Tavora Residences By Jhk Heights Real Estate Development

Gallery

On map

Tavora Residences By Jhk Heights Real Estate Development is a residential project by Jhk Heights Real Estate Development in International City 2, Dubai, with handover 15.12.2026, construction 61.5% complete per the DLD registry.

Construction61.5%

Construction progress

61.49%
  • Handover15.12.2026
  • Status date12.05.2026
  • DLD project number3825

Data from the Dubai Land Department project registry (updated 10.08.2026 09:55).

Construction progress 20
12 May 2026 61.49%
Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 1 of 7Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 2 of 7Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 3 of 7Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 4 of 7Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 5 of 7Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 6 of 7Tavora Residences By Jhk Heights Real Estate Development, International City 2 construction progress — 12 May 2026, 61.49% complete, photo 7 of 7

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
17.02.2026Studio32.7499 777
08.01.20262 BR103.11 194 777
22.12.2025Studio38.6564 777
04.12.20251 BR70.6801 003
14.11.20251 BR70.6815 777
06.11.20252 BR100.01 251 777
05.11.2025Studio36.1560 777
30.10.20251 BR75.6790 825
21.10.20251 BR78.2796 585
16.10.20251 BR70.5782 185
14.10.20251 BR64.9815 777
14.10.2025Studio36.8572 777
14.10.20251 BR76.8798 093
13.10.20251 BR70.6815 777
13.10.20251 BR71.7827 777
13.10.20252 BR121.71 222 953
09.10.2025Studio36.6520 777
09.10.2025Studio38.3551 521
01.10.20251 BR58.8749 777
29.09.2025Studio36.1560 777

Dubai Land Department transaction registry, updated 2026-08-10. Explore Dubai property transactions →

About the project

Tavora Residences is a 95-unit residential building by Jhk Heights Real Estate Development in International City 2, within Dubai’s Warsan 4 area. The project is active, with construction recorded at 61.49% at the inspection dated 12 May 2026. Its recorded completion date is 15 December 2026.

The building and project scale

Tavora Residences is planned as one residential building with an underground level, ground floor, one podium level, four residential floors and a roof. The building configuration is recorded as UG / G + 1P + 4 Floor + Roof. A swimming pool is positioned on the first floor. The development contains 95 units within a total recorded project area of 5,936.70. The project began on 5 September 2024 and is designed as a mid-rise addition to the residential areas of International City 2, where low- and mid-rise buildings form much of the surrounding urban pattern.

Construction status and completion date

Tavora Residences holds active project status. The latest inspection dated 12 May 2026 recorded a completion ratio of 61.49%. The recorded project start date is 5 September 2024, and the scheduled completion date is 15 December 2026. The development is registered as a single building with 95 units. These milestones place the project within the continuing construction phase of International City 2, a district where residential buildings, infrastructure and public-realm elements are being delivered in stages.

International City 2 setting

Tavora Residences is located in International City 2, a planned extension of Nakheel’s International City in Warsan 4. The district covers 731 hectares and incorporates the areas commonly known as Phase 2 and Phase 3. Emirates Road forms its western boundary, Academic City lies to the east, Dubai Silicon Oasis is to the south and International City 1 is to the north. The International City 2 masterplan places taller towers in a central circular area, with low- and mid-rise residential neighbourhoods surrounding it. Private developers hold individual land parcels, creating varied architectural styles across the area rather than a uniform building format.

Road access and city destinations

International City 2 is positioned between Emirates Road, Academic City, Dubai Silicon Oasis and International City 1. Typical driving times from the district are 21 minutes to Dubai Mall, 31 minutes to Palm Jumeirah, 29 minutes to Burj Al Arab, 34 minutes to The Walk at JBR, 15 minutes to Dubai International Airport and 38 minutes to Al Maktoum International Airport. The nearest Dubai Metro station is on the Red Line, at a distance of 9,071 metres from the district. A Blue Line route and station are planned for the corridor between Phase 2 and Phase 3.

The wider neighbourhood plan

International City 2 is organised into five character zones. District Centre is planned as a mixed-use area with mid-rise offices, retail buildings and active street frontages. The Ramblas is planned as a pedestrianised spine with mixed-use buildings, ground-floor retail and residential or office space above. Residential Clusters are planned to include shops, health services, offices and food-and-beverage outlets. Open Space areas are planned for district parks, community parks, playgrounds, plazas, schools and nurseries. International City Phase 3 is a residential sector focused on mid-rise apartment buildings. Roads and pavements are substantially in place across the district, while landscaping, greenery and public open spaces are being established through the staged masterplan.

Developer and district development

Jhk Heights Real Estate Development is the developer of Tavora Residences. The project sits within International City 2, which forms part of Nakheel’s International City programme. District infrastructure works include roads, district cooling, power and communications networks, water distribution, sewerage, fire services and irrigation. A AED 250 million infrastructure contract was awarded for these works, with an 11-month programme. The neighbourhood has a small number of grocery and retail outlets in operation, while additional plots continue to be developed by private developers. Tavora Residences is one of the residential projects under construction in this evolving part of Warsan 4.

Registered transactions in Tavora Residences By Jhk Heights Real Estate Development

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

94deals since 2025
12 357AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio36560 77715 57738
1 bedroom72804 88411 17940
2 bedrooms1001 194 77711 94816

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

FAQ

Who is the developer of Tavora Residences?
Tavora Residences is developed by Jhk Heights Real Estate Development.
Where is Tavora Residences located?
The project is in International City 2, within Dubai’s Warsan 4 area.
How many units are in Tavora Residences?
Tavora Residences contains 95 units in one residential building.
What is the construction status of Tavora Residences?
The project is active. Its completion ratio was recorded at 61.49% at the inspection dated 12 May 2026.
When is Tavora Residences scheduled for completion?
The recorded completion date is 15 December 2026.
What is the building configuration at Tavora Residences?
The building includes an underground level, ground floor, one podium level, four floors and a roof.
Does Tavora Residences have a swimming pool?
A swimming pool is recorded on the first floor of the building.
How far is Dubai International Airport from International City 2?
Typical driving time from International City 2 to Dubai International Airport is 15 minutes.
Is there a Metro station near International City 2?
The nearest Dubai Metro station is on the Red Line, 9,071 metres from the district. A Blue Line route and station are planned between Phase 2 and Phase 3.
How can I buy an apartment in Tavora Residences By Jhk Heights Real Estate Development?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request