Developer: I K R Real Estate Development · Jumeirah Village Circle
Provenza Residences is a residential project by IKR Real Estate Development in Jumeirah Village Circle, Dubai, with handover 30.09.2027, construction 20.3% complete per the DLD registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: IKR Real Estate Development · District: Jumeirah Village Circle
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 06.08.2026 | 1 BR | 78.5 | 1 110 000 |
| 23.07.2026 | 1 BR | 74.1 | 1 200 000 |
| 21.07.2026 | 1 BR | 74.3 | 1 090 400 |
| 07.07.2026 | 1 BR | 74.3 | 1 080 000 |
| 06.07.2026 | 93.9 | 2 008 000 | |
| 12.06.2026 | 1 BR | 75.3 | 1 070 000 |
| 12.06.2026 | 1 BR | 74.4 | 1 070 000 |
| 02.06.2026 | 2 BR | 110.7 | 1 508 800 |
| 05.05.2026 | Studio | 37.0 | 590 000 |
| 05.05.2026 | 1 BR | 75.2 | 1 073 500 |
| 21.04.2026 | Studio | 38.4 | 680 000 |
| 21.04.2026 | 1 BR | 74.1 | 1 050 000 |
| 21.04.2026 | 1 BR | 74.6 | 1 090 000 |
| 21.04.2026 | 1 BR | 74.1 | 1 121 000 |
| 21.04.2026 | Studio | 40.6 | 750 000 |
| 21.04.2026 | 1 BR | 74.3 | 1 121 000 |
| 01.04.2026 | 1 BR | 74.1 | 1 113 600 |
| 01.04.2026 | Studio | 37.1 | 646 800 |
| 09.03.2026 | 1 BR | 75.2 | 1 075 200 |
| 09.03.2026 | 1 BR | 63.6 | 998 400 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 38 | 669 750 | 17 625 | 30 |
| 1 bedroom | 74 | 1 075 200 | 14 530 | 68 |
| 2 bedrooms | 152 | 1 700 000 | 11 184 | 5 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Provenza Residences is a single residential building in Jumeirah Village Circle, comprising 188 units with ground-floor retail, a swimming pool and a gym. It is being developed by I K R Real Estate Development. The project is active, with construction recorded at 13.84% completion on 19 May 2026 and a completion date of 30 September 2027.
Provenza Residences is planned as one residential building with a ground floor, four podium levels, 12 residential floors and a roof level. The ground floor includes retail space, placing commercial premises within the building’s configuration. The development contains 188 units in total and has a recorded total area of 13,739.03. Construction started on 1 July 2025, and the project is active. Its current recorded completion level is 13.84%, based on an inspection dated 19 May 2026. The building format combines podium parking levels with 12 residential storeys above, alongside shared leisure facilities located on the first floor.
The development has 188 units across its single-building scheme. Provenza Residences is located in Jumeirah Village Circle, a freehold master community with a housing mix that includes apartment buildings, townhouses and villas. Within the project itself, the residential component is arranged in a building rising above four podium levels, with 12 residential floors and a roof. The recorded project area is 13,739.03, and the development is scheduled to reach completion on 30 September 2027. Ground-floor retail forms part of the building, separating commercial space from the residential floors above.
The first floor at Provenza Residences is designated for a swimming pool and gym. These facilities are included within the building rather than being separate community amenities. Retail space is planned at ground level, while four podium levels form part of the building structure. The residential levels extend from this podium base through 12 floors, with a roof level completing the configuration. The project’s amenities and retail component are therefore integrated into a single 188-unit building in Jumeirah Village Circle.
Provenza Residences is in Jumeirah Village Circle, commonly known as JVC. JVC is a Nakheel master community launched in 2005 and organised into six districts across more than 870 hectares. It is positioned near the junction of Sheikh Zayed Road and Al Khail Road, with entry and exit points connecting to Hessa Street. From JVC, Mall of the Emirates is 6.9 km away, Dubai Marina is 7.3 km away, JBR Beach is 8.0 km away and Palm Jumeirah is 9.3 km away. Downtown Dubai is 17.0 km away, while Dubai International Airport is 27.0 km away. The nearest Dubai Metro Red Line station, R34, is 6,139 metres from central JVC locations.
Work on Provenza Residences began on 1 July 2025. The project is active, and its recorded construction completion ratio was 13.84% following the inspection dated 19 May 2026. The scheduled project completion date is 30 September 2027. The development consists of one building and 188 units, with ground-floor retail and first-floor swimming pool and gym facilities. Its building structure is recorded as ground floor, four podium levels, 12 floors and a roof level. These details place the project within an active construction programme with a defined completion date.
Provenza Residences is developed by I K R Real Estate Development. The developer is delivering a 188-unit residential project in Jumeirah Village Circle, configured as a single building with retail at ground level, four podium floors, 12 residential floors and a roof. The building also includes a swimming pool and gym on the first floor. Construction commenced on 1 July 2025, with the project scheduled for completion on 30 September 2027. As of the 19 May 2026 inspection, the development was active and 13.84% complete.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.