Developer: Gutti Development · DubaiLand Residence Complex
Veona By Gutti is a residential project by Gutti Development in DubaiLand Residence Complex, Dubai, with prices from AED 647 000, handover Q4 2027, construction 21.7% complete per the DLD registry, 88 apartments (+2 non-residential units), 33 sold to first buyers per the DLD register (as of 25 Nov 2026).
· price from DLD deals · DLD data as of 25 Nov
| Type | Units | Typical size, sq.ft |
|---|---|---|
| Studio | 48 | 397–479 |
| 1 Bedroom | 27 | 752–1 176 |
| 2 Bedroom | 13 | 1 101–2 074 |
| Retail | 2 | 690–1 091 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: Studio — ~65 sq.ft (6.0 m²); 1 Bedroom — ~149 sq.ft (14 m²); 2 Bedroom — ~364 sq.ft (34 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈55 of 88 apartments availableestimate
Sold to first buyers 33 (38%)Available ≈55
| Type | Total | Sold | Available |
|---|---|---|---|
| Studios | 48 | 13 | 35 |
| 1 bedroom | 27 | 15 | 12 |
| 2 bedrooms | 13 | 5 | 8 |
| Total | 88 | 33 | 55 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded; this is an estimate. Non-residential units (2) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
33 of 88 apartments have been sold to first buyers per the DLD register. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 27.11.2026 05:55).
Pace: 2.41% per month. At this rate 100% falls on 01.07.2029.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
77 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Gutti Development · District: DubaiLand Residence Complex
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 37 | 647 967 | 17 513 | 13 |
| 1 bedroom | 71 | 1 059 000 | 14 915 | 15 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 25.11.2026 | 2 BR | 127.1 | 1 700 000 |
| 22.10.2026 | 1 BR | 70.3 | 1 000 792 |
| 21.10.2026 | 2 BR | 127.1 | 1 583 705 |
| 21.10.2026 | 1 BR | 109.2 | 1 100 000 |
| 21.10.2026 | 1 BR | 109.2 | 1 250 000 |
| 21.09.2026 | 2 BR | 116.9 | 1 400 000 |
| 21.09.2026 | Studio | 41.8 | 681 541 |
| 21.09.2026 | 2 BR | 105.3 | 1 363 200 |
| 18.09.2026 | 1 BR | 69.9 | 1 100 000 |
| 10.08.2026 | 1 BR | 71.4 | 995 000 |
| 05.08.2026 | 2 BR | 97.9 | 1 380 000 |
| 28.07.2026 | Studio | 37.2 | 654 496 |
| 28.07.2026 | 1 BR | 109.2 | 1 200 000 |
| 28.07.2026 | Studio | 36.8 | 647 967 |
| 25.06.2026 | Studio | 37.2 | 654 496 |
| 23.06.2026 | 1 BR | 71.4 | 1 060 000 |
| 23.06.2026 | 1 BR | 71.3 | 1 059 000 |
| 10.06.2026 | Studio | 36.8 | 647 967 |
| 08.06.2026 | 1 BR | 109.2 | 1 155 000 |
| 18.05.2026 | Studio | 37.3 | 654 496 |
| 18.05.2026 | 1 BR | 71.4 | 1 007 000 |
| 15.05.2026 | 1 BR | 69.9 | 1 015 098 |
| 15.05.2026 | Studio | 36.8 | 647 500 |
| 13.04.2026 | Studio | 36.8 | 639 936 |
| 26.03.2026 | 1 BR | 71.4 | 985 620 |
| 25.03.2026 | Studio | 36.8 | 647 967 |
| 16.03.2026 | 1 BR | 69.9 | 1 025 352 |
| 12.03.2026 | Studio | 36.8 | 647 967 |
| 12.03.2026 | 1 BR | 69.9 | 1 025 352 |
| 11.03.2026 | 1 BR | 77.0 | 1 106 398 |
| 11.03.2026 | Studio | 36.8 | 635 136 |
| 10.03.2026 | Studio | 36.8 | 647 967 |
| 10.03.2026 | Studio | 37.2 | 648 016 |
Dubai Land Department transaction registry, updated 26.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 647 000 AED is 2 732 AED.
Estimates only; not a bank approval.


Vladimir Malin
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Veona By Gutti: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Veona By Gutti is a one-building residential development by Gutti Real Estate Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The project is configured as G+P+5 and is active, with 21.66% completion recorded at the inspection dated 14 October 2026. Its completion date is 31 December 2027.
Veona By Gutti comprises one residential building in DubaiLand Residence Complex. The building is described as G+P+5, with a ground level, podium and five floors indicated in its configuration. The project has 88 apartments (+2 non-residential units) and a recorded total area of 5,780.20. Work started on 1 November 2025, and the development is scheduled for completion on 31 December 2027. The project sits in the Wadi Al Safa 5 area, which forms part of the wider DubaiLand cluster. DubaiLand Residence Complex contains a mix of mid-rise residential buildings, newer construction plots, landscaped roundabouts and road improvements.
Veona By Gutti has active status. The completion ratio was 21.66% at the inspection carried out on 14 October 2026. The recorded project start date is 1 November 2025, while the completion date is set as 31 December 2027. The development is a single-building project rather than a multi-building scheme. Its G+P+5 format and 88-apartment total place all residences within the same building. Buyers considering the project can use the recorded completion date and inspection ratio as the available construction milestones for Veona By Gutti.
DubaiLand Residence Complex is a residential community in DubaiLand, administered within the Wadi Al Safa 5 sub-area. It lies north-west of central Dubai and includes multiple residential buildings alongside newer development sites. The neighbourhood has landscaped main roundabouts, community green areas, roads and pavements. There are two mid-sized parks in each half of the complex, as well as smaller parks on its edges. These outdoor areas include sports facilities and children’s play areas. Improvements to principal junctions and streetscaping are complete or in their final stages. Veona By Gutti is located within this established and expanding residential setting.
The Aquila School is 0.4 km from DubaiLand Residence Complex, while GEMS FirstPoint School is 0.6 km away. Global Village is 7.6 km from the community. The Dubai Mall is 15.4 km away, Business Bay is 15.5 km away, and Burj Khalifa and Downtown Dubai are 15.7 km away. Dubai International Financial Centre is 16.5 km from the community. Dubai International Airport is 18.0 km away, with Mall of the Emirates at 18.1 km. Dubai Marina is 24.0 km from DubaiLand Residence Complex.
Road connections are the principal form of travel from DubaiLand Residence Complex. Public transport access is limited in the immediate area. Green Line station G30 is 14.6 km away and is not within walking distance of the community. The surrounding road network connects the area with Global Village, central Dubai, Dubai International Airport and other city destinations. Within the community, on-street parking has been fully allocated. A charge of AED 3 per hour applies where it is enforced. Main junction and streetscape works in the area are complete or in their final stages.
Compare with other projects under construction: new off-plan launches in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
Based on 32 registered DLD sales in Veona By Gutti between 10 Mar 2026 and 22 Oct 2026: median 14 757 AED/m² (1 371 AED/sq ft); half of the deals fell between 13 895 and 17 572 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| Studio | AED 647 000 | 13 | 17 575 | 36.8 |
| 1 BR | AED 1 016 000 | 15 | 14 228 | 71.4 |
| 2 BR | AED 1 411 000 | 4 | 12 702 | 111.1 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
DubaiLand Residence Complex: new projects and prices
30 projects · prices from DLD and developers
Ag 7even DubaiLand Residence Complex · Studio, 1–2 BR
from AED 485,000
Ag 9ine DubaiLand Residence Complex · Studio, 1–2 BR
from AED 488,000
Time 3 DubaiLand Residence Complex · Studio, 1–3 BR
from AED 490,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Veona By Gutti — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-26, https://continentalclub.ae/project/veona-by-gutti-dubailand-residence-complex/