Stamn Yuni

Stamn Yuni is a residential project by Stamn Development LLC in Jumeirah Garden City, Dubai, with prices from AED 825 000, handover Q1 2027, construction 11.6% complete per the DLD registry, 88 units.

Price fromAED 825 000
HandoverQ1 2027
Construction11.6%
Units88

Layouts and sizes

TypeSize, sq.ft
Studio312–317
1 Bedroom430–960

Payment plan 50/0

10%40%50%
  • Down payment10%
  • During construction40%
  • after_handover50%

Construction progress

11.58%
  • StatusActive
  • Construction started2025-07-01
  • HandoverQ1 2027
  • Status date31.07.2026
  • Escrow bankADCB
  • DLD project number3596

Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).

Recent transactions

DateTypeSize, m²Price, AED
01.07.20261 BR78.21 437 725
10.06.20261 BR68.91 643 247
16.02.20261 BR59.61 523 944
21.11.20251 BR62.81 600 000
17.11.2025Studio29.5803 297
06.11.2025Studio29.5819 405
03.11.2025Studio29.5826 114
29.10.2025Studio29.5835 124
20.10.2025Studio29.5835 000
17.10.20251 BR73.91 578 763
06.10.20251 BR62.81 550 000
03.10.20251 BR62.81 550 000
23.09.2025Studio29.5826 550
23.09.20251 BR68.91 457 000
22.09.2025Studio40.0770 805
25.06.2025Studio29.5819 405
20.06.20251 BR57.11 305 613
20.06.2025Studio29.5817 968
16.06.2025Studio29.5757 442
12.06.2025Studio29.5834 871

Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →

Amenities

  • Indoor Swimming Pool
  • Landscaped Gardens
  • CCTV Security
  • Gymnasium
  • Restaurants
  • Children's Play Area

Places nearby

About the project

Stamn Yuni is a one-building residential project in Jumeirah Garden City, within Al Satwa, by Stamn Development LLC. The project is active, with a recorded completion ratio of 2.14% on 31 March 2026 and a completion date of 18 March 2027.

Project configuration

Stamn Yuni comprises one building with 88 units. Its recorded building configuration includes a basement, ground floor, two podium levels, eight typical floors and a roof. The project has a total recorded area of 4,428.42. The development started on 1 July 2025, and its completion date is 18 March 2027. Stamn Yuni is positioned within Jumeirah Garden City, a district in the administrative area of Al Satwa.

Jumeirah Garden City setting

Jumeirah Garden City is a medium-density residential and mixed-use district located between Al Satwa and Sheikh Zayed Road. The district is planned as a grid of mid-rise apartment buildings, public parks, retail and hotel plots. Its current masterplan prioritises compact residential blocks and street-level retail rather than super-tall towers. Development in the district has been delivered in phases, with the first completed buildings recorded in 2019. Stamn Yuni forms part of the district’s newer development activity alongside other residential projects.

Parks, landmarks and leisure destinations

Jumeirah Garden City Central Park 3 is 0.1 km from Stamn Yuni. Jumeirah Garden City North Park 2 and Jumeirah Garden City North Park are each 0.2 km away. Museum of the Future is 1.0 km from the project, while Jumeirah Mosque is 1.6 km away. La Mer is 2.2 km away. Cinema Akil at 25hours Hotel One Hotel is 1.0 km from Stamn Yuni, Roxy Cinema at La Mer is 2.2 km away, and Reel Cinemas at Rove Downtown is 2.7 km away.

District connections

Jumeirah Garden City sits beside Sheikh Zayed Road and has access to Dubai’s road and metro network. The nearest Red Line metro station, code R22, is 642 metres from the district’s central coordinates. Dubai International Financial Centre is 1.7 km from the district, Dubai Mall is 3.3 km away, and Burj Khalifa and Downtown Dubai are 3.4 km away. Business Bay is 4.8 km away and Dubai International Airport is 9.2 km away. The district’s location places it between Al Satwa and central Dubai business areas.

Construction status and programme

Stamn Yuni has active status. Its recorded construction completion ratio was 2.14% at the inspection dated 31 March 2026. The project start date is 1 July 2025, and the recorded completion date is 18 March 2027. These dates place the project within the current construction phase of Jumeirah Garden City, where multiple private residential developments are progressing alongside completed mid-rise buildings and public-space elements.

The developer

Stamn Development LLC is the developer of Stamn Yuni. The company was founded in 2024. It is also developing Stamn One in Jumeirah Garden City. Stamn Development LLC is among the private developers active within the district, where residential projects are being developed as part of the area’s phased transition to a mixed-use neighbourhood of mid-rise buildings, parks and retail-fronted streets.

FAQ

Who is the developer of Stamn Yuni?
Stamn Yuni is developed by Stamn Development LLC, a company founded in 2024.
Where is Stamn Yuni located?
Stamn Yuni is in Jumeirah Garden City, within Al Satwa, between Al Satwa and Sheikh Zayed Road.
How many units are in Stamn Yuni?
The project has 88 units in one building.
What is the construction status of Stamn Yuni?
Stamn Yuni is active. Its recorded completion ratio was 2.14% on 31 March 2026.
When is Stamn Yuni scheduled for completion?
The recorded completion date is 18 March 2027.
When did construction start on Stamn Yuni?
The project start date is 1 July 2025.
What is the building configuration at Stamn Yuni?
The building includes a basement, ground floor, two podium levels, eight typical floors and a roof.
What is near Stamn Yuni?
Jumeirah Garden City Central Park 3 is 0.1 km away, Museum of the Future is 1.0 km away, and La Mer is 2.2 km away.
How can I buy an apartment in Stamn Yuni?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request