Developer: Uniestate Properties · Dubai Silicon Oasis
Oasis Lofts is a residential project by Uniestate Properties in Dubai Silicon Oasis, Dubai, with prices from AED 645 000, planned handover 30.09.2026, construction 50.1% complete per the DLD registry, 162 apartments (+2 non-residential units), 6 sold to first buyers per the DLD register (as of 25 Nov 2026).
· DLD data as of 25 Nov
| Type | Size, sq.ft |
|---|---|
| Studio | 397–814 |
| 1 Bedroom | 750–967 |
| 2 Bedroom | 1 347 |
Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: Studio — ~46 sq.ft (4.3 m²); 1 Bedroom — ~208 sq.ft (19 m²); 2 Bedroom — ~321 sq.ft (30 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
≈160 of 162 apartments availableestimate
Sold to first buyers 6 (4%)Available ≈160
| Type | Total | Sold | Available |
|---|---|---|---|
| Studios | 117 | 6 | 111 |
| 1 bedroom | 36 | 0 | 36 |
| 2 bedrooms | 9 | 0 | 9 |
| Total | 162 | 6 | 156 |
Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.
Tap an apartment type in the table to add it to your request.
“Available” means units without a registered sale; resales are excluded; this is an estimate. Non-residential units (2) are not included.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2026 →
Data from the Dubai Land Department project registry (updated 27.11.2026 05:55).
Pace: 3.51% per month. At this rate 100% falls on 14.08.2027.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
84 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Uniestate Properties · District: Dubai Silicon Oasis
Planned handover of Oasis Lofts: 30.09.2026. Before you sign the handover form we check 110 points, send a photo report within 24 hours and file the defect list with the developer. Fixed price from 749 AED.
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +7% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 38 | 542 441 | 14 275 | 122 |
| 1 bedroom | 76 | 909 688 | 11 970 | 37 |
| 2 bedrooms | 125 | 1 382 947 | 11 064 | 9 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 13.10.2026 | Studio | 37.9 | 664 946 |
| 21.09.2026 | Studio | 37.2 | 536 970 |
| 23.04.2026 | 1 BR | 87.3 | 1 170 000 |
| 20.04.2026 | Studio | 37.2 | 620 000 |
| 17.04.2026 | Studio | 37.8 | 582 911 |
| 12.03.2026 | Studio | 37.9 | 525 843 |
| 04.02.2026 | 1 BR | 75.6 | 943 580 |
| 03.02.2026 | Studio | 37.7 | 538 362 |
| 16.01.2026 | 1 BR | 67.2 | 1 164 400 |
| 21.11.2025 | Studio | 38.0 | 610 353 |
| 18.11.2025 | 1 BR | 69.8 | 1 181 344 |
| 18.11.2025 | 1 BR | 69.8 | 1 134 090 |
| 12.11.2025 | Studio | 36.9 | 662 124 |
| 06.11.2025 | 1 BR | 69.8 | 567 045 |
| 04.11.2025 | Studio | 37.8 | 560 000 |
| 24.10.2025 | 1 BR | 89.9 | 1 077 320 |
| 22.10.2025 | 1 BR | 67.2 | 909 688 |
| 06.10.2025 | Studio | 37.9 | 664 946 |
| 29.09.2025 | 2 BR | 125.2 | 1 382 947 |
| 23.09.2025 | Studio | 48.3 | 633 246 |
| 23.09.2025 | Studio | 37.8 | 604 719 |
| 19.09.2025 | 1 BR | 87.3 | 991 547 |
| 18.09.2025 | Studio | 37.6 | 661 700 |
| 17.09.2025 | Studio | 37.7 | 672 953 |
| 17.09.2025 | Studio | 37.9 | 657 303 |
| 16.09.2025 | Studio | 38.0 | 670 311 |
| 12.09.2025 | 1 BR | 71.8 | 852 470 |
| 28.08.2025 | Studio | 37.2 | 536 970 |
| 28.08.2025 | Studio | 37.8 | 664 946 |
| 27.08.2025 | Studio | 38.0 | 533 975 |
| 19.08.2025 | Studio | 37.6 | 525 288 |
| 19.08.2025 | Studio | 37.7 | 675 502 |
| 19.08.2025 | Studio | 38.0 | 672 869 |
| 18.08.2025 | Studio | 37.9 | 529 919 |
| 18.08.2025 | Studio | 37.9 | 525 843 |
| 15.08.2025 | 1 BR | 75.6 | 898 648 |
| 14.08.2025 | Studio | 38.0 | 671 375 |
| 13.08.2025 | Studio | 38.0 | 672 869 |
| 13.08.2025 | Studio | 37.7 | 672 953 |
| 13.08.2025 | Studio | 38.0 | 533 000 |
| 08.08.2025 | 1 BR | 67.2 | 909 688 |
| 07.08.2025 | 2 BR | 125.2 | 1 452 094 |
| 30.07.2025 | Studio | 36.9 | 657 146 |
| 29.07.2025 | Studio | 37.7 | 542 441 |
| 28.07.2025 | Studio | 48.3 | 788 300 |
| 28.07.2025 | Studio | 37.2 | 592 895 |
| 28.07.2025 | Studio | 38.0 | 533 000 |
| 25.07.2025 | Studio | 37.7 | 538 072 |
| 24.07.2025 | Studio | 37.2 | 592 900 |
| 24.07.2025 | Studio | 37.9 | 664 946 |
Dubai Land Department transaction registry, updated 26.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 645 000 AED is 2 724 AED.
Estimates only; not a bank approval.


Boniface Anyange
Broker · Continental Club Property · RERA ORN 31933
Answers questions about Oasis Lofts: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
Oasis Lofts is a one-building apartment development by Uniestate Properties in Dubai Silicon Oasis. It comprises 162 apartments (+2 non-residential units) and is recorded as active, with construction 50.08% complete as of 8 June 2026. The recorded project completion date is 30 September 2026.
Oasis Lofts is planned as a residential building in Dubai Silicon Oasis with 162 apartments (+2 non-residential units). The building configuration comprises a basement, ground floor, two podium levels, nine typical floors and roof floors. Its specified construction includes a concrete structure, blockwork, and internal and external finishes. The project started on 1 October 2024 and has a completion date of 30 September 2026. Construction progress was recorded at 50.08% on 8 June 2026, and the project status is active. Oasis Lofts is located in a mixed-use district that includes residential, office, industrial and commercial uses.
The apartment collection includes studios, one-bedroom apartments and two-bedroom apartments. Studios are listed from AED 645,000, with areas from 397 to 520 sq ft. One-bedroom apartments are listed from AED 1,130,000 and range from 750 to 967 sq ft. Two-bedroom apartments are listed from AED 1,690,000, with areas from 1,346 to 1,347 sq ft. The project’s starting price is AED 645,000. The residences are described as incorporating smart-home technology, fully equipped kitchens and high-end finishes. European-branded kitchen appliances are specified for the apartments.
A pool area is included at Oasis Lofts for relaxation and social gatherings. The facilities described for the development also include an adults’ swimming pool, a children’s pool, a gymnasium, a children’s play area, a barbecue deck and an open-air cinema. Retail options are planned at ground level. The amenity offering further includes dining outlets, restaurants, retail outlets, a supermarket, healthcare facilities, parks and leisure areas. These facilities are intended to provide spaces for fitness, swimming, children’s recreation, dining, shopping and social activity within the development’s setting.
Oasis Lofts is in Dubai Silicon Oasis, a technology-focused free zone and mixed-use community positioned at the junction of Sheikh Mohammad Bin Zayed Road, E311, and Al Ain Road, E66. The district combines offices, industrial facilities and homes, with a central lake and running track. The project is described as being close to schools, universities and healthcare facilities. Academic City is listed 5 minutes away, while Dubai International Airport is listed 15 minutes away. Dubai Silicon Oasis is adjacent to Academic City, and road connections are a principal means of transport within the district.
Silicon Towers Park is 0.7 km from Oasis Lofts. Silicon Oasis Lake Park is 1.4 km away, and Liwan Playground is 1.5 km away. IMG Worlds of Adventure is 6.9 km from the project, while Global Village is 8.9 km away and Ras Al Khor Wildlife Sanctuary is 9.0 km away. The Track Meydan Golf is 7.7 km away, Al Badia Golf Club is 10.5 km away, and Dubai Hills Golf Club is 11.0 km away. Novo Cinema at IMG Worlds of Adventure is 6.9 km away, and Novo Cinema at Dragon Mall is 7.2 km away.
Oasis Lofts is offered with a 40/60 payment plan. Forty percent is payable during construction through instalments, while the remaining 60% is payable post-handover within 60 months. The plan is described as extending for five years after handover. The project started on 1 October 2024. Its completion date is 30 September 2026, with construction recorded at 50.08% complete on 8 June 2026. Buyers considering the payment schedule can assess the construction-stage portion separately from the 60-month post-handover portion.
Oasis Lofts is developed by Uniestate Properties. The company presents the project as a residential development in Dubai Silicon Oasis with studios, one-bedroom apartments and two-bedroom apartments. The development is positioned around connected living in a district with educational institutions, healthcare facilities, parks and commercial activity. Its residential specification includes smart-home systems and equipped kitchens, while the shared facilities include pool areas, a gymnasium, children’s recreation spaces, a barbecue area and an open-air cinema. The project contains 162 apartments (+2 non-residential units) in one building.
Resale prices in this area: Dubai Silicon Oasis Apartments: Resale Market Report H1 2026 — 452 DLD resale deals, median AED 947/sq ft.
Compare with other projects under construction: off-plan property in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.
Check the charge for a specific building →
Median across 57 completed buildings in Dubai Silicon Oasis for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.
Based on 50 registered DLD sales in Oasis Lofts between 24 Jul 2025 and 13 Oct 2026: median 15 126 AED/m² (1 405 AED/sq ft); half of the deals fell between 13 860 and 17 526 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| Studio | AED 606 000 | 36 | 16 032 | 37.8 |
| 1 BR | AED 916 000 | 12 | 12 938 | 70.8 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Dubai Silicon Oasis: new projects and prices
18 projects · prices from DLD and developers
Andi Aura Dubai Silicon Oasis
from AED 523,871
Tria by Deyaar Dubai Silicon Oasis · 1–3 BR
from AED 538,314
Serenova Dubai Silicon Oasis · Studio, 2–4 BR
from AED 644,000
15 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
6 of 162 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 171 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Oasis Lofts — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-14, https://continentalclub.ae/project/oasis-lofts-dubai-silicon-oasis/