Developer: Century Seven Properties · Jumeirah Garden City
Alba Tower is a residential project by Century 7 Properties in Jumeirah Garden City, Dubai, with handover 30.06.2028, construction 30.9% complete per the DLD registry.
Data from the Dubai Land Department project registry (updated 14.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Century 7 Properties · District: Jumeirah Garden City
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 15.07.2026 | 1 BR | 52.7 | 889 503 |
| 15.07.2026 | 1 BR | 47.2 | 721 811 |
| 15.07.2026 | 1 BR | 41.4 | 904 901 |
| 15.07.2026 | 1 BR | 41.6 | 844 097 |
| 09.04.2026 | 1 BR | 44.8 | 700 000 |
| 09.04.2026 | 1 BR | 44.8 | 645 939 |
| 09.04.2026 | 1 BR | 44.8 | 639 539 |
| 09.04.2026 | 2 BR | 63.7 | 1 300 000 |
| 27.02.2026 | 2 BR | 69.5 | 1 485 750 |
| 27.02.2026 | 2 BR | 63.7 | 1 432 590 |
| 27.02.2026 | 2 BR | 78.0 | 1 316 160 |
| 27.02.2026 | 1 BR | 79.2 | 639 000 |
| 27.02.2026 | 2 BR | 77.7 | 1 497 088 |
| 10.10.2025 | 1 BR | 44.8 | 579 510 |
| 10.10.2025 | 1 BR | 41.5 | 912 900 |
| 10.10.2025 | 1 BR | 38.6 | 899 996 |
| 10.10.2025 | 1 BR | 41.4 | 860 962 |
| 20.08.2025 | 2 BR | 77.9 | 1 570 490 |
| 25.06.2025 | 2 BR | 76.9 | 1 364 331 |
| 24.06.2025 | 2 BR | 69.5 | 1 374 081 |
Dubai Land Department transaction registry, updated 2026-08-13. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +2% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 45 | 703 965 | 15 644 | 24 |
| 2 bedrooms | 77 | 1 316 160 | 17 093 | 14 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Alba Tower is a 73-unit residential development by Century Seven Properties in Jumeirah Garden City, within Al Satwa, Dubai. The project comprises a single building planned with a ground level, eight residential floors and a rooftop. It is active, with completion recorded at 30.92% on 27 July 2026 and completion scheduled for 30 June 2028.
Alba Tower is planned as a mid-rise residential building with a stated height of 44.60 metres. Its configuration includes a ground floor, eight residential floors and a rooftop, while the wider project description also refers to basement and podium levels. The building is designed with a concrete structure, blockwork, and internal and external finishes. Its architectural direction combines contemporary urban design with Italian-inspired elements. The residences are planned with private balconies, double-glazed windows, central air conditioning, fully tiled bathrooms, vanity units and modern kitchen cabinets. Alba Tower contains 73 units in one building and is positioned within the developing Jumeirah Garden City district.
The residential collection at Alba Tower consists of one-bedroom and two-bedroom apartments. The homes are described with private balconies, modern kitchen cabinets and fully tiled bathrooms, alongside double-glazed windows and central air conditioning. Bathroom vanity units form part of the stated interior features. The project is designed as a single residential building rather than a multi-tower development, with eight residential floors above the ground level. A total of 73 units is recorded for Alba Tower. The available project information identifies the apartment types as one-bedroom and two-bedroom homes, providing a focused residential mix within Jumeirah Garden City.
Alba Tower includes a swimming pool and a gymnasium among its planned leisure and wellness facilities. Dedicated children’s play areas are also included. Outdoor facilities are described as landscaped spaces with shaded seating areas and barbecue zones for social gatherings. Retail outlets, cafés, restaurants, dining outlets and a supermarket are listed within the project’s amenity offering. Parks and leisure areas also form part of the facilities described for residents. The amenity programme combines indoor and outdoor shared spaces, with retail and food-and-beverage uses included alongside the pool, gymnasium, play areas and landscaped zones.
Alba Tower is located in Jumeirah Garden City, a medium-density residential and mixed-use district within the administrative area of Al Satwa. The district lies between Al Satwa and Sheikh Zayed Road and is planned as a grid of mid-rise apartments, public parks, retail streets and hotel plots. Jumeirah Garden City has been developed through phased private projects, with earlier structures cleared before construction of the new neighbourhood commenced. The area retains local landmarks including Obai Bin Kaab Masjid. Its current urban form prioritises modest residential blocks, green spaces and street-level retail rather than the super-tall towers proposed under an earlier masterplan.
Jumeirah Garden City Central Park 2 is 0.1 km from Alba Tower, while Jumeirah Garden City West Park is 0.2 km away and Jumeirah Garden City Central Park 3 is 0.3 km away. The Museum of the Future is 0.6 km from the project, and Cinema Akil at 25hours Hotel One is 0.7 km away. Jumeirah Mosque is 1.7 km away, while La Mer and Roxy Cinema at La Mer are each 2.3 km away. Alba Tower is stated to be 9 minutes from Dubai World Trade Center and 15 minutes from both Burj Khalifa and Dubai Mall. The nearest Red Line metro station is 642 metres from the district’s central coordinates.
The stated payment plan requires 20% on booking. A further 41% is payable during construction in monthly 1% instalments, followed by 39% on handover at 100% completion. Alba Tower commenced on 30 September 2024 and has a scheduled completion date of 30 June 2028. The project is active. Its completion ratio was recorded as 30.92% following an inspection dated 27 July 2026. The payment structure divides the total purchase amount between the booking date, the construction period and handover, with the largest single stage being the 41% allocated during construction.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.