Developer: Nakheel · Palm Jebel Ali

Palm Central Private Residences – Frond M

Palm Central Private Residences – Frond M is a residential project by Nakheel in Palm Jebel Ali, Dubai, with prices from AED 2 544 000, handover Q3 2029, construction 0.1% complete per the DLD registry, 212 apartments, 212 sold to first buyers per the DLD register (as of 13 Nov 2026).

Price fromAED 2 544 000Our calculation
Unit types1–5 BR738–9 797 ft²DLD registry
HandoverQ3 2029Developer supplied
Construction0.1%DLD registry · checked 15.09.2026

Layouts and sizes

TypeUnitsTypical size, sq.ft
1 Bedroom72738–843
2 Bedroom721 234–1 860
3 Bedroom482 046–3 213
4 Bedroom163 782–4 613
5 Bedroom44 813–9 797

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: 1 Bedroom — ~93 sq.ft (8.6 m²); 2 Bedroom — ~99 sq.ft (9.2 m²); 3 Bedroom — ~229 sq.ft (21 m²); 4 Bedroom — ~1097 sq.ft (102 m²); 5 Bedroom — ~2033 sq.ft (189 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Unit availability · DLD data as of 13 Nov 2026

fewer than 10 of 212 apartments available

Sold to first buyers 212 (100%)Available fewer than 10

TypeTotalSoldAvailable
1 bedroom72720
2 bedrooms72720
3 bedrooms48480
4+ bedrooms20200
Total2122120

Sales data comes from the official Dubai Land Department (DLD) register. Please confirm actual availability with our sales team — leave a request.

Tap an apartment type in the table to add it to your request.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

“Available” means units without a registered sale; resales are excluded.

Down payment

Compare with similar projects

Price, handover, payment plan and DLD deals side by side with the 3 closest projects — one table, no sign-up.

Compare with 3 closest Ask a broker on WhatsApp

Handover date & construction progress

0.08%
  • Construction started02.01.2026
  • HandoverQ3 2029
  • Status date15.09.2026
  • Progress between DLD inspections+0.06% (08.06.2026 → 15.09.2026)
  • Escrow bankFirst Abu Dhabi Bank
  • DLD project number4156

Data from the Dubai Land Department project registry (updated 16.11.2026 05:55).

Inspection history 3
025507510021.10.202515.09.2026
Actual, per inspections

The register shows the same percentage as at the inspection on 21.10.2025.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 47
15.09.2026 0.08%
Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 1 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 2 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 3 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 4 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 5 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 6 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 7 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 8 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 9 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 10 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 11 of 12Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 15 September 2026, 0.08% complete, photo 12 of 12
08.06.2026 0.02%
Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 1 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 2 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 3 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 4 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 5 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 6 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 7 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 8 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 9 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 10 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 11 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 12 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 13 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 14 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 15 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 16 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 17 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 18 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 19 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 20 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 21 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 22 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 23 of 24Palm Central Private Residences - Frond M, Palm Jebel Ali construction progress — 8 June 2026, 0.02% complete, photo 24 of 24

11 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Palm Central Private Residences – Frond M

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

213DLD registrations incl. resales, since 2025
37 551AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom782 853 00036 57772
2 bedrooms1164 481 00038 62973
3 bedrooms1957 873 00040 37448
4 bedrooms36114 176 00039 26916

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
11.05.20262 BR14.0555 300
16.03.20263 BR191.17 644 000
04.03.20261 BR77.02 901 000
03.03.20261 BR68.52 513 000
23.02.20265 B/R447.117 582 000
18.02.20261 BR68.52 544 000
18.02.20261 BR77.72 882 000
18.02.20262 BR114.94 364 000
18.02.20261 BR68.92 543 000
18.02.20263 BR274.28 586 000
17.02.20264 BR360.812 655 000
17.02.20261 BR68.82 514 000
16.02.20262 BR114.94 343 000
16.02.20263 BR191.17 644 000
16.02.20261 BR68.52 544 000
12.02.20262 BR142.25 551 000
12.02.20264 BR360.512 623 000
12.02.20264 BR360.812 781 000
12.02.20262 BR114.64 322 000
11.02.20261 BR68.82 558 000
10.02.20262 BR174.85 868 000
09.02.20262 BR115.14 331 000
09.02.20262 BR115.54 515 000
09.02.20263 BR316.98 705 000
06.02.20262 BR115.74 610 000
06.02.20261 BR77.72 846 000
06.02.20261 BR68.92 537 000
06.02.20262 BR174.85 869 000
06.02.20262 BR136.35 824 000
05.02.20262 BR136.35 795 000
05.02.20263 BR190.17 518 000
05.02.20261 BR78.32 920 000
05.02.20261 BR68.82 577 000
05.02.20261 BR77.72 853 000
05.02.20263 BR191.17 682 000
05.02.20263 BR197.37 885 000
05.02.20262 BR126.75 252 000
05.02.20261 BR78.32 920 000
05.02.20264 BR412.916 814 000
05.02.20262 BR182.55 949 000
05.02.20262 BR114.94 343 000
05.02.20263 BR190.17 705 000
05.02.20264 BR412.916 814 000
05.02.20265 B/R910.131 809 000
05.02.20262 BR115.14 331 000
20.01.20262 BR114.94 364 000
20.01.20264 BR400.413 767 000
19.01.20261 BR68.82 546 000
19.01.20261 BR77.02 859 000
19.01.20262 BR114.64 343 000

Dubai Land Department transaction registry, updated 16.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 2 544 000 AED is 10 743 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Shared Pool
  • Shared Gym
  • Security
  • Covered Parking
  • Lobby in Building
  • Children's Pool
  • Barbecue Area
  • Concierge
Palm Central Private Residences – Frond M

Your broker for this project

Vladimir Malin

Vladimir Malin

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Palm Central Private Residences – Frond M: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Palm Central Private Residences – Frond M is a 212-apartment residential project on Frond M in Palm Jebel Ali. It is being developed by Nakheel. The project is active, with a recorded completion ratio of 2% and a completion date of 31 July 2029.

Palm Central Private Residences – Frond M

Palm Central Private Residences – Frond M is positioned within Palm Jebel Ali, on Frond M. The project has 212 apartments and a registered total area of 33,733.95. Its project number is 4156. The development started on 2 January 2026 and is scheduled for completion on 31 July 2029. The recorded construction status is Active. Its completion ratio is 2%, based on an inspection dated 8 June 2026. Palm Central forms part of the wider Palm Jebel Ali island development, which is planned as a waterfront district with residential, hospitality and leisure uses.

Construction status and completion date

The project is in its active development phase. The recorded start date is 2 January 2026, while the stated completion date is 31 July 2029. The recorded completion ratio is 2%. These project milestones place Palm Central Private Residences – Frond M within the ongoing build-out of Palm Jebel Ali. The island’s development includes marine works, utilities, roads and public-access infrastructure, alongside residential precincts on its fronds. Palm Central is one of the private-residence releases within this wider coastal development. The project has 212 apartments registered under project number 4156.

Palm Jebel Ali setting

Palm Jebel Ali is a man-made island development in Dubai with a masterplan covering 13.4 square kilometres. The island is planned to add 110 kilometres of coastline and to include waterfront homes, hotels, resorts, public beaches, parks and leisure uses. Its residential areas are arranged across several fronds and precincts, including Frond M. The wider plan also includes walkable mixed-use neighbourhoods, green space and a central spine with civic elements. Palm Jebel Ali is intended to accommodate residential and hospitality development, with waterfront neighbourhoods planned for 35,000 families and more than 80 hotels and resorts across the island.

Coastline, public realm and island infrastructure

The Palm Jebel Ali masterplan places public beaches, parks and waterfront neighbourhoods alongside private residential areas. Marine infrastructure for the island includes dredging, land reclamation, beach profiling and sand placement. Roads, lighting, utilities and public-access works form part of the wider infrastructure programme. Electrical substations are also planned for the island. A public access road from Sheikh Zayed Road to Palm Jebel Ali is included in the road infrastructure works. The island masterplan also incorporates sustainability and smart-city measures, with renewable-energy targets intended to supply a significant share of the island’s needs. These elements relate to the wider Palm Jebel Ali development surrounding Frond M.

Distances from Palm Jebel Ali

Palm Jebel Ali is 17.4 km from Dubai Marina and 16.7 km from JBR Beach. Palm Jumeirah is 19.3 km away, while Mall of the Emirates is 24.8 km from the island. Al Maktoum International Airport is 21.1 km away. Downtown Dubai and Burj Khalifa are 35.8 km from Palm Jebel Ali, and The Dubai Mall is 36.3 km away. Dubai International Airport is 46.9 km from the island. These distances describe Palm Jebel Ali as a whole, the location of Palm Central Private Residences – Frond M.

Road and metro access

Palm Jebel Ali is served by planned road infrastructure, including a public access road from Sheikh Zayed Road and improvements to local roads and lighting. The nearest Dubai Metro Red Line station is R42, 10.7 km from Palm Jebel Ali. The island sits outside the immediate metro network. Its transport planning therefore includes road-access and infrastructure works as part of the wider island programme. Palm Central Private Residences – Frond M is located on Frond M within this island setting. The project’s location places it within a development planned around waterfront districts, beaches, parks, homes, hospitality facilities and leisure uses.

The developer

Nakheel is the developer of Palm Central Private Residences – Frond M. The company is delivering a 212-apartment project in Palm Jebel Ali with a stated completion date of 31 July 2029. Palm Central is part of the residential releases within Palm Jebel Ali, a large-scale coastal development that combines fronds, waterfront neighbourhoods and island infrastructure. The wider island programme has included construction packages for villas, marine works, roads, utilities and public access. Palm Central Private Residences – Frond M is identified separately under project number 4156 and has a registered total area of 33,733.95.

Frequent questions

Who is the developer of Palm Central Private Residences - Frond M?
The developer is Nakheel.
Where is Palm Central Private Residences - Frond M located?
The project is located on Frond M in Palm Jebel Ali, Dubai.
How many units are in Palm Central Private Residences - Frond M?
The project has 212 apartments.
When is the Palm Central Private Residences - Frond M handover date?
Palm Central Private Residences - Frond M handover (completion) is scheduled for Q3 2029 (developer data). The DLD register lists 31 July 2029. Construction progress was 0.08% at the DLD inspection of 15 September 2026. The date and progress on this page are updated from the DLD register. For current availability, prices and resale (assignment) options, send an enquiry on this page.
What is the construction status of Palm Central Private Residences - Frond M?
The project is active. Its recorded completion ratio is 2%.
When did construction start at Palm Central Private Residences - Frond M?
The recorded start date is 2 January 2026.
What is near Palm Jebel Ali?
Dubai Marina is 17.4 km away, JBR Beach is 16.7 km away and Al Maktoum International Airport is 21.1 km from Palm Jebel Ali.
Is there metro access to Palm Jebel Ali?
The nearest Dubai Metro Red Line station is R42, 10.7 km from Palm Jebel Ali.
How many apartments are left in Palm Central Private Residences – Frond M?
According to the Dubai Land Department (DLD) register, as of 13 Nov 2026 fewer than 10 of 212 apartments in Palm Central Private Residences – Frond M have no registered sale; 212 have been sold to first buyers (100%). This is registry data, not a developer availability list: please confirm current availability and prices with our sales team — leave a request on this page.
How can I buy an apartment in Palm Central Private Residences - Frond M?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Palm Central Private Residences – Frond M between 19 Jan 2026 and 11 May 2026: median 37 546 AED/m² (3 488 AED/sq ft); half of the deals fell between 36 684 and 39 493 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
1 BRAED 2 557 0001637 10868.9
2 BRAED 4 375 0001837 944115.3
3 BRAED 7 642 000839 990191.1
4 BRAED 13 415 000635 247380.6
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Dubai new projects AED 2–5 million

30 projects · prices from DLD and developers

  1. Sands Phase 2 by Ellington Sands Phase 2 by Ellington Deira Central · 1–4 BR from AED 2,600,000
  2. The Cape The Cape Majan · 1–4 BR from AED 3,550,000
  3. South Bay 2 South Bay 2 South Bay 2 from AED 3,675,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Palm Central Private Residences – Frond M worth?

212 of 212 apartments have been sold to first buyers per the DLD register. DLD registrations, including resales: 213 (since 2025). We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Nakheel

All 55 projects by Nakheel →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Palm Central Private Residences – Frond M — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-01, https://continentalclub.ae/project/palm-central-private-residences-frond-m-palm-jebel-ali/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.