by Object 1 Development in DubaiLand Residence Complex
Verdania 2 is a residential project by Object 1 Development in DubaiLand Residence Complex, Dubai, with handover 30.03.2027, construction 9% complete per the DLD registry.
Construction progress
- Handover30.03.2027
- Status date18.06.2026
- DLD project number3576
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
About the project
Verdania 2 is a single residential building by Obj1 Real Estate Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The development is configured as B+G+11+R and contains 108 units. It is active, with 9.01% completion recorded on 18 June 2026 and a completion date of 30 March 2027.
The project
Verdania 2 is planned as one residential building with a basement, ground floor, 11 upper floors and a roof level. The project contains 108 units within a recorded total area of 8,666.09. Construction started on 4 June 2025. The project is located in DubaiLand Residence Complex, a residential community in the wider DubaiLand area and within the Wadi Al Safa 5 sub-area. DubaiLand Residence Complex includes multiple residential buildings and newer development plots, together with landscaped roads, pavements and roundabouts.
Construction progress and completion
Verdania 2 has active status. Its completion ratio was 9.01% at the inspection dated 18 June 2026. The planned project completion date is 30 March 2027. The development started on 4 June 2025 and is being delivered as a single building. The current project configuration is B+G+11+R, comprising a basement, ground floor, 11 floors and a roof level. The total unit count is 108.
DubaiLand Residence Complex setting
DubaiLand Residence Complex is a planned residential development within Wadi Al Safa 5, north-west of central Dubai. The community combines mid-rise residential projects, community green areas and basic street infrastructure. Landscaped roundabouts and junctions contribute to the public realm across the development. The area has two mid-sized parks in each half of the complex, as well as smaller peripheral parks. These parks include sports facilities and children’s play areas. Main junction and streetscape improvements in the community are complete or in their final stages.
Schools, parks and community facilities
The Aquila School is 0.4 km from DubaiLand Residence Complex, while GEMS FirstPoint School is 0.6 km away. Parks and sports areas are distributed through the community’s central and peripheral areas. The two mid-sized parks in each half of the complex are supplemented by smaller parks on the edges of the development, with play areas and sports facilities. Within the community, on-street parking is fully allocated. Where applicable, street parking is charged at AED 3 per hour.
Connections to Dubai destinations
Global Village is 7.6 km from DubaiLand Residence Complex. The Dubai Mall is 15.4 km away, while Business Bay is 15.5 km away. Burj Khalifa and Downtown Dubai are 15.7 km from the community, and DIFC is 16.5 km away. Dubai International Airport is 18.0 km away and Mall of the Emirates is 18.1 km away. Dubai Marina is 24.0 km from the community. Road connections are the main travel mode from the immediate area.
Developer
Obj1 Real Estate Development is the developer of Verdania 2. The company is delivering the project in DubaiLand Residence Complex, within Wadi Al Safa 5. Verdania 2 is a 108-unit residential development arranged in one B+G+11+R building. The project commenced on 4 June 2025, has active status, and carries a scheduled completion date of 30 March 2027. Its recorded completion ratio was 9.01% on 18 June 2026.