Developer: Hesper Property Developers · International City 2

Linden Residences

Linden Residences is a residential project by Hesper Property Developers in International City 2, Dubai, with prices from AED 480 000, handover Q4 2027, construction 26.8% complete per the DLD registry, 72 apartments, 16 sold to first buyers per the DLD register (as of 13 Nov 2026).

Price fromAED 480 000Our calculation
Unit typesStudio · 1 · 2 BR420–1 926 ft²DLD registry
HandoverQ4 2027Developer supplied
Construction26.8%DLD registry · checked 04.09.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio27420–709
1 Bedroom36747–1 175
2 Bedroom91 185–1 926

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~68 sq.ft (6.3 m²); 1 Bedroom — ~220 sq.ft (20 m²); 2 Bedroom — ~461 sq.ft (43 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 13 Nov 2026

≈56 of 72 apartments available

Sold to first buyers 16 (22%)Available ≈56

TypeTotalSoldAvailable
Studios271413
1 bedroom36234
2 bedrooms909
Total721656

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded.

Compare with similar projects

Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.

Compare with 3 closest Ask a broker on WhatsApp

Handover date & construction progress

26.78%
  • Construction started01.04.2024
  • HandoverQ4 2027
  • Status date04.09.2026
  • Progress between DLD inspections+14.9% (30.04.2026 → 04.09.2026)
  • Escrow bankMashreq Bank
  • DLD project number3097

Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).

Inspection history 4
025507510030.08.202404.09.2026
Actual, per inspections

Pace: 2.70% per month. At this rate 100% falls on 07.12.2028.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 65
04.09.2026 26.78%
Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 1 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 2 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 3 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 4 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 5 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 6 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 7 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 8 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 9 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 10 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 11 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 12 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 13 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 14 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 15 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 16 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 17 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 18 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 19 of 20Linden Residences, International City 2 construction progress — 4 September 2026, 26.78% complete, photo 20 of 20
30.04.2026 11.88%
Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 1 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 2 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 3 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 4 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 5 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 6 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 7 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 8 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 9 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 10 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 11 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 12 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 13 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 14 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 15 of 16Linden Residences, International City 2 construction progress — 30 April 2026, 11.88% complete, photo 16 of 16

29 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
12.06.20261 BR61.3670 000
08.06.2026Studio42.9237 703
23.04.2026Studio44.3470 000
11.03.2026Studio42.9480 000
06.03.2026Studio44.9555 668
23.02.2026Studio40.2497 248
19.02.20261 BR72.9875 556
19.02.2026Studio42.9520 178
19.02.2026Studio40.2497 248
27.01.2026Studio31.2420 000
02.01.2026Studio42.9507 716
15.12.2025Studio39.0450 000
26.11.2025Studio44.7539 848
25.11.2025Studio40.2482 331
29.10.2025Studio39.0451 000
27.10.2025Studio39.0475 871
24.10.2025Studio31.2380 982
11.06.20182 500.03 550 000
20.10.20102 500.01 480 100

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 480 000 AED is 2 027 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Shared Pool
  • Shared Gym
  • Security
  • Covered Parking
  • Lobby in Building
  • Children's Play Area
  • Children's Pool
  • Pets Allowed
Linden Residences

Your broker for this project

Boniface Anyange

Boniface Anyange

Broker · Continental Club Property · RERA ORN 31933

Answers questions about Linden Residences: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Linden Residences is a 72-apartment residential building in International City 2, within Warsan Fourth. Black Soil Real Estate Development is developing the project, which is active and recorded at 26.78% completion, with completion dated 30 December 2027.

The residential building

Linden Residences is planned as one residential building with 72 apartments. The building configuration is recorded as G+1P+5+R, comprising a ground level, one parking level, five upper levels and a roof level. It forms a single-building project rather than a multi-building development. The project started on 1 April 2024 and has a total recorded area of 5,540.58. Linden Residences is located in Warsan Fourth, in the district known as International City 2. Its project number is 3097.

Construction status and completion

Linden Residences is active. Its recorded completion ratio is 26.78%, based on an inspection dated 4 September 2026. The project completion date is 30 December 2027. Construction began on 1 April 2024. Buyers considering the development can therefore assess it as a project under construction, with work progressing toward its recorded completion date. The development contains 72 apartments in one building, allowing the construction status and expected completion date to be considered at the level of the full project rather than across separate phases or buildings.

International City 2 setting

International City 2 is a planned extension of International City in Dubai’s Warsan 4 area. The district covers 731 hectares and incorporates areas commonly known as Phase 2 and Phase 3. It is bounded by Emirates Road to the west, Academic City to the east, Dubai Silicon Oasis to the south and International City 1 to the north. The masterplan includes a central high-rise circle surrounded by low- and mid-rise neighbourhoods. International City Phase 3 is associated primarily with mid-rise apartment buildings, while Phase 2, rebranded as Greenview, was redesigned for townhouses and villas.

Parks, attractions and leisure nearby

Silicon North Park is 2.1 km from Linden Residences, while Silicon Oasis Lake Park is 3.3 km away and Silicon Oasis Community Park is 4.1 km away. Novo Cinema at Dragon Mall is 3.1 km away. Dubai Safari Park is 6.4 km away, Yalla Bowling at City Centre Mirdif is 7.0 km away, and Ras Al Khor Wildlife Sanctuary is 8.0 km away. Al Badia Golf Club is 7.6 km from the project, while The Track Meydan Golf is 8.4 km away. Vox Cinemas at Mirdif City Centre is 7.2 km away.

District plan and transport context

International City 2 has a masterplan divided into five character zones: District Centre, The Ramblas, Residential Clusters, Open Space areas and International City Phase 3. The District Centre is planned as a mixed-use area with mid-rise offices, retail buildings and active street frontages. The Ramblas is planned as a pedestrianised spine with mixed-use buildings and ground-floor retail. Roads and pavements are substantially in place across the district, while public open spaces are being established through the staged masterplan. The nearest Red Line Dubai Metro station is 9,071 metres from International City 2. A Blue Line route and station are planned for the corridor between Phase 2 and Phase 3.

The developer

Black Soil Real Estate Development is the developer of Linden Residences. The company is developing the project as a 72-apartment residential building in International City 2. Linden Residences is recorded under project number 3097 and consists of one building configured as G+1P+5+R. Construction started on 1 April 2024, and the project is active with a recorded completion ratio of 26.78%. The recorded project completion date is 30 December 2027. These details identify the development as a defined single-building residential project rather than a district-wide master development.

Frequent questions

Who is the developer of Linden Residences?
Black Soil Real Estate Development is the developer of Linden Residences.
Where is Linden Residences located?
Linden Residences is in International City 2, within Warsan Fourth in Dubai.
How many units are in Linden Residences?
The project has 72 apartments in one residential building.
What is the building configuration of Linden Residences?
The building is configured as G+1P+5+R.
What is the completion status of Linden Residences?
The project is active and recorded at 26.78% completion. The inspection date associated with this ratio is 30 April 2026.
When is the Linden Residences handover date?
Linden Residences handover (completion) is scheduled for Q4 2027 (developer data). The DLD register lists 30 December 2027. Construction progress was 26.78% at the DLD inspection of 4 September 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
When did construction start at Linden Residences?
The recorded project start date is 1 April 2024.
What is near Linden Residences?
Silicon North Park is 2.1 km away and Novo Cinema at Dragon Mall is 3.1 km away. Dubai Safari Park is 6.4 km away.
How many apartments are left in Linden Residences?
According to the Dubai Land Department (DLD) register, as of 13 Nov 2026 ≈56 of 72 apartments in Linden Residences have no registered sale; 16 have been sold to first buyers (22%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Linden Residences?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 17 registered DLD sales in Linden Residences between 24 Oct 2025 and 12 Jun 2026: median 12 007 AED/m² (1 115 AED/sq ft); half of the deals fell between 11 533 and 12 196 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 485 0001512 06940.2
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

International City 2: new projects and prices

23 projects · prices from DLD and developers

  1. Moonsa Residences Moonsa Residences International City 2 · Studio, 1–3 BR from AED 400,000
  2. Elevia Residences Elevia Residences International City 2 · Studio, 1–2 BR from AED 450,000
  3. Elevia Residences 3 Elevia Residences 3 International City 2 · Studio, 1–2 BR from AED 450,000

20 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Linden Residences — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/linden-residences-international-city-2/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.