Volta Tower is a residential project by Damac Properties in Downtown Dubai, Dubai, with handover 31.12.2027, construction 20.8% complete per the DLD registry.

Construction20.8%

Construction progress

20.79%
  • Handover31.12.2027
  • Status date11.04.2026
  • DLD project number2782

Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).

Construction progress 31
11 April 2026 20.79%
Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 1 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 2 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 3 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 4 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 5 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 6 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 7 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 8 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 9 of 10Volta Tower, Downtown Dubai construction progress — 11 April 2026, 20.79% complete, photo 10 of 10

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
05.08.20262 BR64.71 589 754
27.07.20261 BR93.92 301 120
14.07.20261 BR64.31 977 000
07.07.20264 BR213.04 700 000
07.07.20261 BR32.4968 875
29.06.20264 BR212.75 480 800
15.06.20261 BR93.92 150 000
11.05.20264 BR217.76 490 000
06.05.20261 BR100.82 481 600
01.04.20264 BR217.76 890 000
30.03.20261 BR100.82 595 000
25.03.20262 BR133.53 122 000
25.03.20262 BR128.23 173 839
05.03.20261 BR64.02 000 002
25.02.20262 BR127.63 346 000
23.02.20262 BR133.63 070 000
06.02.20262 BR131.33 376 000
26.12.20252 BR130.03 017 000
25.12.20251 BR64.52 021 000
17.12.20252 BR131.13 719 000

Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →

About the project

Volta Tower is an active residential tower in Downtown Dubai, developed by Damac C S L Investment. The project started on 13 December 2023 and had reached 20.79% completion at its inspection on 11 April 2026. Completion is scheduled for 31 December 2027.

Volta Tower at a glance

Volta Tower is a one-building residential project in Downtown Dubai. The development has a recorded total area of 44,016.17 and comprises 417 units. Its active status reflects ongoing construction, with a completion ratio of 20.79% recorded on 11 April 2026. The project start date is 13 December 2023, and the scheduled completion date is 31 December 2027. Volta Tower sits within Downtown Dubai, the central mixed-use district built around Burj Khalifa and The Dubai Mall.

Tower and parking configuration

The residential tower is configured across one basement level, a ground floor, 62 upper floors and two roof levels. A separate adjacent parking building is configured across three basement levels, a ground floor, 12 upper floors and a roof level. The building design uses a concrete structure and blockwork, with internal and external finishes. The project is registered as a single building, with the residential tower and its adjacent parking structure forming the development configuration.

Downtown Dubai setting

Downtown Dubai is a high-density urban district centred on Burj Khalifa and The Dubai Mall. The area combines residential towers, hotels, retail and leisure uses, with pedestrian promenades and the Dubai Fountain among its defining features. Volta Tower is positioned in a district that also connects to Business Bay and the Dubai International Financial Centre. Residential and hotel developments are concentrated along the boulevard and around Burj Park, while the wider district includes high-rise apartments, hotel-branded residences and mixed-use towers with retail podiums.

Nearby destinations

From central Downtown Dubai, Burj Khalifa is listed at 0.5 km and The Dubai Mall at 0.3 km. Business Bay is listed at 1.7 km, while the Dubai International Financial Centre is listed at 1.9 km. Dubai International Airport is listed at 10.9 km by road. Other listed road distances include 11.6 km to Mall of the Emirates, 14.2 km to Global Village, 16.8 km to Palm Jumeirah, 18.8 km to Dubai Marina, 19.5 km to JBR Beach, 29.2 km to Expo City Dubai and 35.2 km to Al Maktoum International Airport.

Transport connections

Downtown Dubai is served by Dubai Metro’s Red Line. Station R25 is listed at 1,143 metres from the core boulevard and is within walking distance. The Burj Khalifa / Dubai Mall metro interchange and its pedestrian links serve the district. Infrastructure work around this interchange has been intended to expand capacity for larger daily passenger volumes. Downtown Dubai’s street network and pedestrian boulevards connect residential and hotel buildings with retail, dining and cultural destinations across the district.

Construction progress and handover

Volta Tower is scheduled for completion on 31 December 2027. Construction began on 13 December 2023. The most recent recorded inspection took place on 11 April 2026, when construction completion was recorded at 20.79%. The project is classified as active. These dates place the development in its construction phase, with the scheduled completion date set at the end of 2027.

Developer

Volta Tower is developed by Damac C S L Investment. The developer is associated with the project from its start date of 13 December 2023 through its scheduled completion date of 31 December 2027. Damac C S L Investment is the name used for the developer of Volta Tower in Downtown Dubai.

FAQ

Who is the developer of Volta Tower?
Volta Tower is developed by Damac C S L Investment.
Where is Volta Tower located?
Volta Tower is located in Downtown Dubai. The district is centred on Burj Khalifa and The Dubai Mall.
What is the current construction status of Volta Tower?
Volta Tower is active. It was 20.79% complete at the inspection dated 11 April 2026.
When is Volta Tower scheduled for completion?
The scheduled completion date is 31 December 2027.
When did construction of Volta Tower start?
The project start date is 13 December 2023.
How many units are planned at Volta Tower?
Volta Tower comprises 417 units.
What is the building configuration of Volta Tower?
The residential tower has one basement, a ground floor, 62 upper floors and two roof levels. An adjacent parking building has three basements, a ground floor, 12 upper floors and a roof level.
What is near Volta Tower in Downtown Dubai?
From central Downtown Dubai, Burj Khalifa is listed at 0.5 km and The Dubai Mall at 0.3 km. Business Bay and DIFC are listed at 1.7 km and 1.9 km respectively.
Is there metro access from Downtown Dubai?
Downtown Dubai is served by the Dubai Metro Red Line. Station R25 is listed at 1,143 metres from the core boulevard.