Stellar Axis By Ajmal Estate Developers is a residential project by Ajmal Estate Developers in International City 2, Dubai, with handover 01.10.2026, construction 15.2% complete per the DLD registry.

Construction15.2%

Construction progress

15.17%
  • Handover01.10.2026
  • Status date08.05.2026
  • DLD project number4063

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 7
8 May 2026 15.17%
Stellar Axis By Ajmal Estate Developers, International City 2 construction progress — 8 May 2026, 15.17% complete, photo 1 of 5Stellar Axis By Ajmal Estate Developers, International City 2 construction progress — 8 May 2026, 15.17% complete, photo 2 of 5Stellar Axis By Ajmal Estate Developers, International City 2 construction progress — 8 May 2026, 15.17% complete, photo 3 of 5Stellar Axis By Ajmal Estate Developers, International City 2 construction progress — 8 May 2026, 15.17% complete, photo 4 of 5Stellar Axis By Ajmal Estate Developers, International City 2 construction progress — 8 May 2026, 15.17% complete, photo 5 of 5

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
06.07.2026Studio45.5538 857
06.07.2026Studio44.1531 861
26.06.20261 BR72.5739 417
04.06.2026Studio43.7531 157
21.05.20261 BR74.5775 050
20.05.2026Studio45.5538 857
06.05.2026Studio44.8531 146
05.05.2026Studio44.8525 834
30.04.2026Studio44.9540 628
29.04.20262 BR122.31 247 056
29.04.2026Studio44.1535 000
29.04.20262 BR122.31 247 056
28.04.2026Studio44.9459 534
27.04.2026Studio44.8531 146
24.04.20261 BR74.5908 270
22.04.20262 BR122.31 247 056
20.04.2026Studio44.8531 146
16.04.20262 BR122.31 247 056

Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →

About the project

Stellar Axis By Ajmal Estate Developers is a 122-unit residential development by Ajmal Estate Developers in International City 2, within Dubai’s Warsan Fourth area. The building is configured as G+2P+7 residential floors. The project is active, with a recorded completion ratio of 15.17% and a scheduled completion date of 1 October 2026.

The project

Stellar Axis is planned as a residential building with a G+2P+7 configuration: ground level, two podium levels and seven residential floors. The development has 122 total units and a total project area of 8,172.13. Construction started on 1 July 2025, and the project is scheduled for completion on 1 October 2026. Ajmal Estate Developers is the developer of Stellar Axis. The project sits in International City 2, a planned extension of International City in the Warsan 4 area of Dubai.

International City 2 setting

International City 2 covers 731 hectares and incorporates the areas commonly known as Phase 2 and Phase 3. It is bounded by Emirates Road to the west, Academic City to the east, Dubai Silicon Oasis to the south and International City 1 to the north. A high-voltage power reservation corridor separates the district from International City 1 along its northern edge. The district is in an early stage of development, with mid- and low-rise residential neighbourhoods, newly released land parcels and a central zone designated for taller towers. Roads and pavements are substantially in place across the area, while public open spaces and landscaping are being established as the masterplan progresses.

Neighbourhood structure and planned uses

The International City 2 masterplan places a central high-rise circle among low- and mid-rise neighbourhoods. International City Phase 3 is focused on mid-rise apartment buildings, while the area rebranded as Greenview was redesigned for townhouses and villas. Private developers acquired land parcels across the district, creating a varied architectural character rather than a uniform building style. The masterplan includes a District Centre with mid-rise offices, retail buildings and active street frontages. The Ramblas is planned as a pedestrianised spine with mixed-use buildings, ground-floor retail and residential or office space above. Residential clusters are planned with shops, health services, offices and food-and-beverage outlets, alongside district parks, community parks, playgrounds, plazas, schools and nurseries.

Road access and travel times

International City 2 is positioned between Emirates Road, Academic City, Dubai Silicon Oasis and International City 1. Typical driving times from the district are 21 minutes to Dubai Mall, 31 minutes to Palm Jumeirah, 29 minutes to Burj Al Arab, 34 minutes to The Walk at JBR, 15 minutes to Dubai International Airport and 38 minutes to Al Maktoum International Airport. The nearest Dubai Metro station is on the Red Line, 9,071 metres from the district. A Blue Line metro route and station are planned for the corridor between Phase 2 and Phase 3. Dubai Silicon Oasis is immediately adjacent to the district, although there is currently no direct transport connection between the two areas.

Infrastructure and local development

International City 2 forms part of Nakheel’s International City programme. Infrastructure works in the district include roads, district cooling, power and communications networks, water distribution, sewerage, fire services and irrigation. Basic infrastructure is in place, with a small number of grocery and retail outlets operating in the area. The district’s public realm is being delivered in stages, including open-space areas, community facilities and landscaped elements. On-street parking is common on sand curbs and undeveloped plots between buildings. The wider area includes private residential projects such as Zyra Hills, Sports View Residence, 4B Living, Moonsa Residences 2, Moonsa Residences, Elevia Residences 3, Elevia Residences and Dar Al Aiham One.

Construction progress and completion

Stellar Axis began construction on 1 July 2025. Its latest inspection was dated 8 May 2026, when the recorded completion ratio was 15.17%. The project is active and has a scheduled completion date of 1 October 2026. The building’s planned form is G+2P+7 residential floors, with 122 total units across a project area of 8,172.13. Ajmal Estate Developers is developing the project in International City 2, within Warsan Fourth.

FAQ

Who is the developer of Stellar Axis?
Stellar Axis is being developed by Ajmal Estate Developers.
Where is Stellar Axis located?
Stellar Axis is located in International City 2, within Dubai’s Warsan Fourth area.
How many units are in Stellar Axis?
The development has 122 total units.
What is the building configuration of Stellar Axis?
Stellar Axis is planned as a G+2P+7 residential building.
When is Stellar Axis scheduled for completion?
The scheduled completion date is 1 October 2026.
What is the construction status of Stellar Axis?
The project is active. Its recorded completion ratio was 15.17% at the inspection dated 8 May 2026.
What is near International City 2?
International City 2 is bordered by Emirates Road, Academic City, Dubai Silicon Oasis and International City 1. Typical driving time to Dubai International Airport is 15 minutes.
Is there a Metro station near Stellar Axis?
The nearest Dubai Metro station is on the Red Line, 9,071 metres from International City 2. A Blue Line route and station are planned for the corridor between Phase 2 and Phase 3.