Developer: Imtiaz Real Estate Investment & Development · DubaiLand Residence Complex
Cove Edition Residence 4 By Imtiaz is a residential project by Imtiaz Developments in DubaiLand Residence Complex, Dubai, with handover 21.01.2027, construction 30.2% complete per the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Imtiaz Developments · District: DubaiLand Residence Complex
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 05.08.2026 | 1 BR | 73.2 | 910 000 |
| 29.07.2026 | Studio | 38.9 | 669 670 |
| 30.06.2026 | Studio | 35.8 | 677 417 |
| 26.06.2026 | Studio | 36.8 | 735 079 |
| 02.03.2026 | Studio | 36.2 | 694 188 |
| 25.02.2026 | Studio | 39.0 | 684 417 |
| 24.02.2026 | 1 BR | 73.2 | 920 751 |
| 19.01.2026 | 1 BR | 74.3 | 989 199 |
| 10.12.2025 | Studio | 36.8 | 770 000 |
| 20.11.2025 | Studio | 39.0 | 730 027 |
| 20.11.2025 | Studio | 39.0 | 690 909 |
| 14.11.2025 | Studio | 38.7 | 679 598 |
| 13.11.2025 | Studio | 50.6 | 728 397 |
| 13.11.2025 | Studio | 35.8 | 622 665 |
| 12.11.2025 | 1 BR | 98.3 | 1 187 122 |
| 06.11.2025 | Studio | 39.0 | 690 909 |
| 22.10.2025 | Studio | 35.8 | 667 903 |
| 21.10.2025 | 1 BR | 98.3 | 1 187 122 |
| 21.10.2025 | 1 BR | 73.2 | 992 077 |
| 17.10.2025 | Studio | 45.4 | 762 044 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 39 | 685 803 | 17 585 | 161 |
| 1 bedroom | 74 | 997 351 | 13 478 | 91 |
| 2 bedrooms | 140 | 1 589 016 | 11 350 | 13 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Cove Edition Residence 4 By Imtiaz is a 260-unit residential building in DubaiLand Residence Complex, within Wadi Al Safa 5. It is being developed by Imtiaz Real Estate Investment & Development and is listed as active, with construction completion at 30.16%. The scheduled completion date is 21 January 2027.
Cove Edition Residence 4 By Imtiaz is planned as one residential building with one basement level, a ground floor, three podium levels, 13 floors and a roof level. The building contains 260 residential units across studios, one-bedroom apartments and two-bedroom apartments. Apartments are specified with 3.2-metre floor-to-ceiling heights, fully furnished interiors and Alexa-equipped smart-home systems. Each home is described with custom-made furniture, a built-in office area for working from home, Bosch kitchen appliances, a 24-inch Apple iMac and a 65-inch Samsung television. Interior specifications also include Fondovalle Italian tiles, Gessi sanitaryware, Geberit sanitary fixtures and Grohe purified drinking and sparkling water fittings.
The project comprises 169 studios, 78 one-bedroom apartments and 13 two-bedroom apartments. Studio apartments range from 386 to 440 sq ft, with starting prices from AED 628,000. One-bedroom homes range from 788 to 1,144 sq ft and start from AED 935,000. Two-bedroom apartments range from 1,427 to 1,505 sq ft, with starting prices from AED 1,495,000. These three unit categories account for all 260 homes in the building. The apartments are offered fully furnished, with equipped Bosch kitchens and Alexa smart-home technology included in the stated specification.
Shared facilities are arranged from the ground level to the rooftop. The rooftop includes an infinity pool, while the building also provides a fully equipped gym and a club room with a billiard table. A courtyard children’s playground forms part of the amenity provision. The development includes an electric-vehicle recharge station and additional visitor parking. In-home work areas, the 24-inch Apple iMac and the 65-inch Samsung television are among the specified residential features. Furnishing, fitted kitchens, smart-home systems and the listed interior finishes are included within the project’s stated apartment specification.
The project is located in DubaiLand Residence Complex, a residential community within Wadi Al Safa 5 in the wider DubaiLand area. The community contains residential buildings, community green areas, landscaped roundabouts, parks and sports areas. Global Village is 7.6 km from the community. The Dubai Mall is 15.4 km away, Business Bay is 15.5 km away, and Burj Khalifa and Downtown Dubai are 15.7 km away. Dubai International Financial Centre is 16.5 km away, Dubai International Airport is 18.0 km away, Mall of the Emirates is 18.1 km away and Dubai Marina is 24.0 km away. The Aquila School is 0.4 km away and GEMS FirstPoint School is 0.6 km away.
The project’s scheduled completion date is 21 January 2027. Construction commenced on 21 January 2025, and the recorded completion ratio is 30.16%. A 50/50 payment option requires a 20% down payment, followed by 5% in March 2025, 5% in June 2025, 10% in November 2025, 5% in March 2026, 5% in June 2026 and the remaining 50% at completion. A 70/30 option requires a 20% down payment, followed by 5% in March 2025, 5% in June 2025, 10% in November 2025, 10% in March 2026, 5% in June 2026 and 15% at completion. The final 30% is payable quarterly at 2.5% over three years after key handover.
Imtiaz Real Estate Investment & Development is the developer of Cove Edition Residence 4 By Imtiaz. The company was initially founded as a construction company in 1993 and established its development arm in 2014. Its listed projects include Cove Edition, Cove Edition 2, Cove Edition 3 and Cove Edition 4 in DubaiLand Residence Complex; Beach Walk, Beach Walk 2, Beach Walk 3, Beach Walk Grand and Sunset Bay on Dubai Islands; Pearl House, Pearl House 2, Pearl House 3, Luxor, Westwood Grande and Westwood Grande 2 in JVC; Westwood in Al Furjan; and Hyde Walk in Jumeirah Gardens.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.