Developer: Casa Vista Development · Jumeirah Village Circle

Casa Vista Residence By Golden Woods

Casa Vista Residence By Golden Woods is a residential project by Casa Vista Development in Jumeirah Village Circle, Dubai, with prices from AED 949 000, planned handover 30.06.2026, construction 90.1% complete per the DLD registry, 88 apartments (+2 non-residential units), 78 sold to first buyers per the DLD register (as of 19 Nov 2026).

Price fromAED 949 000Our calculation
Unit types1 · 2 BR691–1 022 ft²DLD registry
Planned handover30.06.2026DLD registry
Construction90.1%DLD registry · checked 09.06.2026
≈10 of 88 apartments still available · DLD, 19 Nov
★ 5.0 on Google · 7 reviews

Prices, floor plans and payment

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom78691–922
2 Bedroom10938–1 022
Other units2788–1 473

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~122 sq.ft (11 m²); 2 Bedroom — ~157 sq.ft (15 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 949 000 AED is 4 007 AED.

Calculate mortgage

Estimates only; not a bank approval.

Unit availability · DLD data as of 19 Nov 2026

≈10 of 88 apartments available

Sold to first buyers 78 (89%)Available ≈10

TypeTotalSoldAvailable
1 bedroom786810
2 bedrooms10100
Total887810

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded. Non-residential units (2) are not included.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover and construction

Dubai Land Department registry and construction progress checks

Handover date & construction progress

90.05%
  • Construction started01.03.2024
  • Planned handover (DLD register)30.06.2026
  • Status date09.06.2026
  • Progress between DLD inspections+11.97% (27.10.2025 → 09.06.2026)
  • Escrow bankADCB
  • DLD project number2998

Data from the Dubai Land Department project registry (updated 21.11.2026 05:55).

Inspection history 4
025507510011.03.202409.06.2026
Actual, per inspections

Pace: 1.62% per month. At this rate 100% falls on 13.12.2026.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 120
09.06.2026 90.05%
Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 1 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 2 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 3 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 4 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 5 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 6 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 7 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 8 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 9 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 10 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 11 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 12 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 13 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 14 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 15 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 16 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 17 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 18 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 19 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 20 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 21 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 22 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 23 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 24 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 25 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 26 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 27 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 28 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 29 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 30 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 31 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 32 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 33 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 34 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 35 of 36Casa Vista Residence By Golden Woods, Jumeirah Village Circle construction progress — 9 June 2026, 90.05% complete, photo 36 of 36

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Handover is close: snagging inspection

Planned handover of Casa Vista Residence By Golden Woods: 30.06.2026. Before you sign the handover form we check 110 points, send a photo report within 24 hours and file the defect list with the developer. Fixed price from 749 AED.

Snagging inspection: prices and scope

Demand and transaction prices

Registered DLD transactions only — not listings

Registered transactions in Casa Vista Residence By Golden Woods

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

85DLD registrations incl. resales, since 2024
15 399AED per m², median
5%resale, the rest bought from the developer
+3%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom661 044 62415 82869
2 bedrooms951 392 74914 66110

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — +9% on the price per square metre in this building. The district moved +10% over the same period, so the building tracked the market.

14 6422024——
15 5542025——
16 0312026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
21.10.20261 BR85.61 520 657
07.10.20261 BR64.2949 914
29.09.20261 BR83.81 487 607
31.07.20261 BR78.61 176 301
22.07.20261 BR65.71 095 000
22.06.20261 BR78.6838 940
22.06.20261 BR65.7714 510
22.06.20261 BR66.3720 000
09.06.20261 BR74.31 100 000
18.05.20262 BR87.21 029 798
31.03.20261 BR66.61 050 090
25.03.20261 BR78.61 269 705
18.03.20261 BR74.31 144 000
09.03.20261 BR65.71 081 000
23.02.20261 BR78.61 269 705
18.02.20261 BR64.81 075 000
18.02.20261 BR78.61 269 390
17.02.20262 BR87.21 397 270
16.02.20262 BR87.21 397 270
22.01.20261 BR78.61 275 000
05.01.20261 BR74.31 198 830
05.01.20261 BR65.41 001 046
30.12.20251 BR66.31 056 039
30.12.20251 BR65.71 050 000
24.11.20251 BR65.4990 000
24.11.20251 BR64.21 037 055
21.11.20251 BR64.8950 000
21.11.20251 BR74.31 153 830
14.11.20251 BR78.61 223 149
27.10.20252 BR95.01 533 540
23.10.202573.21 811 963
14.10.20251 BR66.31 050 000
30.09.20251 BR66.31 074 600
29.09.2025136.93 461 644
11.09.20251 BR78.61 284 240
10.09.20251 BR64.8935 375
08.09.20251 BR64.2949 914
08.09.20251 BR65.4935 523
03.09.20251 BR64.2954 707
02.09.20251 BR66.3972 000
02.09.20251 BR65.7964 589
29.08.20252 BR87.21 311 044
21.08.20251 BR74.31 280 000
18.08.20251 BR65.71 015 000
15.08.20251 BR66.31 045 871
25.07.20251 BR65.71 032 444
22.07.20251 BR74.31 101 730
02.06.20251 BR66.31 044 000
30.05.20251 BR66.6995 775
13.05.20251 BR66.21 044 624

Dubai Land Department transaction registry, updated 21.11.2026. Explore Dubai property transactions →

Estimate a unit in this building from DLD sales

Building median

15 758 AED/m²

1 464 AED/sq ft

half of the deals 14 839 – 16 146 AED/m²

50 DLD sales from 13 May 2025 to 21 Oct 2026

This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

Estimate your unit

Indicative figure from DLD sales:
AED 1 043 000
range AED 982 000 – 1 070 000, based on 43 deals
Get an exact valuation from a broker

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

Building and neighbourhood

Amenities

  • Shared Pool
  • Shared Gym
  • Security
  • Covered Parking
  • Lobby in Building
  • Children's Play Area
  • Children's Pool
  • Pets Allowed

Places nearby

🌳 Khansoor Park · 0.3 km🌳 Eisbej Park · 0.4 km🌳 Henna Park · 0.5 km🧸 Ladybird Early Learning Centre JVC · 0.5 km🌳 Qesad Park · 0.6 km
Casa Vista Residence By Golden Woods

Ask about this project

Availability, prices and payment plan — answered by the project broker

Your broker for this project

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Casa Vista Residence By Golden Woods: current availability, payment plan, DLD registration. English and Russian.

PDF shortlist · updated 1 November 2026

Jumeirah Village Circle: new projects and prices

30 projects · prices from DLD and developers

  1. Samana Waves Samana Waves Jumeirah Village Circle · Studio, 1–3 BR from AED 449,000
  2. Auresta Tower Auresta Tower Jumeirah Village Circle · Studio, 1–3 BR from AED 499,000
  3. Aria Heights Aria Heights Jumeirah Village Circle · Studio, 1–3 BR from AED 554,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

About the project

Casa Vista Residence By Golden Woods is a single-building residential and retail development in Jumeirah Village Circle. It is being developed by Casa Vista & Golden Woods Developers and comprises 88 apartments (+2 non-residential units) within a B+G+5 building. The project is active, with 90.05% completion recorded on 9 June 2026 and a completion date of 30 June 2026.

The project and building

Casa Vista Residence By Golden Woods is planned as a B+G+5 residential and retail building, with one building and 88 apartments (+2 non-residential units). The structure is designed as a concrete building with blockwork and internal and external finishes. The project has a total area of 6,617.12 square metres. Its construction start date was 1 March 2024, and the scheduled project completion date is 30 June 2026. The residential and retail configuration places both uses within the same building, while the five upper floors sit above the ground floor and basement level.

Construction progress and completion

The project is active. Its recorded completion ratio is 90.05%, based on an inspection dated 9 June 2026. The scheduled completion date is 30 June 2026. Construction began on 1 March 2024. Casa Vista Residence By Golden Woods has 88 apartments (+2 non-residential units) across its single B+G+5 building. The progress figure, inspection date and completion date provide the current construction reference points for buyers assessing the development’s delivery stage.

Jumeirah Village Circle setting

Casa Vista Residence By Golden Woods is located in Jumeirah Village Circle, a freehold master community developed by Nakheel. JVC covers more than 870 hectares and is divided into six districts. The community includes low- to mid-rise apartment buildings, townhouses and villas, with continuing construction activity and new district-level services. JVC sits near the junction of Sheikh Zayed Road and Al Khail Road, with entry and exit points to Hessa Street introduced in October 2016. The wider area contains 367 projects, combining completed homes with developments under construction and at the design stage.

Road access and nearby destinations

Jumeirah Village Circle is primarily car-oriented and has road connections to central Dubai corridors. From JVC, Dubai Marina is 7.3 km away, Palm Jumeirah is 9.3 km away and JBR Beach is 8.0 km away. Mall of the Emirates is 6.9 km away, while Downtown Dubai and Burj Khalifa are 17.0 km away. Dubai Mall is 17.3 km away, Dubai International Airport is 27.0 km away and Al Maktoum International Airport is 18.4 km away. The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central JVC locations.

Retail and community facilities

JVC includes Circle Mall, a retail project planned with 235 shops, an anchor supermarket, two department stores, a multi-screen cinema, a health clinic, cafés, restaurants and a food court. By July 2020, Circle Mall had topped out and its façade was partly complete. The district also includes established apartment buildings, townhouse rows and villa clusters. Its mix of housing types forms part of a larger residential master community that has been developed in phases since its launch in 2005.

The developer

Casa Vista Residence By Golden Woods is being developed by Casa Vista & Golden Woods Developers. The project is one of the active residential and retail developments in Jumeirah Village Circle. The developer is delivering a single 88-apartment B+G+5 building with a concrete structure, blockwork and internal and external finishes. Construction started on 1 March 2024, and the project is scheduled for completion on 30 June 2026.

Frequent questions

Who is the developer of Casa Vista Residence By Golden Woods?
Casa Vista Residence By Golden Woods is being developed by Casa Vista & Golden Woods Developers.
Where is Casa Vista Residence By Golden Woods located?
The project is located in Jumeirah Village Circle, Dubai.
How many units are in Casa Vista Residence By Golden Woods?
The development has 88 apartments (+2 non-residential units) in one building.
What is the building configuration?
Casa Vista Residence By Golden Woods is a B+G+5 residential and retail building.
When is the Casa Vista Residence By Golden Woods handover date?
The planned handover (completion) date of Casa Vista Residence By Golden Woods in the DLD register was 30 June 2026. Construction progress was 90.05% at the DLD inspection of 9 June 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Casa Vista Residence By Golden Woods?
The project is active and was 90.05% complete at the inspection dated 9 June 2026.
When did construction start?
Construction started on 1 March 2024.
What is near Casa Vista Residence By Golden Woods?
JVC is 7.3 km from Dubai Marina, 6.9 km from Mall of the Emirates and 9.3 km from Palm Jumeirah. Circle Mall is within the JVC community.
How many apartments are left in Casa Vista Residence By Golden Woods?
According to the Dubai Land Department (DLD) register, as of 19 Nov 2026 ≈10 of 88 apartments in Casa Vista Residence By Golden Woods have no registered sale; 78 have been sold to first buyers (89%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Casa Vista Residence By Golden Woods?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

For owners in Casa Vista Residence By Golden Woods

How much is your property in Casa Vista Residence By Golden Woods worth?

78 of 88 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 85 (since 2024). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Casa Vista Residence By Golden Woods — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-22, https://continentalclub.ae/project/casa-vista-residence-by-golden-woods-jumeirah-village-circle/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.