Developer: H M B Homes Real Estate Development · DubaiLand Residence Complex
Beverly Park is a residential project by HMB Homes Real Estate Development in DubaiLand Residence Complex, Dubai, with handover Q4 2027, construction 0.8% complete per the DLD registry, 159 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 22.09.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: HMB Homes Real Estate Development · District: DubaiLand Residence Complex
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 11.09.2026 | Studio | 33.7 | 625 000 |
| 08.09.2026 | 2 BR | 101.0 | 1 315 000 |
| 24.08.2026 | 2 BR | 107.7 | 1 527 799 |
| 03.08.2026 | 2 BR | 98.5 | 1 372 668 |
| 28.07.2026 | 2 BR | 107.7 | 1 452 190 |
| 06.07.2026 | Studio | 33.7 | 625 000 |
| 06.07.2026 | 2 BR | 99.4 | 1 350 658 |
| 17.06.2026 | Studio | 40.7 | 650 000 |
| 19.05.2026 | Studio | 40.6 | 550 000 |
| 21.04.2026 | Studio | 40.6 | 650 000 |
| 21.04.2026 | Studio | 40.6 | 600 000 |
| 13.04.2026 | Studio | 39.7 | 660 000 |
| 13.04.2026 | 1 BR | 108.0 | 1 065 000 |
| 13.04.2026 | Studio | 40.6 | 537 500 |
| 24.03.2026 | Studio | 39.7 | 617 500 |
| 24.03.2026 | Studio | 40.6 | 587 500 |
| 12.03.2026 | Studio | 39.7 | 537 500 |
| 12.03.2026 | 1 BR | 66.0 | 990 000 |
| 11.03.2026 | Studio | 40.6 | 593 750 |
| 11.03.2026 | 1 BR | 107.9 | 1 050 000 |
Dubai Land Department transaction registry, updated 2026-09-20. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 41 | 600 000 | 14 634 | 37 |
| 1 bedroom | 67 | 1 000 000 | 14 925 | 7 |
| 2 bedrooms | 101 | 1 350 658 | 13 373 | 8 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Beverly Park is a residential building by H M B Homes Real Estate Development in DubaiLand Residence Complex, within Wadi Al Safa 5. The project comprises 159 residences in a building configured with two basement levels, a ground floor, 11 residential floors and a rooftop. It is active, with a recorded completion ratio of 79% following an inspection on 2 April 2026, and completion is scheduled for 31 October 2027.
Beverly Park is planned as a single residential building with 2B+G+11+R configuration: two basement levels, a ground floor, 11 floors and a rooftop. The building’s exterior is defined by vertical symmetry, geometric lines, balconies and arranged window frames. Its 159 residences are arranged within a low-rise format, with the rooftop and level 2 dedicated to resident facilities. Homes are designed with balconies and layouts that bring daylight and fresh air into the interior spaces. The residential concept also includes higher ceilings, large windows and views towards greenery and the surrounding modern locality. The project start date is 31 October 2025 and its scheduled completion date is 31 October 2027.
The residence mix at Beverly Park includes studios, one-bedroom apartments and two-bedroom apartments. Homes are presented with open layouts designed for everyday living, working and time with family. The interiors incorporate smart-home technology, while bedrooms and living rooms are furnished. Balconies form part of the residential design, extending the living spaces and allowing air and daylight to reach the homes. The collection is conceived as a set of curated residences with layouts intended to support work, relaxation and family use. Each of the 159 units forms part of the building’s single residential address in DubaiLand Residence Complex.
Beverly Park places its shared facilities on level 2 and the rooftop. The amenity programme includes an azure pool, a gym, a Zen garden and a yoga and meditation zone. Residents also have access to a children’s play area, changing room with spa, open-space lounge and dining lounge. Work and quieter indoor time are accommodated through a co-working and reading zone. Social areas include an open cinema, gathering terrace, rooftop barbecue zone, The Palm retreat and the Sunset Circle. These facilities are complemented by a rooftop lounge and landscaped greenery within the project’s setting. The amenities combine spaces for exercise, relaxation, reading, dining, children’s play and group gatherings within the building.
Beverly Park is located in DubaiLand Residence Complex, a residential community in the wider DubaiLand area and within Wadi Al Safa 5. The community contains residential buildings, newer construction plots, landscaped roundabouts, roads, pavements, green areas and parks. Within the immediate project surroundings, DRC South Community Hub is 0.1 km away, while DRC South Park and DRC Eastern Community Hub are each 0.4 km away. The Aquila School is 0.4 km from the community and GEMS FirstPoint School is 0.6 km away. DubaiLand Residence Complex includes two mid-sized parks in each half of the development, along with smaller peripheral parks that feature sports facilities and children’s play areas.
The project is positioned close to Al Ain Road and Emirates Road. IMG Worlds of Adventure is 6.4 km from Beverly Park, and Global Village is 8.0 km away. Novo Cinema at IMG Worlds of Adventure is also 6.4 km away, while Novo Cinema at Dragon Mall is 10.2 km away. The Track Meydan Golf is 11.1 km from the project. Within the broader community, the nearest Green Line metro station, G30, is 14.6 km away; road travel is the primary means of transport from the area. DubaiLand Residence Complex is 15.7 km from Burj Khalifa and Downtown Dubai, 16.5 km from DIFC, and 18.0 km from Dubai International Airport.
The payment plan sets out a 20% down payment on the booking date. A further 40% is due during construction across the first to fourth instalments, followed by 40% on handover at 100% completion. Beverly Park has an active project status and a completion ratio of 79%, based on the inspection dated 2 April 2026. The project is scheduled to complete on 31 October 2027. The same date is recorded as the project end date. H M B Homes Real Estate Development is the developer of Beverly Park, which has 159 units within one building.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Beverly Park — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-09, https://continentalclub.ae/project/beverly-park-dubailand-residence-complex/