Developer: Damac Properties · Lagoon Views

Sorrento

Sorrento is a residential project by Damac Properties in Lagoon Views, Dubai, with indicative prices from AED 728 000 (estimate from DLD sales; developer price not yet published), handover Q1 2030, construction 0.3% complete per the DLD registry, 672 units.

Price fromAED 728 000Our calculationEstimate: median of DLD sales, last 12 months, studios, Lagoon Views. Developer price not yet published.
Unit typesStudio · 1 BR390–864 ft²DLD registry
HandoverQ1 2030Developer supplied
Construction0.3%DLD registry · checked 08.09.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio360390–499
1 Bedroom306710–864
Other units6420–604

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 728 000 AED is 3 074 AED.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

0.25%
  • Construction started15.07.2026
  • HandoverQ1 2030
  • Status date08.09.2026
  • Progress between DLD inspections+0.25% (04.02.2026 → 08.09.2026)
  • Escrow bankADCB
  • DLD project number4381

Data from the Dubai Land Department project registry (updated 12.11.2026 05:55).

Inspection history 2
025507510004.02.202608.09.2026
Actual, per inspections

Pace: 0.04% per month. At this rate we do not project a completion date: it falls more than 10 years out.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 22
08.09.2026 0.25%
Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 1 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 2 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 3 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 4 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 5 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 6 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 7 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 8 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 9 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 10 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 11 of 12Sorrento, Lagoon Views construction progress — 8 September 2026, 0.25% complete, photo 12 of 12
04.02.2026 0.00%
Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 1 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 2 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 3 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 4 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 5 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 6 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 7 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 8 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 9 of 10Sorrento, Lagoon Views construction progress — 4 February 2026, 0.00% complete, photo 10 of 10

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

PDF shortlist · updated 1 November 2026

Dubai new projects under AED 1 million

30 projects · prices from DLD and developers

  1. The WOW Tower The WOW Tower DubaiLand Residence Complex · Studio, 1–2 BR from AED 709,000
  2. Vue By Crystal Bay Vue By Crystal Bay Jumeirah Village Circle · Studio, 1–3 BR from AED 584,000
  3. Soul By Vision Soul By Vision Dubai Production City · Studio, 1–3 BR from AED 602,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

Your broker for this project

Tetiana Karpenko

Tetiana Karpenko

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Sorrento: current availability, payment plan, DLD registration. English and Russian.

Sorrento

About the project

Sorrento is an active residential project by Damac Properties in Lagoon Views, within Damac Lagoons in Dubai. The project has 672 units and a recorded total area of 36,992.00. Its completion date is scheduled for 31 January 2030, with construction commencement dated 15 July 2026.

Sorrento at a glance

Sorrento is registered as project number 4381 and is located in Lagoon Views, a subcommunity within Damac Lagoons. The project is active, with a completion ratio of 0.00 recorded at the inspection dated 4 February 2026. It has 672 units and a total area of 36,992.00. Damac Properties is the developer. The recorded programme places the construction start date on 15 July 2026 and the completion date on 31 January 2030. These dates position Sorrento as a planned residential development within the Lagoon Views setting.

The Lagoon Views setting

Lagoon Views forms part of the Damac Lagoons district in Dubai. The community is organised around a central man-made lagoon and landscaped open spaces, with mid-rise residential buildings designed to look towards the water and surrounding landscape. Its architectural concept draws on Mediterranean references, including curved exterior forms, water features and terraces. Community descriptions also refer to light-filled interiors and neutral finishes. The wider Lagoon Views scheme is described as comprising 22 mid-rise apartment buildings arranged around the central lagoon and landscaped public spaces. Concept material presents a low-to-mid-rise residential environment focused on shared outdoor areas and waterfront outlooks.

Shared spaces in Lagoon Views

The Lagoon Views concept includes landscaped gardens, beach settings beside the lagoon and communal leisure areas. Named features in the community material include an olive tree garden and landscaped beauty hills. The wider leisure offer also references beach-club-style facilities, a tapas lounge, honey bar and a pool bar with floating pods. Music festivals and foam parties are included within the event programming shown for the community. These facilities and events are presented as part of the Lagoon Views lifestyle concept around its lagoon, outdoor spaces and landscaped areas. The project imagery and concept designs may change during delivery.

Access to Dubai destinations

Lagoon Views is within the Damac Lagoons area of Dubai. Listed road distances include 9.5 km to Expo City Dubai, 10.6 km to Global Village, 12.2 km to Dubai Marina, 12.6 km to JBR Beach and 12.8 km to Mall of the Emirates. Palm Jumeirah is listed at 14.9 km, while Al Maktoum International Airport is listed at 14.0 km. Downtown Dubai is listed at 21.7 km, The Dubai Mall at 21.9 km and Dubai International Financial Centre at 23.5 km. Dubai International Airport is listed at 30.7 km. The nearest identified Dubai Metro Red Line access is station R73, at a listed distance of 6,782 metres.

Schools and the local area

Two schools are identified in locality information for Lagoon Views. South View School is listed at 1.8 km, while Royal Grammar School Guildford in Dubai is listed at 2.8 km. The community itself is planned around engineered water features, landscaped surroundings and leisure-oriented communal areas. Lagoon Views is described as a themed residential neighbourhood made up of distinct precincts within Damac Lagoons. Its second phase has been described as including one- and two-bedroom waterfront apartments, while the broader community concept places residential blocks around the lagoon and shared landscaped spaces. Sorrento is positioned within this Lagoon Views district.

Development timeline and current status

Sorrento is recorded as active. Its inspection date is 4 February 2026, when the recorded completion ratio was 0.00. The recorded construction start date is 15 July 2026, and the scheduled completion date is 31 January 2030. The project contains 672 units. The programme information provides a defined construction and completion timetable for buyers reviewing the project’s delivery schedule. Lagoon Views concept material includes a notice that development details and imagery can change during delivery, so the final delivered project may differ from early concept representations.

The developer

Damac Properties is the developer of Sorrento. The project is located in Lagoon Views and is registered under project number 4381. The developer is associated with a project comprising 672 units, with a recorded total area of 36,992.00. Sorrento’s recorded construction timeline runs from 15 July 2026 to 31 January 2030. The project sits in a lagoon-centred residential setting within Damac Lagoons, where the community plan includes mid-rise buildings, landscaped public spaces and shared leisure facilities.

Frequent questions

Who is the developer of Sorrento?
Sorrento is developed by Damac Properties.
Where is Sorrento located?
Sorrento is located in Lagoon Views, within the Damac Lagoons district in Dubai.
What is the current completion status of Sorrento?
Sorrento is active, with a recorded completion ratio of 0.00 at the inspection dated 4 February 2026.
When is Sorrento scheduled for completion?
The recorded completion date for Sorrento is 31 January 2030.
When is construction scheduled to start at Sorrento?
The recorded construction start date is 15 July 2026.
How many units are in Sorrento?
Sorrento has 672 units.
What is near Sorrento in Lagoon Views?
Expo City Dubai is listed at 9.5 km, Global Village at 10.6 km and Dubai Marina at 12.2 km from Lagoon Views.
What schools are listed near Lagoon Views?
South View School is listed at 1.8 km and Royal Grammar School Guildford in Dubai at 2.8 km.
How can I buy an apartment in Sorrento?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

More projects by Damac Properties

All 202 projects by Damac Properties →

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Sorrento — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/sorrento-lagoon-views/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.