Developer: Deyaar · Downtown Jebel Ali

Eleve by Deyaar

Eleve by Deyaar is a residential project by Deyaar in Downtown Jebel Ali, Dubai, with prices from AED 555 458, handover Q2 2027, construction 20% complete per the DLD registry, 818 units, 786 DLD-registered sales since 2015.

Price fromAED 555 458Developer supplied
HandoverQ2 2027Developer supplied
Construction20%DLD registry · checked 24.09.2026
Units818DLD registry
DLD sales786 since 2015DLD registry
Median sale priceAED 14 037/m²Our calculation
Mortgage~AED 2 350/moOur calculation

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio64409–424
1 Bedroom394750–885
2 Bedroom2981 103–1 306
3 Bedroom581 633–2 229
Other units41 379–2 145

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Payment plan 70/30, (1% Monthly P.H.O)

The purchase price is split into these stages.

110%Down payment
250%During construction
310%On handover
430%Post-handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 555 458 AED is 2 346 AED.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

20.01%
  • StatusActive
  • Construction started31.10.2024
  • HandoverQ2 2027
  • Status date24.09.2026
  • Progress between DLD inspections+4.31% (23.06.2026 → 24.09.2026)
  • Escrow bankEmirates NBD
  • DLD project number2965

Data from the Dubai Land Department project registry (updated 07.10.2026 09:55).

Inspection history 6
025507510016.02.202424.09.2026
Actual, per inspections

Pace: 1.09% per month. At this rate 100% falls on 31.10.2032.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 56
24.09.2026 20.01%
Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 1 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 2 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 3 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 4 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 5 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 6 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 7 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 8 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 9 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 24 September 2026, 20.01% complete, photo 10 of 10
23.06.2026 15.70%
Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 1 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 2 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 3 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 4 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 5 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 6 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 7 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 8 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 9 of 10Eleve by Deyaar, Downtown Jebel Ali construction progress — 23 June 2026, 15.70% complete, photo 10 of 10
19.03.2026 12.94%
Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 1 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 2 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 3 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 4 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 5 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 6 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 7 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 8 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 9 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 10 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 11 of 12Eleve by Deyaar, Downtown Jebel Ali construction progress — 19 March 2026, 12.94% complete, photo 12 of 12
28.11.2025 9.21%
Eleve by Deyaar, Downtown Jebel Ali construction progress — 28 November 2025, 9.21% complete, photo 1 of 4Eleve by Deyaar, Downtown Jebel Ali construction progress — 28 November 2025, 9.21% complete, photo 2 of 4Eleve by Deyaar, Downtown Jebel Ali construction progress — 28 November 2025, 9.21% complete, photo 3 of 4Eleve by Deyaar, Downtown Jebel Ali construction progress — 28 November 2025, 9.21% complete, photo 4 of 4

20 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
24.09.2026Studio38.0659 269
21.09.20262 BR121.21 620 554
21.09.20262 BR119.51 642 637
21.09.20263 BR154.82 324 691
14.09.20261 BR73.7923 440
11.09.20262 BR121.21 599 534
08.09.20262 BR101.41 520 828
08.09.20262 BR103.11 524 979
08.09.20262 BR122.51 660 220
02.09.20262 BR121.21 647 214
02.09.20262 BR121.31 701 041
02.09.20262 BR108.61 546 085
02.09.20263 BR151.82 287 743
02.09.20262 BR113.21 590 923
02.09.20262 BR107.91 741 681
31.08.20262 BR104.41 535 834
31.08.20262 BR99.61 507 978
28.07.20261 BR75.1976 891
06.07.20261 BR78.71 284 094
18.06.20263 BR157.42 368 042

Dubai Land Department transaction registry, updated 06.10.2026. Explore Dubai property transactions →

Registered transactions in Eleve by Deyaar

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

786deals since 2015
14 037AED per m², median
0%resale, the rest bought from the developer
+3%over the past year

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +4% over the same period, so the building matched it.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio38626 51916 48767
1 bedroom741 012 90013 688398
2 bedrooms1111 556 47914 022276
3 bedrooms1572 345 73014 94144

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2024 to 2026 — +3% on the price per square metre in this building. The district moved +33% over the same period, so the building lagged the market.

13 9722024——
14 0262025——
14 4152026*——

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

How much is your property in Eleve by Deyaar worth?

DLD has recorded 786 sales in this building since 2015, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details.

Amenities

  • Lobby and lounge
  • Swimming pool
  • Kids pool
  • Gym
  • Yoga terrace
  • Toilet and changing room
  • Residence lounge
  • Club room
  • Sports activities room
  • Outdoor seating area

Places nearby

Eleve by Deyaar

About the project

ÉLEVÉ by Deyaar is an 818-unit mixed-use residential tower in Downtown Jebel Ali on Sheikh Zayed Road. Deyaar is developing the project, which includes studios, one-, two- and three-bedroom residences and garden apartments. The project is active and reported at 15.70% completion, with handover scheduled for Q2 2027.

The project and its architecture

ÉLEVÉ by Deyaar is planned as one building with two basement levels, a ground floor, four podium levels, 33 floors and a roof. The scheme combines residential units, resident amenities and a retail component within the tower. Its architecture is described as contemporary, with a tall façade conceived in relation to the activity of Jebel Ali Port. A porte-cochère with drop-off leads to a natural-light lobby, while the building’s design includes podium-level amenity spaces. The project sits in Downtown Jebel Ali, a district within the Jebel Ali Industrial Area 2 sector of Dubai. Its position on Sheikh Zayed Road provides road access towards Dubai and Abu Dhabi. The development has 818 units in total.

Residences and interior features

The residence collection includes studios, one-bedroom residences, two-bedroom residences, three-bedroom residences and garden apartments. Private balconies are included in all units, with views described towards Jebel Ali Port and the surrounding neighbourhood. Kitchens are fitted with a hood, oven and hob. The range of layouts provides options from compact studio accommodation through to three-bedroom homes, alongside the garden-apartment category. ÉLEVÉ is a residential-led project within a mixed-use tower, with a retail component included in the building programme. The project is located near JAFZA and Jebel Ali Industrial Area, placing it within the Jebel Ali business and industrial corridor.

Amenities within ÉLEVÉ

The amenity programme includes a swimming pool and a separate kids pool, together with a gym and yoga terrace. Residents have access to a lobby and lounge, a residence lounge, a club room and a sports activities room. Outdoor seating areas form part of the shared facilities, and toilet and changing rooms are included alongside the leisure spaces. The amenity areas are arranged as part of the tower’s podium offering. The project also includes a porte-cochère drop-off and a natural-light lobby as arrival features. Two basement levels are dedicated to parking within the building configuration.

Downtown Jebel Ali location

ÉLEVÉ is located in Downtown Jebel Ali on Sheikh Zayed Road. The address provides road connections to Dubai and Abu Dhabi and places JAFZA and Jebel Ali Industrial Area nearby. Palm Jebel Ali and The Waterfront are each stated to be a 12-minute drive from the project. Expo Park is 5.4 km away, while Expo City Dubai is 6.2 km away. The Expo Water Feature is also 6.2 km away and Jubilee Park is 6.3 km away. Jebel Ali Golf Resort & Spa is 7.0 km from ÉLEVÉ. For shopping and cinema access, Novo Cinema at Ibn Battuta Mall is 7.8 km away. The wider neighbourhood map also identifies Jebel Ali Free Zone, DP World Headquarters, Dubai Parks & Resorts, Ibn Battuta Mall, The Outlet Village, Port Jebel Ali and Al Maktoum International Airport among the surrounding destinations.

Price, payment plan and handover

Prices at ÉLEVÉ by Deyaar start from AED 555,458. The payment plan is presented as a 70/30 structure with 1% monthly post-handover payments. The stated breakdown is 10% on booking, 50% during construction across the first to fourth instalments, 10% on handover at 100% completion and 30% post-handover within 30 months. This makes 70% payable through booking, construction and handover stages, followed by the remaining 30% after handover. Handover is scheduled for Q2 2027. Construction began on 31 October 2024. The project is active and its reported completion ratio is 15.70%.

Deyaar

ÉLEVÉ is developed by Deyaar. The project is located in Downtown Jebel Ali and forms part of Deyaar’s residential offering in the Jebel Ali corridor. Deyaar’s project programme at ÉLEVÉ comprises 818 units within one mixed-use tower. The development combines residential accommodation with a retail component and shared resident facilities. Its residence selection spans studios, one-, two- and three-bedroom residences, in addition to garden apartments. The scheduled Q2 2027 handover and the stated 70/30 payment structure define the delivery and payment framework for the project.

Frequent questions

Who is the developer of ÉLEVÉ by Deyaar?
ÉLEVÉ is developed by Deyaar.
Where is ÉLEVÉ by Deyaar located?
The project is in Downtown Jebel Ali on Sheikh Zayed Road.
What is the starting price at ÉLEVÉ by Deyaar?
Prices start from AED 555,458.
When is handover for ÉLEVÉ by Deyaar?
Handover is scheduled for Q2 2027.
What is the payment plan for ÉLEVÉ by Deyaar?
The plan is structured as 70/30: 10% on booking, 50% during construction, 10% on handover and 30% post-handover within 30 months.
What is the construction status of ÉLEVÉ by Deyaar?
The project is active and reported at 15.70% completion. Construction began on 31 October 2024.
What types of homes are available at ÉLEVÉ by Deyaar?
The project includes studios, one-, two- and three-bedroom residences, plus garden apartments.
How many units are in ÉLEVÉ by Deyaar?
ÉLEVÉ has 818 units in one mixed-use tower.
What is near ÉLEVÉ by Deyaar?
Palm Jebel Ali and The Waterfront are each a 12-minute drive away. Expo Park is 5.4 km away and Expo City Dubai is 6.2 km away.
How can I buy an apartment in Eleve by Deyaar?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details.

Project data comes from the Dubai Land Department (DLD) registry.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Eleve by Deyaar — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-25, https://continentalclub.ae/project/eleve-by-deyaar-downtown-jebel-ali/