Developer: Emaar Properties · Dubai Hills Estate

Park Point

Park Point is a residential project by Emaar Properties in Dubai Hills Estate, Dubai, with prices from AED 1 540 000, construction 100% complete per the DLD registry, 338 units, 552 DLD-registered sales since 2017.

Price fromAED 1 540 000Our calculation
Unit types1–3 BR574–1 658 sq.ftDeveloper supplied
StatusReadyDLD registry

· price from DLD deals

Prices, floor plans and payment

Layouts and sizes

TypeSize, sq.ft
1 BEDROOM - 1.0601–731
1 BEDROOM - 1.0.a670–730
1 BEDROOM - 1.0.b574–575
1 BEDROOM - 1.0.c603
1 BEDROOM - 1.0.d653–662
2 BEDROOM – 2.0953–973
2 BEDROOM – 2.0.a1 008–1 085
2 BEDROOM – 2.0.b1 016
2 BEDROOM – 2.11 242–1 242
2 BEDROOM – 2.1.a1 270–1 271
2 BEDROOM – 2.2866–876
2 BEDROOM – 2.2.a919
2 BEDROOM – 2.2.b928–929
2 BEDROOM – 2.31 041
2 BEDROOM – 2.4957–964
2 BEDROOM – 2.4.a1 015
2 BEDROOM – 2.51 136
2 BEDROOM – 2.5.a1 136
2 BEDROOM – 2.5.b1 227
2 BEDROOM – 2.6948–949
3 BEDROOM – 3.01 589
3 BEDROOM – 3.0.a1 658
3 BEDROOM – 3.0.b1 590
3 BEDROOM – 3.0.c1 491–1 502
3 BEDROOM – 3.0.d1 536
3 BEDROOM – 3.0.e1 536
3 BEDROOM – 3.0.f1 501
3 BEDROOM – 3.11 526
3 BEDROOM – 3.1.a1 526
3 BEDROOM – 3.21 299–1 303
3 BEDROOM – 3.2.a1 347
3 BEDROOM – 3.2.b1 398–1 398
3 BEDROOM – 3.31 208
3 BEDROOM – 3.3.a
3 BEDROOM – 3.41 487

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical balcony size: 1 Bedroom — ~71 sq.ft (6.6 m²); 2 Bedroom — ~67 sq.ft (6.2 m²); 3 Bedroom — ~84 sq.ft (7.8 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 540 000 AED is 6 503 AED.

Calculate mortgage

Estimates only; not a bank approval.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover and construction

Dubai Land Department registry and construction progress checks

Handover date & construction progress

100%
  • StatusReady
  • Construction started01.11.2016
  • HandoverReady To Move in
  • Status date03.02.2021
  • Escrow bankEmirates NBD
  • Scale5 bldg
  • DLD project number1812

Data from the Dubai Land Department project registry (updated 26.11.2026 05:55).

Inspection history 14
025507510007.06.201703.02.2021
Actual, per inspections
Construction progress 120
22.12.2020 98.80%
Park Point, Dubai Hills Estate construction progress — 22 December 2020, 98.80% complete, photo 1 of 2Park Point, Dubai Hills Estate construction progress — 22 December 2020, 98.80% complete, photo 2 of 2
31.08.2020 90.08%
Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 1 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 2 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 3 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 4 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 5 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 6 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 7 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 8 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 9 of 10Park Point, Dubai Hills Estate construction progress — 31 August 2020, 90.08% complete, photo 10 of 10
18.05.2020 82.79%
Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 1 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 2 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 3 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 4 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 5 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 6 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 7 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 8 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 9 of 10Park Point, Dubai Hills Estate construction progress — 18 May 2020, 82.79% complete, photo 10 of 10
27.01.2020 76.73%
Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 1 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 2 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 3 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 4 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 5 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 6 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 7 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 8 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 9 of 10Park Point, Dubai Hills Estate construction progress — 27 January 2020, 76.73% complete, photo 10 of 10
27.08.2019 61.19%
Park Point, Dubai Hills Estate construction progress — 27 August 2019, 61.19% complete, photo 1 of 4Park Point, Dubai Hills Estate construction progress — 27 August 2019, 61.19% complete, photo 2 of 4Park Point, Dubai Hills Estate construction progress — 27 August 2019, 61.19% complete, photo 3 of 4Park Point, Dubai Hills Estate construction progress — 27 August 2019, 61.19% complete, photo 4 of 4

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Buying a ready unit: pre-purchase inspection

Park Point is completed. Buying a ready unit here? Before you pay the deposit we check 110 points: finishes, plumbing, electrics and A/C, with a photo report within 24 hours. Fixed price from 749 AED.

Snagging inspection: prices and scope

Demand and transaction prices

Registered DLD transactions only — not listings

Registered transactions in Park Point

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

552deals since 2017
14 889AED per m², median
54%resale, the rest bought from the developer
+1%over the past year
6.2%gross rental yield

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved -2% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom64931 88814 561186
2 bedrooms951 440 88815 167211
3 bedrooms1472 198 41614 955155

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2022 to 2025 — +51% on the price per square metre in this building. The district moved +51% over the same period, so the building tracked the market.

14 2332017——
14 2032018——
14 4922019——
14 1482020——
14 76320218135.5%
15 05320228595.7%
17 71820231 0525.9%
21 41820241 3786.4%
22 78220251 4746.5%
23 8372026*1 3875.8%

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
25.11.20261 BR65.01 360 000
03.11.20262 BR86.61 700 000
28.10.20262 BR94.22 050 000
15.10.20262 BR81.22 100 000
01.10.20262 BR95.91 950 000
26.08.20261 BR64.71 300 000
30.07.20261 BR63.919 211
29.07.20261 BR63.649 376
27.07.20261 BR64.413 886
17.06.20262 BR94.11 950 000
06.05.20262 BR86.51 800 000
20.04.20262 BR128.03 100 000
16.04.20262 BR97.72 610 000
25.03.20263 BR177.73 800 000
18.03.20261 BR64.41 600 000
09.03.20262 BR104.92 600 000
17.02.20262 BR104.92 500 000
15.01.20261 BR63.930 615
12.01.20261 BR63.650 990
08.01.20261 BR64.435 985
05.01.20262 BR97.52 500 000
29.12.20251 BR68.81 540 000
10.12.20252 BR104.92 390 000
14.11.20253 BR136.43 450 000
23.10.20253 BR154.83 490 000
12.09.20252 BR180.22 773 444
29.08.20252 BR121.12 600 000
13.08.20252 BR86.02 300 000
10.07.20251 BR64.491 155
08.07.20252 BR81.22 350 000
18.06.20253 BR126.23 240 000
16.06.20253 BR115.03 100 000
12.06.20252 BR86.02 270 000
03.06.20253 BR146.63 525 000
03.06.20251 BR63.91 400 000
13.05.20251 BR71.61 600 000
16.04.20251 BR62.41 600 000
14.04.20252 BR127.52 057 200
11.04.20253 BR128.42 900 000
10.04.20253 BR128.42 925 000
20.03.20252 BR119.52 670 000
17.03.20253 BR126.23 260 000
03.03.20251 BR60.91 385 000
24.02.20252 BR164.72 355 000
05.02.20252 BR114.02 700 000
23.01.20253 BR126.52 950 000
15.01.20251 BR68.31 380 000
13.01.20253 BR126.22 900 000
07.01.20252 BR128.02 800 000
03.01.20253 BR147.03 150 000
Rentals — 20
DateTypeSize, m²Rent, AED/yr
21.11.20263 bed rooms+hall152.4200 000
18.11.20262 bed rooms+hall100.3115 000
14.11.20261bed room+Hall80.6110 000
13.11.20262 bed rooms+hall94.3130 000
10.11.20262 bed rooms+hall127.5175 000
08.11.20262 bed rooms+hall81.2108 000
01.11.20262 bed rooms+hall113.3140 000
01.11.20261bed room+Hall88.398 000
24.10.20262 bed rooms+hall110.2160 000
24.10.20261bed room+Hall80.5100 000
20.10.20262 bed rooms+hall97.8140 000
19.10.20261bed room+Hall68.881 644
15.10.20261bed room+Hall68.382 000
15.10.20262 bed rooms+hall81.2130 000
15.10.20262 bed rooms+hall94.7130 000
15.10.20261bed room+Hall63.690 000
10.10.20263 bed rooms+hall126.2170 000
06.10.20261bed room+Hall63.685 000
06.10.20261bed room+Hall64.4110 000
05.10.20261bed room+Hall60.880 000

Dubai Land Department transaction registry, updated 25.11.2026. Explore Dubai property transactions →

Estimate a unit in this building from DLD sales

Building median

22 735 AED/m²

2 112 AED/sq ft

half of the deals 21 450 – 25 063 AED/m²

43 DLD sales from 26 Dec 2024 to 3 Nov 2026

This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

Estimate your unit

Indicative figure from DLD sales:
AED 1 445 000
range AED 1 388 000 – 1 503 000, based on 8 deals
Get an exact valuation from a broker

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

Building and neighbourhood

Amenities

  • Community Park
  • Regional Park
  • Golf Club
  • Golf Academy
  • Driving Range
  • Tennis Academy
  • Schools
  • Hotels
  • Juma Mosque
  • Metro Station
  • Townhouse Community
  • Townhome Community
  • Private Hospital
  • Government Hospital
  • Civil Defence
  • Police
  • Community Retail
  • Golf Villas
  • Golf Apartments
  • Business Park
  • Health club
  • Nature trails
  • Jogging tracks
  • Children’s play areas
  • Cycling tracks
  • Restaurants
  • Cafés
  • Medical clinics
  • Spas
  • Salons
  • Swimming pools
Park Point

Ask about this project

Availability, prices and payment plan — answered by the project broker

Your broker for this project

Boniface Anyange

Boniface Anyange

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Park Point: current availability, payment plan, DLD registration. English and Russian.

PDF shortlist · updated 1 November 2026

Dubai Hills Estate: new projects and prices

30 projects · prices from DLD and developers

  1. Park Field Building 2 Park Field Building 2 Dubai Hills Estate · 1–3 BR from AED 1,064,888
  2. Mallside Residences Mallside Residences Dubai Hills Estate from AED 1,072,579
  3. Mallside Residence Mallside Residence Dubai Hills Estate · Studio, 1–3 BR from AED 1,169,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Park Point is a completed residential apartment development by Emaar Properties in Dubai Hills Estate. The 338-unit project was completed on 30 April 2020 and forms part of the 11 million-square-metre Dubai Hills Estate master-planned community. Its apartment collection comprises one-, two- and three-bedroom layouts, with park views identified among the development highlights.

Park Point at Dubai Hills Estate

Park Point sits within Dubai Hills Estate, a mixed-use master-planned community covering 11 million square metres. The community brings together residential neighbourhoods, landscaped parks, winding walkways and an 18-hole championship golf course. Park Point is positioned within this setting with views towards the parks. The wider estate combines apartment, villa and townhouse communities with hospitality, shopping, education and healthcare facilities. Long shaded pathways connect parks across the community, while dedicated cycling tracks and green corridors support movement between neighbourhood facilities. Downtown Dubai is identified as a nearby destination from the estate.

Residential buildings and completion

Park Point was completed on 30 April 2020, following a project start date of 1 November 2016. The development is recorded as finished with a 100.00% completion ratio. It comprises residential buildings configured as ground floor, podium, nine residential floors and roof level. The apartments have a concrete structure, blockwork, and internal and external finishes. Park Point contains 338 units. The project is located in the Hadaeq Sheikh Mohammed Bin Rashid area within Dubai Hills Estate. Its finished status makes it a completed apartment community rather than a property under construction.

One-, two- and three-bedroom apartments

The Park Point collection includes one-, two- and three-bedroom apartment types. One-bedroom layouts range from 573.8 to 731.1 square feet across the listed floor-plan types. The two-bedroom collection ranges from 866.3 to 1,271.3 square feet, providing a broader selection of plan sizes. Three-bedroom apartments range from 1,207.6 to 1,658.4 square feet among the layouts with stated areas. Individual floor plans include suite and balcony areas, with total areas varying by unit configuration. The published floor plans identify apartments across Blocks A, B and C and across multiple levels. Buyers can compare the bedroom count and stated floor-plan area when selecting between the available configurations.

Community facilities and outdoor setting

Dubai Hills Estate includes a community park, regional park, golf club, golf academy and driving range. The community also includes a tennis academy, nature trails, jogging tracks, children’s play areas and dedicated cycling tracks. Its golf offering centres on an 18-hole championship golf course. Facilities identified across the estate include a health club, community retail, restaurants, cafés, hotels, medical clinics, spas and salons. Schools, a mosque, a private hospital, a government hospital, police and civil defence are also included within the listed community facilities. Landscaped parks and shaded pathways form part of the community’s outdoor network.

Connections and nearby destinations

Park Point has recorded driving times of 18 minutes to Dubai Mall, 17 minutes to Palm Jumeirah, 15 minutes to Burj Al Arab and 20 minutes to The Walk at JBR. Dubai International Airport is recorded at a 24-minute drive, while Al Maktoum International Airport is recorded at 36 minutes by road. Nearby schools include GEMS International School Al Khail at 1.7 kilometres and GEMS Wellington Academy Al Khail at 1.8 kilometres. Safa Community School and Kings’ School Al Barsha are among nearby schools identified with an Outstanding inspection rating. Downtown Dubai is also identified as a nearby destination.

Developer

Emaar Properties is the developer of Park Point. Founded in 1997, Emaar Properties is associated with Burj Khalifa, Dubai Mall, Dubai Fountain and Downtown Dubai. Park Point is part of Dubai Hills Estate, whose master plan incorporates residential neighbourhoods alongside parks, walkways, a golf course and community facilities. The project’s apartment range is set within this wider Dubai Hills Estate setting, which includes golf apartments, golf villas, townhouse communities and a business park. Emaar Properties is the marketing developer name used for Park Point.

Service charge, 2026

Approved rate21.45 AED▲ +11.9% per sq ft per year · 231 AED/m²
General / reserve fund19.91 / 1.54AED/sq ft
vs Dubai Hills Estate median▲ +15.8%median 18.53 · rank 18/26
A 1,000 sq ft unit≈ 21,450 AEDper year · ≈ $5,841

Managed by Emaar Community Management · budget 1 Jan 2026 — 31 Dec 2026

History, budget breakdown and nearby buildings →

RERA-approved budget from the DLD service charge index (Mollak) for “Park Point”. Total is the general and reserve funds; additional charges are separate.

Frequent questions

Who is the developer of Park Point?
Park Point was developed by Emaar Properties. Emaar Properties was founded in 1997.
Where is Park Point located?
Park Point is located in Dubai Hills Estate, within the Hadaeq Sheikh Mohammed Bin Rashid area.
Is Park Point completed?
Yes. Park Point is finished with a 100.00% completion ratio.
When was Park Point completed?
The project completion date is 30 April 2020. Construction started on 1 November 2016.
How many units are there at Park Point?
Park Point contains 338 units.
What apartment types are available at Park Point?
Park Point includes one-, two- and three-bedroom apartments. Listed sizes range from 573.8 to 1,658.4 square feet, depending on the apartment type.
What facilities are available in Dubai Hills Estate?
The community includes parks, an 18-hole championship golf course, golf academy, tennis academy, cycling tracks, jogging tracks, nature trails and children’s play areas. Community retail, restaurants, cafés, schools and medical clinics are also listed.
How far is Park Point from Dubai Mall?
Dubai Mall is recorded at an 18-minute drive from Park Point. Palm Jumeirah is recorded at 17 minutes and Burj Al Arab at 15 minutes by road.
How can I buy an apartment in Park Point?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

For owners in Park Point

How much is your property in Park Point worth?

DLD has recorded 552 sales in this building since 2017, 297 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Park Point — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-25, https://continentalclub.ae/project/park-point-dubai-hills-estate/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.