Developer: The Palm - Jebel Ali Co · Palm Jebel Ali

Palm Jebel Ali – The Beach And Coral Collection – Frond F

Palm Jebel Ali – The Beach And Coral Collection – Frond F is a residential project by Nakheel in Palm Jebel Ali, Dubai, with handover 04.12.2028, construction 1.3% complete per the DLD registry.

Construction1.3%

Payment plan 80/20

20%60%20%
  • Down payment20%
  • During construction60%
  • On handover20%

Construction progress

1.29%
  • Handover04.12.2028
  • Status date13.07.2026
  • DLD project number4128

Data from the Dubai Land Department project registry (updated 14.08.2026 09:55).

Construction progress 8
13 July 2026 1.29%
Palm Jebel Ali - The Beach And Coral Collection - Frond F, Palm Jebel Ali construction progress — 13 July 2026, 1.29% complete, photo 1 of 3Palm Jebel Ali - The Beach And Coral Collection - Frond F, Palm Jebel Ali construction progress — 13 July 2026, 1.29% complete, photo 2 of 3Palm Jebel Ali - The Beach And Coral Collection - Frond F, Palm Jebel Ali construction progress — 13 July 2026, 1.29% complete, photo 3 of 3

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Palm Jebel Ali – The Beach And Coral Collection – Frond F

About the project

Palm Jebel Ali – The Beach And Coral Collection – Frond F is a residential villa development in Palm Jebel Ali. The Palm – Jebel Ali Co is developing 44 G+2 villas with five-, six- and seven-bedroom layouts. The project is active, with a 1.29% completion ratio recorded on 13 July 2026 and completion scheduled for 4 December 2028.

The project at Frond F

The Beach And Coral Collection – Frond F forms part of Palm Jebel Ali, the man-made island development on Dubai’s coastline. This residential project comprises 44 villas, each configured as ground level plus two floors. Its address on Frond F places it within a waterfront island masterplan planned around residential, hospitality and leisure uses. The project start date is 5 December 2025, and the scheduled completion date is 4 December 2028. Construction status is active, with a 1.29% completion ratio recorded at the inspection dated 13 July 2026.

Villa collection and bedroom mix

The collection consists exclusively of villas rather than apartments. Of the 44 homes, five are five-bedroom villas, 25 are six-bedroom villas and 14 are seven-bedroom villas. Every residence is described as a G+2 villa, providing three levels comprising a ground floor and two upper floors. The mix gives the project three defined villa configurations, with six-bedroom homes representing the largest share of the collection. Palm Jebel Ali is planned for luxury beachfront homes and family-oriented waterfront neighbourhoods, placing this villa release within a residential island setting.

Construction programme and completion

The development commenced on 5 December 2025. Its scheduled completion date is 4 December 2028. At the inspection on 13 July 2026, the project had reached a 1.29% completion ratio and held active status. The programme is therefore set against a defined start and completion schedule for the 44-villa development. The Beach And Coral Collection – Frond F is one of the villa projects within Palm Jebel Ali, where marine works, roads, utilities and public-access infrastructure form part of the wider island’s development activity.

Palm Jebel Ali masterplan

Palm Jebel Ali is a 13.4-square-kilometre waterfront island masterplan planned to add 110 kilometres of coastline. The wider development is designed with public beaches, parks, waterfront neighbourhoods and a central spine intended to include civic elements, including a mosque designed by Skidmore, Owings & Merrill. The masterplan includes residential, hospitality and leisure uses, with more than 80 hotels and resorts planned across the island. It is intended to accommodate 35,000 families and incorporates sustainability and smart-city measures, including renewable-energy targets. Frond F sits within this larger coastal development.

Road access and Dubai connections

Palm Jebel Ali is being connected through dedicated infrastructure works, including a public access road from Sheikh Zayed Road, alongside local road and lighting improvements. The nearest Dubai Metro Red Line station is R42, 10.7 km from Palm Jebel Ali and not within comfortable walking distance. Distance references from Palm Jebel Ali place Dubai Marina at 17.4 km, JBR Beach at 16.7 km and Palm Jumeirah at 19.3 km. Al Maktoum International Airport is 21.1 km away, while Downtown Dubai is 35.8 km away and Dubai International Airport is 46.9 km away.

Island infrastructure and waterfront works

Palm Jebel Ali’s wider construction programme includes marine works covering dredging, land reclamation, beach profiling and sand placement. Island infrastructure works include utilities, roads and public-access improvements, while electrical substations are planned through agreements with DEWA. Contracts have also been awarded for villas across six fronds, covering 544 villas, and for 723 ultra-luxury villas on the first six fronds. These works sit alongside the development of beachfront homes, resort facilities and public waterfront areas across the island.

The developer

The Palm – Jebel Ali Co is the developer of Palm Jebel Ali – The Beach And Coral Collection – Frond F. The company is delivering this 44-villa project at Palm Jebel Ali, with a scheduled completion date of 4 December 2028. The wider Palm Jebel Ali development is a large-scale waterfront island project with residential, hospitality and leisure components, public beaches, parks and planned road-access improvements.

Frequent questions

Who is the developer of Palm Jebel Ali - The Beach And Coral Collection - Frond F?
The developer is The Palm - Jebel Ali Co.
Where is The Beach And Coral Collection - Frond F located?
The project is located on Frond F in Palm Jebel Ali, Dubai.
How many villas are in the project?
The development comprises 44 G+2 villas.
What bedroom types are available?
The collection includes five five-bedroom villas, 25 six-bedroom villas and 14 seven-bedroom villas.
What is the current construction status?
The project is active. Its completion ratio was 1.29% at the inspection dated 13 July 2026.
When is handover scheduled?
The scheduled completion date is 4 December 2028.
When did construction start?
The project start date is 5 December 2025.
What is near Palm Jebel Ali?
Dubai Marina is 17.4 km from Palm Jebel Ali, JBR Beach is 16.7 km away and Al Maktoum International Airport is 21.1 km away.
Is there Metro access at Palm Jebel Ali?
The nearest Dubai Metro Red Line station is R42, located 10.7 km from Palm Jebel Ali.
How can I buy an apartment in Palm Jebel Ali - The Beach And Coral Collection - Frond F?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details.

Project data comes from the Dubai Land Department (DLD) registry.

Request
Request