Developer: Aark Developers · DubaiLand Residence Complex

Aark Terraces

Aark Terraces is a residential project by Aark Developers in DubaiLand Residence Complex, Dubai, with prices from AED 950 000, handover Q4 2027, 131 units.

Price fromAED 950 000Developer supplied
Unit types1 · 2 BR758–1 577 sq.ftDLD registry
HandoverQ4 2027Developer suppliedDLD registry: 30.06.2028
Construction0%DLD registry · checked 06.10.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom65758–871
2 Bedroom661 114–1 577

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: 1 Bedroom — ~173 sq.ft (16 m²); 2 Bedroom — ~320 sq.ft (30 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Payment plan 60/40 (3 Years P.H.O)

The purchase price is split into these stages.

160%On handover
240%Post-handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

0%
  • StatusActive
  • Construction started01.04.2025
  • HandoverQ4 2027
  • Status date06.10.2026
  • Escrow bankMashreq Bank
  • DLD project number3686

Data from the Dubai Land Department project registry (updated 27.11.2026 05:55).

Inspection history 4
025507510030.04.202506.10.2026
Actual, per inspections

The register shows the same percentage as at the inspection on 05.01.2026.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 39
06.10.2026 0.00%
Aark Terraces, DubaiLand Residence Complex construction progress — 6 October 2026, 0.00% complete, photo 1 of 5Aark Terraces, DubaiLand Residence Complex construction progress — 6 October 2026, 0.00% complete, photo 2 of 5Aark Terraces, DubaiLand Residence Complex construction progress — 6 October 2026, 0.00% complete, photo 3 of 5Aark Terraces, DubaiLand Residence Complex construction progress — 6 October 2026, 0.00% complete, photo 4 of 5Aark Terraces, DubaiLand Residence Complex construction progress — 6 October 2026, 0.00% complete, photo 5 of 5
27.07.2026 0.00%
Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 1 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 2 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 3 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 4 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 5 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 6 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 7 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 8 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 9 of 10Aark Terraces, DubaiLand Residence Complex construction progress — 27 July 2026, 0.00% complete, photo 10 of 10
05.01.2026 0.00%
Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 1 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 2 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 3 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 4 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 5 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 6 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 7 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 8 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 9 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 10 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 11 of 12Aark Terraces, DubaiLand Residence Complex construction progress — 5 January 2026, 0.00% complete, photo 12 of 12
30.04.2025 0.00%
Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 1 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 2 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 3 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 4 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 5 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 6 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 7 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 8 of 9Aark Terraces, DubaiLand Residence Complex construction progress — 30 April 2025, 0.00% complete, photo 9 of 9

3 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 950 000 AED is 4 012 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Outdoor seating area
  • Outdoor yoga
  • Outdoor cinema
  • Outdoor kids play area
  • Infinity swimming pool
  • Kids swimming pool
  • Steam & sauna
  • Cabana
  • Water fountain
  • Walking track
  • Sunbathing area
  • Fire pit
  • Outdoor gym area
  • BBQ area
  • Rainforest play area

What is nearby

  • Academic City10 min
  • Al Maktoum International Airport30 min
  • Burj Khalifa20 min
  • Dubai International Airport20 min
  • Dubai Mall20 min
  • Dubai Outlet Mall5 min
  • Global Village10 min
  • IMG World of Adventure10 min
  • Silicon Central Mall8 min
Aark Terraces

Your broker for this project

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Aark Terraces: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Aark Terraces is a 131-residence apartment project by Aark Developers in DubaiLand Residence Complex, within Wadi Al Safa 5. The development offers one- and two-bedroom apartments, with private Jacuzzis in select residences. It is registered as Active with a completion ratio of 0.00%.

The project and building

Aark Terraces is planned as one residential building configured B+G+11+R, comprising a basement, ground level, 11 floors and a roof level. The project contains 131 residences in total. Its design includes greenery on the building exterior, with vertical planting presented as part of the façade. Interior design elements include marble finishes, gold accents, open-plan layouts and floor-to-ceiling windows. Select apartments include private Jacuzzis. The shared outdoor programme includes an infinity swimming pool, cabanas, a fire pit, sunbathing area, water fountain and outdoor seating. Aark Terraces is located in DubaiLand Residence Complex, a residential community within the wider DubaiLand area.

Apartment collection

The residential collection at Aark Terraces consists of one-bedroom and two-bedroom apartments. There are 131 residences across the project, rather than multiple buildings or separate phases. Private Jacuzzis are included in select units. The apartment concept incorporates open-plan arrangements and floor-to-ceiling windows, alongside marble touches and gold-finish details. The project’s starting price is AED 950,000. This is a new-launch development, with the government project record identifying Aark Developers L.L.C as the developer entity and a project start date of 1 April 2025. Aark Developers is the name used for the development.

Outdoor, leisure and wellness amenities

Aark Terraces has an infinity swimming pool and a separate kids’ swimming pool. Outdoor spaces include a sunbathing area, cabanas, a fire pit, water fountain and outdoor seating area. The amenities programme also provides an outdoor cinema, BBQ area and rainforest play area. Children have access to an outdoor kids’ play area, while the leisure facilities include a walking track. The project’s wellness and fitness facilities comprise outdoor yoga, an outdoor gym area, steam and sauna. These facilities are arranged alongside the development’s landscaped greenery and open-air recreation areas.

DubaiLand Residence Complex location

Aark Terraces sits in DubaiLand Residence Complex and has connections to Sheikh Mohammed bin Zayed Road, Al Ain Road and Emirates Road. Aquila School is listed at 2 minutes, while The Centro is listed at 3 minutes and Al Habtoor Polo Resort at 5 minutes. Dubai Outlet Mall is listed at 5 minutes and Silicon Central Mall at 8 minutes. Academic City, GEMS Wellington Academy, clinics and hospitals, IMG Worlds of Adventure and Global Village are each listed at 10 minutes. Dragon Mart is listed at 15 minutes. Dubai Mall, Burj Khalifa and Dubai International Airport are listed at 20 minutes, while Al Maktoum International Airport is listed at 30 minutes. Public parks are listed within walking distance.

Payment plan and handover

The stated payment plan is 60/40, with 60% payable until handover and the remaining 40% payable after handover within 36 months. Payment plan: 60% on handover, 40% post-handover. Handover is stated for Q4 2027. Aark Terraces has a registered project number of 3686 and is currently marked Active, with a completion ratio of 0.00%. The project record gives a start date of 1 April 2025. Buyers considering the payment structure can assess a construction-period allocation of 60% followed by a 40% post-handover allocation over three years.

Aark Developers

Aark Developers is the developer of Aark Terraces. The company was founded in 2023 and is based in Dubai, UAE. Aark Developers describes its team as having more than 25 years of collective experience in residential and hospitality projects. Rahul Kumar Gupta is the Chairman, Founder and Chief Executive Officer of Aark Developers. The company identifies Gardenia Livings in Arjan and Aark Residences in Dubai among its projects. Aark Terraces is one of the developer’s projects in DubaiLand, alongside its stated venture Sora Beach Residences on Al Marjan Island in Ras Al Khaimah.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median13.86 AEDper sq ft per year · 149 AED/m²
Range in the area4.51 – 19.01AED per sq ft · 28 buildings
A 1,000 sq ft unit≈ 13,860 AEDper year at the median · ≈ $3,774
vs Dubai median▼ -13.5%Dubai 16.02 AED/sq ft

Check the charge for a specific building →

Median across 28 completed buildings in DubaiLand Residence Complex for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Aark Terraces?
Aark Terraces is developed by Aark Developers. The registered developer entity is Aark Developers L.L.C.
Where is Aark Terraces located?
Aark Terraces is located in DubaiLand Residence Complex, within Wadi Al Safa 5. It has connections to Sheikh Mohammed bin Zayed Road, Al Ain Road and Emirates Road.
What apartment types are available at Aark Terraces?
The project offers one-bedroom and two-bedroom apartments. Private Jacuzzis are included in select residences.
How many residences are in Aark Terraces?
Aark Terraces comprises 131 residences in one building. The building is configured B+G+11+R.
What is the starting price at Aark Terraces?
The starting price is AED 950,000.
What is the Aark Terraces payment plan?
The payment plan is 60% until handover and 40% post-handover within 36 months. Payment plan: 60% on handover, 40% post-handover.
When is the Aark Terraces handover date?
Aark Terraces handover (completion) is scheduled for Q4 2027 (developer data). The DLD register lists 30 June 2028. Construction progress was 0% at the DLD inspection of 6 October 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Aark Terraces?
Aark Terraces is marked Active with a completion ratio of 0.00%. The recorded project start date is 1 April 2025.
What is near Aark Terraces?
Aquila School is listed at 2 minutes and Dubai Outlet Mall at 5 minutes. Global Village, Academic City and IMG Worlds of Adventure are each listed at 10 minutes.
How can I buy an apartment in Aark Terraces?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

PDF shortlist · updated 1 November 2026

DubaiLand Residence Complex: new projects and prices

30 projects · prices from DLD and developers

  1. Ag 7even Ag 7even DubaiLand Residence Complex · Studio, 1–2 BR from AED 485,000
  2. Ag 9ine Ag 9ine DubaiLand Residence Complex · Studio, 1–2 BR from AED 488,000
  3. Time 3 Time 3 DubaiLand Residence Complex · Studio, 1–3 BR from AED 490,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

More projects by Aark Developers

All 2 projects by Aark Developers →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Aark Terraces — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-17, https://continentalclub.ae/project/aark-terraces-dubailand-residence-complex/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.