by Stamn Development LLC in Jumeirah Garden City
Stamn Yuni is a residential project by Stamn Development LLC in Jumeirah Garden City, Dubai, with prices from AED 825 000, handover Q1 2027, construction 11.6% complete per the DLD registry, 88 units.
Layouts and sizes
| Type | Size, sq.ft |
|---|---|
| Studio | 312–317 |
| 1 Bedroom | 430–960 |
Floor plans
Payment plan 50/0
- Down payment10%
- During construction40%
- after_handover50%
Construction progress
- StatusActive
- Construction started2025-07-01
- HandoverQ1 2027
- Status date31.07.2026
- Escrow bankADCB
- DLD project number3596
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 01.07.2026 | 1 BR | 78.2 | 1 437 725 |
| 10.06.2026 | 1 BR | 68.9 | 1 643 247 |
| 16.02.2026 | 1 BR | 59.6 | 1 523 944 |
| 21.11.2025 | 1 BR | 62.8 | 1 600 000 |
| 17.11.2025 | Studio | 29.5 | 803 297 |
| 06.11.2025 | Studio | 29.5 | 819 405 |
| 03.11.2025 | Studio | 29.5 | 826 114 |
| 29.10.2025 | Studio | 29.5 | 835 124 |
| 20.10.2025 | Studio | 29.5 | 835 000 |
| 17.10.2025 | 1 BR | 73.9 | 1 578 763 |
| 06.10.2025 | 1 BR | 62.8 | 1 550 000 |
| 03.10.2025 | 1 BR | 62.8 | 1 550 000 |
| 23.09.2025 | Studio | 29.5 | 826 550 |
| 23.09.2025 | 1 BR | 68.9 | 1 457 000 |
| 22.09.2025 | Studio | 40.0 | 770 805 |
| 25.06.2025 | Studio | 29.5 | 819 405 |
| 20.06.2025 | 1 BR | 57.1 | 1 305 613 |
| 20.06.2025 | Studio | 29.5 | 817 968 |
| 16.06.2025 | Studio | 29.5 | 757 442 |
| 12.06.2025 | Studio | 29.5 | 834 871 |
Dubai Land Department transaction registry, updated 2026-08-06. Explore Dubai property transactions →
Amenities
- Indoor Swimming Pool
- Landscaped Gardens
- CCTV Security
- Gymnasium
- Restaurants
- Children's Play Area
Places nearby
About the project
Stamn Yuni is a one-building residential project in Jumeirah Garden City, within Al Satwa, by Stamn Development LLC. The project is active, with a recorded completion ratio of 2.14% on 31 March 2026 and a completion date of 18 March 2027.
Project configuration
Stamn Yuni comprises one building with 88 units. Its recorded building configuration includes a basement, ground floor, two podium levels, eight typical floors and a roof. The project has a total recorded area of 4,428.42. The development started on 1 July 2025, and its completion date is 18 March 2027. Stamn Yuni is positioned within Jumeirah Garden City, a district in the administrative area of Al Satwa.
Jumeirah Garden City setting
Jumeirah Garden City is a medium-density residential and mixed-use district located between Al Satwa and Sheikh Zayed Road. The district is planned as a grid of mid-rise apartment buildings, public parks, retail and hotel plots. Its current masterplan prioritises compact residential blocks and street-level retail rather than super-tall towers. Development in the district has been delivered in phases, with the first completed buildings recorded in 2019. Stamn Yuni forms part of the district’s newer development activity alongside other residential projects.
Parks, landmarks and leisure destinations
Jumeirah Garden City Central Park 3 is 0.1 km from Stamn Yuni. Jumeirah Garden City North Park 2 and Jumeirah Garden City North Park are each 0.2 km away. Museum of the Future is 1.0 km from the project, while Jumeirah Mosque is 1.6 km away. La Mer is 2.2 km away. Cinema Akil at 25hours Hotel One Hotel is 1.0 km from Stamn Yuni, Roxy Cinema at La Mer is 2.2 km away, and Reel Cinemas at Rove Downtown is 2.7 km away.
District connections
Jumeirah Garden City sits beside Sheikh Zayed Road and has access to Dubai’s road and metro network. The nearest Red Line metro station, code R22, is 642 metres from the district’s central coordinates. Dubai International Financial Centre is 1.7 km from the district, Dubai Mall is 3.3 km away, and Burj Khalifa and Downtown Dubai are 3.4 km away. Business Bay is 4.8 km away and Dubai International Airport is 9.2 km away. The district’s location places it between Al Satwa and central Dubai business areas.
Construction status and programme
Stamn Yuni has active status. Its recorded construction completion ratio was 2.14% at the inspection dated 31 March 2026. The project start date is 1 July 2025, and the recorded completion date is 18 March 2027. These dates place the project within the current construction phase of Jumeirah Garden City, where multiple private residential developments are progressing alongside completed mid-rise buildings and public-space elements.
The developer
Stamn Development LLC is the developer of Stamn Yuni. The company was founded in 2024. It is also developing Stamn One in Jumeirah Garden City. Stamn Development LLC is among the private developers active within the district, where residential projects are being developed as part of the area’s phased transition to a mixed-use neighbourhood of mid-rise buildings, parks and retail-fronted streets.