by Damac Properties in Downtown Dubai
Volta Tower is a residential project by Damac Properties in Downtown Dubai, Dubai, with handover 31.12.2027, construction 20.8% complete per the DLD registry.
Construction progress
- Handover31.12.2027
- Status date11.04.2026
- DLD project number2782
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Damac Properties · District: Downtown Dubai
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 05.08.2026 | 2 BR | 64.7 | 1 589 754 |
| 27.07.2026 | 1 BR | 93.9 | 2 301 120 |
| 14.07.2026 | 1 BR | 64.3 | 1 977 000 |
| 07.07.2026 | 4 BR | 213.0 | 4 700 000 |
| 07.07.2026 | 1 BR | 32.4 | 968 875 |
| 29.06.2026 | 4 BR | 212.7 | 5 480 800 |
| 15.06.2026 | 1 BR | 93.9 | 2 150 000 |
| 11.05.2026 | 4 BR | 217.7 | 6 490 000 |
| 06.05.2026 | 1 BR | 100.8 | 2 481 600 |
| 01.04.2026 | 4 BR | 217.7 | 6 890 000 |
| 30.03.2026 | 1 BR | 100.8 | 2 595 000 |
| 25.03.2026 | 2 BR | 133.5 | 3 122 000 |
| 25.03.2026 | 2 BR | 128.2 | 3 173 839 |
| 05.03.2026 | 1 BR | 64.0 | 2 000 002 |
| 25.02.2026 | 2 BR | 127.6 | 3 346 000 |
| 23.02.2026 | 2 BR | 133.6 | 3 070 000 |
| 06.02.2026 | 2 BR | 131.3 | 3 376 000 |
| 26.12.2025 | 2 BR | 130.0 | 3 017 000 |
| 25.12.2025 | 1 BR | 64.5 | 2 021 000 |
| 17.12.2025 | 2 BR | 131.1 | 3 719 000 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Volta Tower is an active residential tower in Downtown Dubai, developed by Damac C S L Investment. The project started on 13 December 2023 and had reached 20.79% completion at its inspection on 11 April 2026. Completion is scheduled for 31 December 2027.
Volta Tower at a glance
Volta Tower is a one-building residential project in Downtown Dubai. The development has a recorded total area of 44,016.17 and comprises 417 units. Its active status reflects ongoing construction, with a completion ratio of 20.79% recorded on 11 April 2026. The project start date is 13 December 2023, and the scheduled completion date is 31 December 2027. Volta Tower sits within Downtown Dubai, the central mixed-use district built around Burj Khalifa and The Dubai Mall.
Tower and parking configuration
The residential tower is configured across one basement level, a ground floor, 62 upper floors and two roof levels. A separate adjacent parking building is configured across three basement levels, a ground floor, 12 upper floors and a roof level. The building design uses a concrete structure and blockwork, with internal and external finishes. The project is registered as a single building, with the residential tower and its adjacent parking structure forming the development configuration.
Downtown Dubai setting
Downtown Dubai is a high-density urban district centred on Burj Khalifa and The Dubai Mall. The area combines residential towers, hotels, retail and leisure uses, with pedestrian promenades and the Dubai Fountain among its defining features. Volta Tower is positioned in a district that also connects to Business Bay and the Dubai International Financial Centre. Residential and hotel developments are concentrated along the boulevard and around Burj Park, while the wider district includes high-rise apartments, hotel-branded residences and mixed-use towers with retail podiums.
Nearby destinations
From central Downtown Dubai, Burj Khalifa is listed at 0.5 km and The Dubai Mall at 0.3 km. Business Bay is listed at 1.7 km, while the Dubai International Financial Centre is listed at 1.9 km. Dubai International Airport is listed at 10.9 km by road. Other listed road distances include 11.6 km to Mall of the Emirates, 14.2 km to Global Village, 16.8 km to Palm Jumeirah, 18.8 km to Dubai Marina, 19.5 km to JBR Beach, 29.2 km to Expo City Dubai and 35.2 km to Al Maktoum International Airport.
Transport connections
Downtown Dubai is served by Dubai Metro’s Red Line. Station R25 is listed at 1,143 metres from the core boulevard and is within walking distance. The Burj Khalifa / Dubai Mall metro interchange and its pedestrian links serve the district. Infrastructure work around this interchange has been intended to expand capacity for larger daily passenger volumes. Downtown Dubai’s street network and pedestrian boulevards connect residential and hotel buildings with retail, dining and cultural destinations across the district.
Construction progress and handover
Volta Tower is scheduled for completion on 31 December 2027. Construction began on 13 December 2023. The most recent recorded inspection took place on 11 April 2026, when construction completion was recorded at 20.79%. The project is classified as active. These dates place the development in its construction phase, with the scheduled completion date set at the end of 2027.
Developer
Volta Tower is developed by Damac C S L Investment. The developer is associated with the project from its start date of 13 December 2023 through its scheduled completion date of 31 December 2027. Damac C S L Investment is the name used for the developer of Volta Tower in Downtown Dubai.


























