Developer: Pantheon Elysee Real Estate Development · Jumeirah Village Circle
Maison Elysee I is a residential project by Pantheon Development in Jumeirah Village Circle, Dubai, with handover 31.03.2027, construction 21.1% complete per the DLD registry.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Pantheon Development · District: Jumeirah Village Circle
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 13.08.2026 | 1 BR | 60.4 | 950 004 |
| 06.08.2026 | Studio | 37.1 | 799 900 |
| 09.07.2026 | 61.1 | 1 996 534 | |
| 09.07.2026 | Studio | 35.4 | 653 301 |
| 10.06.2026 | Studio | 38.2 | 699 900 |
| 20.05.2026 | 1 BR | 60.4 | 872 903 |
| 19.05.2026 | 1 BR | 60.4 | 549 900 |
| 06.05.2026 | Studio | 37.0 | 767 151 |
| 06.05.2026 | Studio | 37.8 | 767 151 |
| 23.04.2026 | 64.2 | 2 287 771 | |
| 20.04.2026 | 2 BR | 83.5 | 1 138 401 |
| 17.04.2026 | Studio | 37.1 | 669 900 |
| 03.03.2026 | Studio | 37.1 | 673 101 |
| 26.02.2026 | Studio | 35.4 | 659 900 |
| 25.02.2026 | 1 BR | 63.8 | 929 900 |
| 23.02.2026 | 1 BR | 60.1 | 901 502 |
| 23.02.2026 | Studio | 38.2 | 699 900 |
| 23.02.2026 | Studio | 37.1 | 669 900 |
| 19.02.2026 | Studio | 36.5 | 729 900 |
| 18.02.2026 | Studio | 37.1 | 689 900 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 37 | 676 102 | 18 273 | 143 |
| 1 bedroom | 60 | 909 900 | 15 165 | 119 |
| 2 bedrooms | 83 | 1 138 401 | 13 716 | 16 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
From 2024 to 2026 — +15% on the price per square metre in this building. The district moved +10% over the same period, so the building outpaced the market.
Top to bottom: purchase price per m², year, annual rent per m², gross yield.
All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Maison Elysee I is a single-building residential project in Jumeirah Village Circle, Dubai, developed by Pantheon Elysee Real Estate Development. The project is active, with 21.12% completion recorded. Completion is scheduled for 31 March 2027.
Maison Elysee I is planned as one residential building in Jumeirah Village Circle. The building configuration comprises two basement levels, a ground floor, four podium levels, 22 upper floors and a roof level. The project has 355 units. Construction began on 1 April 2024, and the project is active. Its scheduled completion date is 31 March 2027. The recorded total project area is 18,263.94.
The structure of Maison Elysee I combines residential floors with a multi-level base. Two basement levels and four podium levels form part of the building, followed by 22 floors and a roof level. The project is recorded as a single building rather than a multi-building development. This configuration places all 355 units within one project structure in Jumeirah Village Circle.
Maison Elysee I is located in Jumeirah Village Circle, a freehold master community developed by Nakheel. The wider community covers more than 870 hectares and is divided into six districts. Its housing includes apartment buildings, townhouses and villas, with development and infrastructure delivered in phases since the community was launched in 2005. Jumeirah Village Circle sits near the junction of Sheikh Zayed Road and Al Khail Road, and entry and exit points connect the area with Hessa Street. Construction activity and new district-level services continue across the community.
Jumeirah Village Circle is primarily car-oriented and has road links to major parts of Dubai. Dubai Marina is 7.3 km away, Palm Jumeirah is 9.3 km away and JBR Beach is 8.0 km away. Mall of the Emirates is 6.9 km away, while Burj Khalifa and Downtown Dubai are 17.0 km away. Dubai Mall is 17.3 km away. Dubai International Airport is 27.0 km away, and Al Maktoum International Airport is 18.4 km away. The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central Jumeirah Village Circle locations.
Circle Mall is a retail project within Jumeirah Village Circle. It was planned with 235 shops, an anchor supermarket, two department stores, a multi-screen cinema, a health clinic, cafés, restaurants and a food court. By July 2020, the mall had topped out and its façade was partly complete. The broader Jumeirah Village Circle area contains 367 projects, including completed, under-construction and design-stage residential and mixed-use developments.
Maison Elysee I started on 1 April 2024 and has a scheduled completion date of 31 March 2027. The project is active, with a completion ratio of 21.12%. The development is identified by project number 2905. The planned building includes two basement levels, a ground floor, four podium levels, 22 floors and a roof level.
Pantheon Elysee Real Estate Development is the developer of Maison Elysee I. The company is responsible for the project in Jumeirah Village Circle, which is planned as a single building containing 355 units. Maison Elysee I has been active since its construction start date of 1 April 2024 and is scheduled for completion on 31 March 2027.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.