Developer: Danube Properties · Dubai Silicon Oasis
Timez by Danube is a residential project by Danube Properties in Dubai Silicon Oasis, Dubai, with prices from AED 800 000, handover Q2 2028, construction 21.5% complete per the DLD registry, 1142 units, 1 147 DLD-registered sales since 2013.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
| Type | Size, sq.ft |
|---|---|
| Studio | 386–427 |
| 1 Bedroom | 545–721 |
| 2 Bedroom | 800–1 097 |
| 3 Bedroom | 1 057–1 418 |
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 800 000 AED is 3 378 AED.
Estimates only; not a bank approval.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 07.10.2026 09:55).
Pace: 1.66% per month. At this rate 100% falls on 15.08.2030.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
31 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Danube Properties · District: Dubai Silicon Oasis
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 24.09.2026 | 1 BR | 50.6 | 1 177 000 |
| 24.09.2026 | 3 BR | 131.6 | 2 300 000 |
| 17.09.2026 | Studio | 18.0 | 424 882 |
| 14.09.2026 | 1 BR | 50.9 | 1 187 000 |
| 10.09.2026 | 2 BR | 79.3 | 1 642 000 |
| 07.09.2026 | Studio | 35.9 | 899 000 |
| 03.09.2026 | 2 BR | 79.3 | 1 662 000 |
| 31.08.2026 | Studio | 36.0 | 844 800 |
| 31.08.2026 | Studio | 38.6 | 855 000 |
| 27.08.2026 | 2 BR | 79.2 | 1 619 351 |
| 21.08.2026 | 3 BR | 129.3 | 2 286 000 |
| 17.08.2026 | Studio | 35.9 | 880 000 |
| 17.08.2026 | 1 BR | 54.7 | 1 249 000 |
| 17.08.2026 | 2 BR | 79.3 | 1 659 000 |
| 07.08.2026 | 2 BR | 79.3 | 1 657 000 |
| 06.08.2026 | 2 BR | 79.3 | 1 660 000 |
| 05.08.2026 | 2 BR | 79.2 | 1 516 970 |
| 27.07.2026 | 2 BR | 78.6 | 1 400 080 |
| 22.07.2026 | 2 BR | 77.3 | 1 487 700 |
| 21.07.2026 | 2 BR | 78.6 | 1 624 000 |
Dubai Land Department transaction registry, updated 06.10.2026. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +8% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 39 | 841 820 | 21 585 | 446 |
| 1 bedroom | 55 | 1 159 000 | 21 073 | 463 |
| 2 bedrooms | 78 | 1 561 140 | 20 015 | 200 |
| 3 bedrooms | 129 | 2 159 850 | 16 743 | 32 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
DLD has recorded 1 147 sales in this building since 2013, 2 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

Timez by Danube is an active high-rise residential project by Danube Properties in Dubai Silicon Oasis. Construction began on 1 April 2025 and had reached 17.06% completion, with completion dated 31 July 2028. The development is planned as one multi-use building with residential accommodation and lifestyle facilities.
Timez by Danube occupies plot 095-25 in Dubai Silicon Oasis. The registered building configuration comprises one basement, a ground floor, three podium levels, 38 floors and a roof. Its exterior is presented with large glass window panes, balconies and a geometric façade. The development combines residential accommodation with shared amenity areas across the building. Danube Properties presents the homes as furnished residences and focuses on convertible layouts intended to adapt between living arrangements. Selected apartments are offered with private pools. The project is located in a district that combines residential, office, industrial and commercial uses, with Dubai Silicon Oasis positioned at the junction of Sheikh Mohammed Bin Zayed Road and Al Ain Road.
The apartment collection includes studios and one-, two- and three-bedroom homes. A defining feature is the convertible apartment concept: selected layouts are designed to transform from a studio into a one-bedroom configuration. This approach is presented as a flexible arrangement for changing household needs. Interiors are described with fitted cabinetry, kitchen countertops and furnished living spaces. Private pools are a feature of selected apartments rather than the entire collection. The development also promotes freehold ownership. Timez by Danube is a single-building project, with its residential floors positioned above the basement, ground floor and three podium levels. The building’s 38 upper floors and roof form the registered structure for the development.
Timez by Danube lists more than 40 resident amenities. Water-focused facilities include an infinity anti-current pool, shallow pool, Jacuzzi, aquatic gym, splash pad, rain shower and pool deck. Wellness and exercise spaces include indoor and outdoor gyms, a yoga deck, spa and therapy facilities, a joggers arena, karate and Zumba area, and a kickboxing ring. The leisure programme also includes an open-air cinema, library, business centre, indoor and outdoor party areas, cabana seating, barbecue area, family seating and an open cigar zone. For children, the amenity list includes Kid’s Oasiz, a play area, daycare, wall climbing, trampoline and sand pit. Sports and games facilities include padel, basketball, badminton, cricket, mini golf, chess, table tennis and snooker.
Timez by Danube is in Dubai Silicon Oasis, a technology-focused mixed-use district with business, industrial and residential areas. Central Park and Al Ain–Dubai Road are each listed at two minutes from the project, while Silicon Central Mall and a proposed metro station are listed at three minutes. Sheikh Mohammed Bin Zayed Road is listed at four minutes, followed by DSO HQ at five minutes and DSO Lake at seven minutes. DSO–RIT Sports Campus is listed at eight minutes and Academic City at 10 minutes. Further listed destinations include Global Village at 11 minutes, Dubai Safari Park at 12 minutes, Dubai Creek Harbour at 13 minutes, Dubai Design District at 14 minutes, Burj Khalifa at 15 minutes and Dubai Mall at 20 minutes.
Prices for Timez by Danube start from AED 800,000. The payment plan begins with a 10% down payment on booking. A further 59% is scheduled during construction across the first to 37th instalments. The plan assigns 1% at handover, stated at 100% completion, followed by 30% post-handover within 30 months. The project is marketed with a 1% monthly payment-plan header. Construction started on 1 April 2025. The current construction status is active, and the recorded completion ratio is 17.06%. The stated project completion date is 31 July 2028. Buyers considering the payment structure can assess the booking contribution, construction-stage instalments, handover payment and post-handover balance as separate stages of the plan.
Danube Properties is the developer of Timez by Danube. The company is developing the project in Dubai Silicon Oasis as a high-rise residential building with convertible apartments, furnished homes and a broad shared-amenity programme. The development’s advertised features include studio-to-one-bedroom conversion in designated apartment layouts, private pools in selected apartments, and more than 40 amenities. Danube Properties also presents the project with a monthly-payment-plan structure, beginning with a 10% booking payment and continuing through construction, handover and a 30-month post-handover period. Timez by Danube is scheduled for completion on 31 July 2028.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 57 completed buildings in Dubai Silicon Oasis for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Timez by Danube — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/timez-by-danube-dubai-silicon-oasis/