubai Silicon Oasis.
What apartment types are available at Al Waleed W.S 1?
The development includes studios, one-bedroom apartments and two-bedroom apartments. There are 22 studios, 83 one-bedroom homes and 46 two-bedroom homes.
What are the starting prices at Al Waleed W.S 1?
Studios start from AED 592,000, one-bedroom apartments from AED 857,000 and two-bedroom apartments from AED 1,296,000.
What is the payment plan for Al Waleed W.S 1?
The plan is 60/40: 20% on booking, 40% during construction and 40% on handover.
When is handover for Al Waleed W.S 1?
Handover is stated for Q1 2027. The recorded completion date is 28 February 2027.
What is the construction status of Al Waleed W.S 1?
The project is active and was recorded at 18.27% completion following an inspection on 18 June 2026.
What facilities are included at Al Waleed W.S 1?
Facilities include covered parking, a swimming pool, a gym, district cooling and energy-efficient lighting.
What is near Al Waleed W.S 1?
Dubai Outlet Mall and LuLu Central are listed at five minutes, while DXB Airport, Downtown and Global Village are listed at 15 minutes.
How can I buy an apartment in Al Waleed W.S 1?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request