Developer: Emaar Properties · Dubai Hills Estate
Vida Residences Hillside is a residential project by Emaar Properties in Dubai Hills Estate, Dubai, with prices from AED 2 853 888, handover 31.05.2029, construction 10% complete per the DLD registry, 500 apartments, 441 sold to first buyers per the DLD register (as of 25 Nov 2026).
· DLD data as of 25 Nov
| Type | Units | Typical size, sq.ft |
|---|---|---|
| 1 Bedroom | 254 | 727–844 |
| 2 Bedroom | 166 | 1 065–1 327 |
| 3 Bedroom | 80 | 1 583–2 622 |
Size range excludes the smallest and largest 5% of units of each type.
All units are freehold. Data from the DLD registry.
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: 1 Bedroom — ~64 sq.ft (5.9 m²); 2 Bedroom — ~159 sq.ft (15 m²); 3 Bedroom — ~328 sq.ft (31 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈60 of 500 apartments availableestimate
Sold to first buyers 441 (88%)Available ≈60
| Type | Total | Sold | Available |
|---|---|---|---|
| 1 bedroom | 254 | 210 | 44 |
| 2 bedrooms | 166 | 156 | 10 |
| 3 bedrooms | 80 | 75 | 5 |
| Total | 500 | 441 | 59 |
| Building | Apartments | Sold | Available |
|---|---|---|---|
| Tower A | 184 | 169 | 15 |
| Tower B | 308 | 264 | 44 |
| Podium | 8 | 8 | 0 |
| Whole project | 500 | 441 | 59 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded; this is an estimate.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2029 →
Data from the Dubai Land Department project registry (updated 27.11.2026 05:55).
Pace: 1.22% per month. At this rate 100% falls on 03.07.2032.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
42 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Emaar Properties · District: Dubai Hills Estate
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved -2% over the same period, so the building matched it.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 69 | 1 952 888 | 28 303 | 212 |
| 2 bedrooms | 110 | 3 007 888 | 27 344 | 157 |
| 3 bedrooms | 170 | 4 423 168 | 26 019 | 84 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 17.11.2026 | 3 BR | 169.7 | 4 623 888 |
| 13.11.2026 | 1 BR | 68.3 | 1 933 888 |
| 23.10.2026 | 3 BR | 84.9 | 2 307 444 |
| 16.10.2026 | 1 BR | 68.9 | 1 845 744 |
| 16.10.2026 | 1 BR | 67.6 | 1 807 744 |
| 16.10.2026 | 1 BR | 68.3 | 1 844 794 |
| 16.10.2026 | 1 BR | 72.3 | 1 840 994 |
| 16.10.2026 | 1 BR | 68.3 | 1 831 494 |
| 02.10.2026 | 3 BR | 169.7 | 4 457 910 |
| 01.10.2026 | 2 BR | 123.3 | 3 126 090 |
| 22.09.2026 | 1 BR | 68.3 | 1 936 888 |
| 21.09.2026 | 3 BR | 169.7 | 4 414 510 |
| 21.09.2026 | 3 BR | 169.7 | 4 464 534 |
| 21.09.2026 | 3 BR | 169.7 | 4 467 420 |
| 21.09.2026 | 1 BR | 78.4 | 2 036 446 |
| 21.09.2026 | 1 BR | 77.1 | 1 988 346 |
| 18.09.2026 | 2 BR | 99.8 | 3 013 888 |
| 11.09.2026 | 3 BR | 169.7 | 4 406 814 |
| 11.09.2026 | 3 BR | 169.7 | 4 409 700 |
| 11.09.2026 | 3 BR | 169.7 | 4 417 396 |
| 11.09.2026 | 3 BR | 169.7 | 4 423 168 |
| 11.09.2026 | 3 BR | 169.7 | 4 426 054 |
| 10.09.2026 | 3 BR | 169.7 | 4 368 730 |
| 10.09.2026 | 3 BR | 169.7 | 4 466 730 |
| 10.09.2026 | 3 BR | 169.7 | 4 454 970 |
| 07.09.2026 | 1 BR | 69.0 | 1 946 888 |
| 07.09.2026 | 1 BR | 77.2 | 2 018 888 |
| 25.08.2026 | 1 BR | 68.3 | 1 873 931 |
| 27.07.2026 | 1 BR | 68.3 | 1 872 961 |
| 27.07.2026 | 1 BR | 68.3 | 1 870 051 |
| 22.07.2026 | 1 BR | 68.3 | 1 940 888 |
| 22.07.2026 | 1 BR | 68.3 | 1 867 141 |
| 13.07.2026 | 1 BR | 67.6 | 1 909 888 |
| 19.05.2026 | 3 BR | 169.7 | 4 562 888 |
| 07.05.2026 | 1 BR | 68.9 | 1 949 888 |
| 27.04.2026 | 1 BR | 68.9 | 1 964 888 |
| 09.04.2026 | 1 BR | 68.3 | 1 935 888 |
| 08.04.2026 | 1 BR | 78.5 | 2 061 888 |
| 07.04.2026 | 1 BR | 68.3 | 1 944 888 |
| 06.04.2026 | 2 BR | 130.5 | 3 263 888 |
| 03.04.2026 | 2 BR | 143.3 | 3 386 888 |
| 31.03.2026 | 2 BR | 121.8 | 3 181 888 |
| 30.03.2026 | 1 BR | 70.3 | 1 831 888 |
| 30.03.2026 | 1 BR | 67.6 | 1 920 888 |
| 30.03.2026 | 1 BR | 68.3 | 1 939 888 |
| 30.03.2026 | 1 BR | 68.3 | 1 941 888 |
| 30.03.2026 | 1 BR | 68.3 | 1 935 888 |
| 26.03.2026 | 2 BR | 121.8 | 3 223 888 |
| 23.03.2026 | 2 BR | 121.8 | 3 229 888 |
| 18.03.2026 | 2 BR | 121.8 | 3 217 888 |
Dubai Land Department transaction registry, updated 26.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 853 888 AED is 12 051 AED.
Estimates only; not a bank approval.


Vladimir Malin
Senior Broker · Continental Club Property · RERA ORN 31933
Answers questions about Vida Residences Hillside: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Vida Residences Hillside is a 500-home residential development by Emaar Properties in Dubai Hills Estate. The project comprises two residential towers and eight 3-bedroom townhouses, with 1- to 3-bedroom apartments also available. Construction is active, with a recorded completion ratio of 10.00% and scheduled completion on 31 May 2029.
Vida Residences Hillside combines apartment living with a limited collection of townhouses in Dubai Hills Estate. The development includes Tower A, configured as basement, ground floor, podium and 20 residential floors, with 184 residential units. Tower B has basement, ground floor, podium and 19 residential floors, with 308 residential units. Eight townhouses are configured across ground and first floors, bringing the total to 500 apartments. The residences are designed around contemporary minimalism, using earthy hues, organic textures and tranquil tones. Private balconies form part of every residence and face Dubai Hillside Park. The project began on 30 June 2025 and is scheduled for completion on 31 May 2029.
The available home types at Vida Residences Hillside are 1-bedroom, 2-bedroom and 3-bedroom apartments, alongside 3-bedroom townhouses. Each residence includes a private balcony with views towards Dubai Hillside Park. The apartment component is distributed between the two residential towers, while the townhouse collection consists of eight ground-plus-one homes. This creates a choice between apartment layouts in the towers and 3-bedroom townhouse accommodation within the same development. Vida Residences Hillside has 500 apartments in total: 184 in Tower A, 308 in Tower B and eight townhouses. The project is located in Dubai Hills Estate, a destination with Dubai Hills Park, Dubai Hills Mall and Dubai Hills Golf Club among its named facilities.
Hillside Park is a central feature of Vida Residences Hillside. Its facilities include a multipurpose lawn, Zen Gardens, fitness zones, a putting green, rope course, skate and pump track, kids’ play zones, BBQ and picnic areas, and a dog park. The development also includes Veo Fitness, fitness classes and wellness experiences. Veo Fitness brings training facilities, fitness classes and wellness experiences into the community. The combination of active and recreational spaces gives residents dedicated settings for exercise, outdoor recreation, children’s play and social gatherings. Dubai Hills Park is also part of the wider destination, adding another named park facility within Dubai Hills Estate.
Vida Residences Hillside is situated in Dubai Hills Estate. The destination includes Dubai Hills Park, Dubai Hills Mall, Dubai Hills Golf Club, gourmet restaurants and artisan cafés, international schools and nurseries, and healthcare facilities. Dubai Hills Golf Club features an 18-hole championship golf course. Dubai Hills Park is 0.8 km away, while Dubai Hills Golf Club is 1.6 km away. The Storm Coaster is 1.7 km from the development. Cinema Akil at Alserkal Avenue is 4.1 km away, and Mall of the Emirates venues include Vox Cinemas at 5.2 km, Yalla Bowling at 5.3 km and Ski Dubai at 5.3 km. Dubai Science Park Community Park is 4.4 km away.
Vida Residences Hillside has stated travel times of 10 minutes to Downtown Dubai and 10 minutes to Dubai Marina. Dubai International Airport is stated at 15 minutes, while Al Maktoum International Airport is stated at 25 minutes. Within the surrounding area, Dubai Hills Park is 0.8 km away and Dubai Hills Golf Club is 1.6 km away. Other nearby golf facilities include Arabian Ranches Golf Club at 7.1 km and The Track Meydan Golf at 8.1 km. Dubai Science Park South Park is 4.9 km away. The location places the development within the Dubai Hills Estate destination, alongside its park, mall, golf club, schools, nurseries, restaurants, cafés and healthcare facilities.
Prices for Vida Residences Hillside start from AED 2,853,888. The project is active and had reached a recorded completion ratio of 10.00% on 4 May 2026. Construction began on 30 June 2025, and completion is scheduled for 31 May 2029. Vida Residences Hillside contains 500 apartments in total. Tower A contains 184 units, Tower B contains 308 units, and the townhouse component contains eight 3-bedroom homes. Payment-plan information is available on request. The development’s residential offering comprises 1-bedroom, 2-bedroom and 3-bedroom apartments, plus 3-bedroom townhouses.
Vida Residences Hillside is developed by Emaar Properties, founded in 1997. Emaar Properties reported a market capitalisation of AED 114 billion for FY 2024, revenue of AED 35.5 billion and net profit of AED 17.5 billion for FY 2024. The company states that it has delivered more than 118,400 residential units globally and has 50,500 residential units under development. Its stated global market presence covers more than 10 markets. At Vida Residences Hillside, Emaar Properties is delivering a 500-apartment project in Dubai Hills Estate, comprising two residential towers and eight townhouses, with scheduled completion on 31 May 2029.
Resale prices in this area: Dubai Hills Estate Apartments: Resale Market Report H1 2026 — 402 DLD resale deals, median AED 2,361/sq ft.
Compare with other projects under construction: all off-plan projects in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 36 completed buildings in Dubai Hills Estate for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in Vida Residences Hillside between 18 Mar 2026 and 17 Nov 2026: median 26 623 AED/m² (2 473 AED/sq ft); half of the deals fell between 26 066 and 28 231 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| 1 BR | AED 1 875 000 | 27 | 27 457 | 68.3 |
| 2 BR | AED 3 200 000 | 8 | 26 274 | 121.8 |
| 3 BR | AED 4 455 000 | 15 | 26 250 | 169.7 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai Hills Estate: new projects and prices
30 projects · prices from DLD and developers
Park Field Building 2 Dubai Hills Estate · 1–3 BR
from AED 1,064,888
Mallside Residences Dubai Hills Estate
from AED 1,072,579
Mallside Residence Dubai Hills Estate · Studio, 1–3 BR
from AED 1,169,000
27 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
441 of 500 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 453 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Vida Residences Hillside — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-19, https://continentalclub.ae/project/vida-residences-hillside-dubai-hills-estate/