Developer: H M K Real Estate Development · Nad Al Sheba 1
Queen’S Garden is a residential project by Future Art Engineering Consultancy in Nad Al Sheba 1, Dubai, with handover Q3 2026, construction 42.2% complete per the DLD registry, 77 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
All Dubai projects handing over in 2026 →
Data from the Dubai Land Department project registry (updated 22.09.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Future Art Engineering Consultancy · District: Nad Al Sheba 1
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 11.06.2026 | 2 BR | 105.6 | 2 050 000 |
| 21.04.2026 | 2 BR | 90.4 | 1 780 782 |
| 20.04.2026 | 1 BR | 77.5 | 1 540 852 |
| 17.04.2026 | 3 BR | 189.7 | 3 456 618 |
| 13.04.2026 | 2 BR | 105.6 | 2 178 156 |
| 10.04.2026 | 1 BR | 77.6 | 1 599 793 |
| 17.03.2026 | 2 BR | 105.7 | 2 102 879 |
| 09.03.2026 | 2 BR | 105.6 | 2 275 000 |
Dubai Land Department transaction registry, updated 2026-09-20. Explore Dubai property transactions →

Queen’S Garden is a 77-unit luxury flats project by H M K Real Estate Development in Nad Al Sheba 1. The building is configured as ground level, two parking levels, six residential floors and a roof level. The project is active, with construction recorded at 42.22% completion at the inspection dated 23 April 2026 and a completion date of 1 August 2026.
Queen’S Garden has a total project area of 8,589.96 and contains 77 units. Its registered building configuration is G+P1+P2+6+Roof: a ground floor, two parking floors, six floors and a roof level. The project is described as luxury flats, placing its residential offering within a single mid-rise building format rather than a multi-building development. Construction began on 23 July 2024. The combination of two dedicated parking levels and six upper floors defines the project’s physical structure in Nad Al Sheba 1.
The development comprises 77 residences described as luxury flats. Queen’S Garden is located in Nad Al Sheba 1, a sub-community within the wider Nad Al Sheba area on the eastern edge of Mohammed Bin Rashid City, near Meydan. The surrounding district includes low- to mid-rise residential areas, villas and residential compounds, alongside local roads connecting the community with central Dubai and major arterial routes. Queen’S Garden’s 8,589.96 total project area and 77-unit count provide the recorded scale of the development.
Queen’S Garden is currently classified as active. Its construction completion ratio was 42.22% at the inspection conducted on 23 April 2026. The project commencement date is 23 July 2024, and its stated completion date is 1 August 2026. The construction information was updated on 1 May 2026. These dates establish the recorded development timetable from the start of construction through to the scheduled completion date.
Queen’S Garden is in Nad Al Sheba 1, close to the Meydan and Mohammed Bin Rashid City corridors. Burj Khalifa and Downtown Dubai are 5.5 km from the community, while Dubai Mall is 5.2 km away and Business Bay is 5.3 km away. DIFC is 6.5 km from Nad Al Sheba 1. Other listed destinations include Global Village at 9.9 km, Mall of the Emirates at 11.8 km, Dubai International Airport at 11.9 km and Palm Jumeirah at 17.9 km. Dubai Marina is 19.1 km away, JBR Beach is 19.8 km away, Expo City Dubai is 27.3 km away and Al Maktoum International Airport is 32.8 km away.
Nad Al Sheba 1 includes the Nad Al Sheba Cycle Path, with 8 km, 6 km and 4 km routes for cycling and running. The path has night lighting, restrooms, changing rooms, showers and lockers. The locality also contains a women-focused fitness SuperClub in a 21,000-square-foot facility with boutique studios, recovery amenities and wellness programming. Rashid and Latifa Schools are listed at 0.6 km from the sub-community, while the Bilingual French International School is listed at 1.0 km. The nearest Red Line Metro station, identified as R26, is 6,042 metres from the community.
Queen’S Garden is being developed by H M K Real Estate Development. The developer is associated with the project’s 77-unit luxury flats scheme in Nad Al Sheba 1. Construction commenced on 23 July 2024, and the recorded completion date is 1 August 2026. As of the 23 April 2026 inspection, Queen’S Garden had reached 42.22% completion and retained active status.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Queen’S Garden — Continental Club Property, from Dubai Land Department registry and developer data, 2026-08-07, https://continentalclub.ae/project/queen-s-garden-nad-al-sheba-1/