Developer: Majid Developments · Jumeirah Garden City

Mayfair Gardens

Mayfair Gardens is a residential project by Majid Developments in Jumeirah Garden City, Dubai, with prices from AED 875 000, planned handover 14.08.2026, construction 70.1% complete per the DLD registry, 64 apartments, 50 sold to first buyers per the DLD register (as of 23 Nov 2026).

Price fromAED 875 000Developer suppliedDeveloper figure, possibly a launch price. DLD sales over 12 months (to 30.10.2026) mostly start from about AED 1 255 000.
Unit typesStudio · 1 BR387–1 089 ft²DLD registry
Planned handover14.08.2026DLD registry
Construction70.1%DLD registry · checked 20.08.2026

· DLD data as of 23 Nov

≈14 of 64 apartments still available · DLD, 23 Nov
★ 5.0 on Google · 7 reviews

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio24387–515
1 Bedroom40819–1 089

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~114 sq.ft (11 m²); 1 Bedroom — ~250 sq.ft (23 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 23 Nov 2026

≈14 of 64 apartments available

Sold to first buyers 50 (78%)Available ≈14

TypeTotalSoldAvailable
Studios24213
1 bedroom402911
Total645014

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded.

Units left in every Dubai off-plan project →

Payment plan 50/50 50% before handover · 50% on handover

The purchase price is split into these stages.

110%Down payment
240%During construction
350%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

70.1%
  • StatusActive
  • Construction started15.08.2024
  • Planned handover (DLD register)14.08.2026
  • Status date20.08.2026
  • Progress between DLD inspections+20.1% (18.05.2026 → 20.08.2026)
  • Escrow bankEmirates NBD
  • DLD project number3207

Data from the Dubai Land Department project registry (updated 25.11.2026 05:55).

Inspection history 6
025507510031.07.202420.08.2026
Actual, per inspections

Pace: 5.11% per month. At this rate 100% falls on 14.02.2027.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
20.08.2026 70.10%
Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 1 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 2 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 3 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 4 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 5 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 6 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 7 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 8 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 9 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 10 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 11 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 12 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 13 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 14 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 15 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 16 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 17 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 18 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 19 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 20 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 21 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 22 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 23 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 24 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 25 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 26 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 27 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 28 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 29 of 30Mayfair Gardens, Jumeirah Garden City construction progress — 20 August 2026, 70.10% complete, photo 30 of 30
18.05.2026 50.00%
Mayfair Gardens, Jumeirah Garden City construction progress — 18 May 2026, 50.00% complete, photo 1 of 6Mayfair Gardens, Jumeirah Garden City construction progress — 18 May 2026, 50.00% complete, photo 2 of 6Mayfair Gardens, Jumeirah Garden City construction progress — 18 May 2026, 50.00% complete, photo 3 of 6Mayfair Gardens, Jumeirah Garden City construction progress — 18 May 2026, 50.00% complete, photo 4 of 6Mayfair Gardens, Jumeirah Garden City construction progress — 18 May 2026, 50.00% complete, photo 5 of 6Mayfair Gardens, Jumeirah Garden City construction progress — 18 May 2026, 50.00% complete, photo 6 of 6

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Handover is close: snagging inspection

Planned handover of Mayfair Gardens: 14.08.2026. Before you sign the handover form we check 110 points, send a photo report within 24 hours and file the defect list with the developer. Fixed price from 749 AED.

Snagging inspection: prices and scope

Registered transactions in Mayfair Gardens

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

53DLD registrations incl. resales, since 2024
22 340AED per m², median
4%resale, the rest bought from the developer
-10%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +2% over the same period, so the building lagged.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio441 050 00023 86422
1 bedroom902 000 00022 22229

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — -9% on the price per square metre in this building. The district moved +21% over the same period, so the building lagged the market.

22 7972024——
22 9702025——
20 7182026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
22.07.20261 BR90.62 200 000
10.06.2026Studio44.3918 336
08.06.20261 BR80.42 000 000
08.06.20261 BR80.41 665 483
28.04.20261 BR76.11 486 486
23.04.20261 BR80.41 552 216
23.04.20261 BR90.61 555 252
08.04.20261 BR96.01 770 301
06.04.2026Studio47.81 255 000
13.01.20261 BR80.42 009 000
13.08.2025Studio36.01 050 000
15.07.20251 BR90.62 081 089
14.07.20251 BR90.22 011 949
08.07.20251 BR76.11 642 436
20.06.2025Studio47.81 295 683
02.06.2025Studio47.8970 000
20.05.20251 BR103.62 092 758
01.05.20251 BR96.02 000 000
30.04.20251 BR90.61 988 731
22.04.2025Studio47.81 297 294
16.04.20251 BR101.52 075 673
10.04.20251 BR90.61 928 209
18.03.20251 BR90.22 100 000
17.03.2025Studio36.01 013 680
11.03.2025Studio44.31 058 612
05.03.20251 BR96.02 082 165
05.03.2025Studio47.81 188 646
03.03.20251 BR76.11 699 857
26.02.2025Studio36.01 010 427
13.02.20251 BR90.22 200 785
13.02.2025Studio44.31 245 576
12.02.2025Studio36.01 046 293
12.02.2025Studio36.01 067 646
10.02.20251 BR80.41 820 004
22.01.20251 BR96.01 939 495
07.01.2025Studio47.81 000 000
07.01.2025Studio44.31 064 000
01.01.20251 BR90.61 789 000
26.12.2024Studio36.0944 015
09.12.2024Studio41.4900 286
28.11.20241 BR96.02 076 753
28.11.2024Studio44.31 100 000
25.11.2024Studio47.81 207 233
21.11.20241 BR90.22 000 000
19.11.20241 BR96.02 188 321
14.11.2024Studio44.31 050 000
14.11.20241 BR90.21 891 777
13.11.20241 BR76.1891 306
05.11.2024Studio44.31 035 263
31.10.2024Studio44.3918 336

Dubai Land Department transaction registry, updated 24.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 875 000 AED is 3 695 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Exclusive Lounge
  • Lush Chic Bar Area
  • Lush Garden Spaces
  • Barbecue Area
  • Pool Table
  • Foosball Table
  • Table Tennis
  • Chess Playing Area
  • Infinity Pool
  • Modern Gym
  • Yoga Cabana
  • Viewing Deck
  • Social Spaces

What is nearby

  • Burj Khalifa5 мин
  • Dubai International Airport15 мин
  • Dubai Mall4 мин
  • Dubai Water Canal6 мин
  • La Mer Beach5 мин

Places nearby

Mayfair Gardens

Your broker for this project

Eldar Musaev

Eldar Musaev

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Mayfair Gardens: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Mayfair Gardens is a 64-apartment residential development by Majid Developments in Jumeirah Garden City, within Al Satwa. The project is active and has reached 70.1% completion. Its completion date is 14 August 2026.

The project and building

Mayfair Gardens is planned as one residential building with a ground floor, two podium levels, eight residential floors and a roof level. The building is designed with a concrete structure, blockwork, and internal and external finishes. The development combines a lobby and residential accommodation within its mid-rise format. The lobby is described with marble finishes, greenery, ambient lighting and contemporary furnishings. Mayfair Gardens has 64 apartments in total. The project began on 15 August 2024 and is active, with a recorded completion ratio of 70.1%. The recorded completion date is 14 August 2026.

One-bedroom apartments and interiors

Mayfair Gardens offers one-bedroom apartments. The residences are described with contemporary fittings, marble accents and integrated storage. Bedrooms feature floor-to-ceiling windows and city views. Living areas are designed to receive natural light, while kitchens include top-of-the-line appliances and storage. Bathrooms have marble finishes and high-end fixtures. The project also highlights panoramic city views, including views of the Burj Khalifa and Sheikh Zayed Road skyline. The apartment interiors pair marble bathroom finishes with contemporary fittings and kitchen appliances as part of the specified finish and equipment package.

Amenities and shared spaces

The amenity programme includes an infinity pool, modern gym, yoga cabana and viewing deck. The infinity pool is positioned with Dubai skyline views. Landscaped garden spaces and a barbecue area provide outdoor communal areas. Social facilities include an exclusive lounge, a chic bar area and other social spaces. Indoor recreation provision includes a pool table, foosball table, table tennis and a chess playing area. The fitness centre is equipped for exercise, while the yoga cabana provides a dedicated setting for yoga. The amenity collection also includes landscaped gardens for residents’ use.

Jumeirah Garden City location

Mayfair Gardens is located in Jumeirah Garden City, a medium-density residential and mixed-use district within Al Satwa, between Al Satwa and Sheikh Zayed Road. The district is planned as a grid of mid-rise apartments, parks, retail and hotel plots. Sheikh Zayed Road is listed one minute from the development. City Walk and Coca Cola Arena are each listed two minutes away, while DIFC and the World Trade Center are each listed three minutes away. Dubai Mall and Burj Khalifa are each listed four minutes away. La Mer is listed at five minutes, Dubai Water Canal at six minutes, and DXB Airport at 15 minutes.

Payment plan and completion

The starting price for Mayfair Gardens is AED 875,000. The payment plan is structured as 50/50: 10% is due on booking, 40% is payable during construction across the first to fifth instalments, and 50% is due on handover at 100% completion. The project’s recorded start date is 15 August 2024. It is currently active, with a 50.00% completion ratio. The recorded project completion date is 14 August 2026. Mayfair Gardens has 64 apartments across one building.

Majid Developments

Mayfair Gardens is developed by Majid Developments. Majid Developments was founded in 2023. The company is identified as the developer of the project, while Mayfair Gardens is named as its residential development in Jumeirah Garden City. The development’s project identity is Mayfair Gardens by Majid, and its 64-apartment format is set within a single residential building. The project combines one-bedroom apartments with facilities including an infinity pool, modern gym, gardens, lounge spaces and recreational areas.

Frequent questions

Who is the developer of Mayfair Gardens?
Mayfair Gardens is developed by Majid Developments, founded in 2023.
Where is Mayfair Gardens located?
Mayfair Gardens is in Jumeirah Garden City, within Al Satwa. Sheikh Zayed Road is listed one minute away.
What is the starting price at Mayfair Gardens?
The starting price is AED 875,000.
What apartments are available at Mayfair Gardens?
The project offers one-bedroom apartments. The development has 64 apartments in total.
What is the Mayfair Gardens payment plan?
The plan is 50/50: 10% on booking, 40% during construction and 50% on handover.
When is the Mayfair Gardens handover date?
The planned handover (completion) date of Mayfair Gardens in the DLD register was 14 August 2026. Construction progress was 70.1% at the DLD inspection of 20 August 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Mayfair Gardens?
Mayfair Gardens is active and recorded at 70.1% completion.
What amenities does Mayfair Gardens have?
Amenities include an infinity pool, modern gym, yoga cabana, viewing deck, landscaped gardens, barbecue area, lounge and social spaces.
What is nearby Mayfair Gardens?
City Walk and Coca Cola Arena are each listed two minutes away. Dubai Mall and Burj Khalifa are each listed four minutes away.
How many apartments are left in Mayfair Gardens?
According to the Dubai Land Department (DLD) register, as of 23 Nov 2026 ≈14 of 64 apartments in Mayfair Gardens have no registered sale; 50 have been sold to first buyers (78%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Mayfair Gardens?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Mayfair Gardens between 31 Oct 2024 and 22 Jul 2026: median 22 490 AED/m² (2 089 AED/sq ft); half of the deals fell between 20 747 and 24 872 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 1 110 0002225 04644.3
1 BRAED 1 954 0002821 61090.4
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Jumeirah Garden City: new projects and prices

26 projects · prices from DLD and developers

  1. Alba Tower Alba Tower Jumeirah Garden City · 1–2 BR from AED 639,000
  2. Trillium Heights Trillium Heights Jumeirah Garden City · Studio, 1 BR from AED 740,000
  3. Olivia Gardens Residence Olivia Gardens Residence Jumeirah Garden City · Studio, 1–2 BR from AED 824,487

23 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Mayfair Gardens worth?

50 of 64 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 53 (since 2024). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Majid Developments

All 3 projects by Majid Developments →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Mayfair Gardens — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-07, https://continentalclub.ae/project/mayfair-gardens-jumeirah-garden-city/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.