Developer: Sobha Group · Sobha Central

Mirage at Sobha Central

Mirage at Sobha Central is a residential project by Sobha Group in Sobha Central, Dubai, with prices from AED 1 950 000, handover Q4 2030, construction 2.4% complete per the DLD registry, 2169 units, 634 DLD-registered sales since 2026.

Price fromAED 1 950 000Developer supplied
HandoverQ4 2030Developer suppliedDLD registry: 31.12.2031
Construction2.4%DLD registry · checked 29.09.2026
Units2 169DLD registry
DLD sales634 since 2026DLD registry
Median sale priceAED 34 875/m²Our calculation
Mortgage~AED 8 230/moOur calculation

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

Residence types

  • 1 Bedroom
  • 2 Bedroom

Payment plan 60/40

The purchase price is split into these stages.

120%Down payment
240%During construction
340%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 1 950 000 AED is 8 234 AED.

Calculate mortgage

Estimates only; not a bank approval.

Handover date & construction progress

2.38%
  • Construction started31.03.2026
  • HandoverQ4 2030
  • Status date29.09.2026
  • Progress between DLD inspections+2.38% (16.01.2026 → 29.09.2026)
  • Escrow bankDubai Islamic Bank
  • DLD project number4328

Data from the Dubai Land Department project registry (updated 11.10.2026 09:55).

Inspection history 2
025507510016.01.202629.09.2026
Actual, per inspections

Pace: 0.28% per month. At this rate 100% falls on 29.06.2055.

The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.

Construction progress 11
29.09.2026 2.38%
Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 1 of 7Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 2 of 7Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 3 of 7Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 4 of 7Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 5 of 7Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 6 of 7Mirage at Sobha Central, Sobha Central construction progress — 29 September 2026, 2.38% complete, photo 7 of 7
16.01.2026 0.00%
Mirage at Sobha Central, Sobha Central construction progress — 16 January 2026, 0.00% complete, photo 1 of 4Mirage at Sobha Central, Sobha Central construction progress — 16 January 2026, 0.00% complete, photo 2 of 4Mirage at Sobha Central, Sobha Central construction progress — 16 January 2026, 0.00% complete, photo 3 of 4Mirage at Sobha Central, Sobha Central construction progress — 16 January 2026, 0.00% complete, photo 4 of 4

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
08.10.20261 BR52.51 804 472
08.10.20262 BR92.73 217 615
05.10.20261 BR56.71 968 959
05.10.20261 BR52.51 779 057
05.10.20261 BR56.71 953 344
05.10.20261 BR56.71 968 959
05.10.20261 BR56.71 953 344
05.10.20261 BR52.41 800 351
05.10.20261 BR56.71 959 801
05.10.20261 BR56.71 968 959
05.10.20261 BR56.71 968 959
05.10.20261 BR63.32 215 135
05.10.20262 BR92.73 193 344
05.10.20262 BR92.73 208 313
05.10.20262 BR100.63 518 223
05.10.20262 BR100.63 518 223
05.10.20262 BR100.93 530 800
05.10.20262 BR100.93 530 800
05.10.202698.46 883 175
05.10.20262 BR100.63 518 223
01.10.20261 BR56.71 968 605
29.09.20262 BR92.73 208 313
29.09.202680.16 033 790
29.09.202670.95 344 360
29.09.20262 BR92.73 193 344
29.09.20261 BR56.71 953 344
29.09.20261 BR52.41 800 351
28.09.20261 BR52.51 812 944
28.09.202679.25 965 260
25.09.20261 BR56.71 968 605
25.09.20261 BR56.71 959 801
25.09.20261 BR52.41 800 351
24.09.20261 BR59.92 093 642
24.09.20261 BR56.71 968 605
24.09.20261 BR56.71 953 344
23.09.20261 BR52.51 779 057
23.09.20263 BR173.05 770 991
23.09.20261 BR52.51 796 000
23.09.20261 BR56.71 968 605
22.09.20262 BR92.73 193 344
22.09.20262 BR92.73 247 546
22.09.20261 BR52.51 779 057
21.09.20261 BR62.52 187 478
21.09.20261 BR56.72 005 591
18.09.20261 BR52.51 787 529
18.09.20261 BR52.51 812 944
18.09.20261 BR56.71 978 117
17.09.20262 BR100.93 530 800
17.09.20262 BR100.63 518 223
17.09.20261 BR56.72 000 000

Dubai Land Department transaction registry, updated 10.10.2026. Explore Dubai property transactions →

Registered transactions in Mirage at Sobha Central

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

634deals since 2026
34 875AED per m², median
0%resale, the rest bought from the developer

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
1 bedroom602 015 86633 598445
2 bedrooms933 208 31334 498121
3 bedrooms1735 770 99133 35820

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

How much is your property in Mirage at Sobha Central worth?

DLD has recorded 634 sales in this building since 2026. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details.

Amenities

  • Children’s pool
  • Lap pool
  • Leisure pool
  • Jacuzzi
  • Outdoor exercise space
  • Jogging track
  • Mini putt-putt course
  • Football ground
  • Cricket batting enclosure
  • Calisthenic gym
  • Ornamental garden
  • Sensory garden
  • Fragrance garden
  • Medicinal garden
  • Open plaza with water feature and sculpture
  • Outdoor courtyard
  • Outdoor sitting area pockets
  • Seating tree courtyard
  • Artificial turf play mounds
  • Activity mound
  • Climbing walls
  • Family barbecue gathering space
  • Dog park
  • Gym
  • Yoga studio
  • Steam and sauna with changing rooms
  • Multipurpose hall
  • Children’s play area
  • Library
  • Leisure lounge
  • Fitness studio and spinning room
  • Indoor theatre
  • Meditation room / time free zones
  • Business centre
  • Outdoor games
  • Open activity / picnic / event lawn
  • Main activity boulevard
  • Café
  • Spa
  • Salon
  • Adventure mounds
  • Barbecue pavilion
  • Projection lounge
  • Co-working lounge
  • Dedicated workspace
  • Grand Prayer Hall
  • Boutique mall
  • Retail promenade
  • Landscaped courtyards
  • Garden sanctuaries
  • Resident-only lobbies
Mirage at Sobha Central

About the project

Mirage at Sobha Central is a new-launch apartment development by Sobha Group within Sobha Central on Sheikh Zayed Road in Dubai. The project offers one- and two-bedroom residences as part of a six-tower mixed-use setting with retail, office and community spaces. Handover is scheduled for Q4 2030.

The project within Sobha Central

Mirage forms part of Sobha Central, a development of six connected architectural towers positioned along Sheikh Zayed Road. The wider scheme combines residences with office, retail and commercial areas, supported by landscaped courtyards and shared community facilities. Mirage is planned as a 63-level residential tower with a contemporary glass façade and a podium structure below. The project is designed with access from two dedicated lanes and a fly-out bridge from the second-floor podium. A dedicated ramp serves traffic arriving from Abu Dhabi, while a separate ramp provides a U-turn route from Dubai. The community also includes 175,000 sq. ft. of office space, creating a residential and commercial component within the same address.

Apartment selection and living spaces

Mirage at Sobha Central offers one-bedroom and two-bedroom apartments. The residences are planned with open-concept layouts, large windows and balcony access. Views described for the homes include the Arabian Gulf, the landscaped community, Jumeirah Islands and the Dubai Marina skyline. Interior specifications include premium fittings and fixtures, with soft and elegant tones forming part of the planned finish. The apartment collection is located above the community podium, which is planned to contain gardens, activity areas, retail and resident facilities. Buyers can choose from the two available bedroom configurations within a high-rise residential setting on Sheikh Zayed Road.

Pools, fitness and community facilities

The amenity programme includes a lap pool, leisure pool, children’s pool and jacuzzi. Fitness facilities comprise a gym, yoga studio, fitness studio and spinning room, calisthenic gym, outdoor exercise space and jogging track. Outdoor sports and recreation areas include a football ground, cricket batting enclosure, mini putt-putt course, outdoor games, climbing walls and artificial-turf play mounds. Gardens include ornamental, sensory, fragrance and medicinal gardens, alongside landscaped courtyards and garden sanctuaries. Further planned facilities include a children’s play area, indoor theatre, library, leisure lounge, meditation room, multipurpose hall, barbecue spaces, dog park, café, spa and salon. Business and work spaces include a business centre, co-working lounge and dedicated workspace, while retail areas include a boutique mall and retail promenade.

Sheikh Zayed Road setting

Sobha Central is positioned on Sheikh Zayed Road, with a nearby metro connection and private road access through the community’s dedicated lanes and fly-out bridge. Sheikh Zayed Road connects the address with Downtown Dubai, DIFC, Dubai Marina and Palm Jebel Ali. Dubai Marina is listed among the nearby destinations, and the project is planned with panoramic views across the Dubai Marina area. Local leisure destinations include Roxy Cinema at The Beach, 1.7 km away, and Reel Cinemas at Dubai Marina Mall, 1.9 km away. The Walk JBR and Switch Bowling are each 2.1 km from the project, while Madame Tussauds is 2.2 km away. Emirates Golf Club is 4.2 km away and Montgomerie Golf Course is 4.5 km away.

Payment plan and handover

Apartments at Mirage at Sobha Central start from AED 1.95 million. The published payment structure is 60/40: 20% is due on booking, 40% is payable during construction across the first to fourth instalments, and the remaining 40% is due on handover. The scheduled handover is Q4 2030, stated as December 2030. The project is currently at new-launch stage. This structure allocates 60% of the purchase price before handover and 40% at completion, with the construction-stage payments following the initial booking payment.

Sobha Group

Mirage at Sobha Central is developed by Sobha Group. Founded in 1976 in Oman, Sobha Group has a portfolio of residential and commercial projects in the UAE, Oman, Bahrain, Brunei and India. The company has delivered more than 13 million sq. ft. of real estate. Its organisation includes an in-house design studio and an independent quality-control department that reports directly to the company’s founder and head, Mr. Menon. At Sobha Central, Sobha Group is delivering a mixed-use development that brings residences, office space, retail areas, landscaped zones and community facilities together along Sheikh Zayed Road.

Service charge: what to expect

The building is still under construction, so it has no RERA-approved budget yet — that comes after handover. The figures below are what already-completed buildings in the area pay.

Area median15.13 AEDper sq ft per year · 163 AED/m²
Range in the area2.31 – 20.99AED per sq ft · 68 buildings
A 1,000 sq ft unit≈ 15,130 AEDper year at the median · ≈ $4,120
vs Dubai median▼ -5.5%Dubai 16.01 AED/sq ft

Check the charge for a specific building →

Median across 68 completed buildings in Sobha Central for 2026, from the DLD service charge index (Mollak). This is an area benchmark, not this project’s rate: RERA approves that after handover and it may land either side of the median.

Frequent questions

Who is the developer of Mirage at Sobha Central?
Mirage at Sobha Central is developed by Sobha Group.
Where is Mirage at Sobha Central located?
The project is located in Sobha Central on Sheikh Zayed Road in Dubai. It has a nearby metro connection and dedicated road access.
What types of apartments are available at Mirage at Sobha Central?
The project offers one-bedroom and two-bedroom apartments.
What is the starting price at Mirage at Sobha Central?
Prices start from AED 1.95 million.
What is the payment plan for Mirage at Sobha Central?
The payment plan is 60/40: 20% on booking, 40% during construction and 40% on handover.
When is handover for Mirage at Sobha Central?
Handover is scheduled for Q4 2030, stated as December 2030.
What is the construction status of Mirage at Sobha Central?
Mirage at Sobha Central is at new-launch stage.
What amenities are planned at Mirage at Sobha Central?
Facilities include multiple pools, a gym, yoga studio, jogging track, sports areas, gardens, children’s play spaces, business centre, co-working lounge, library, theatre, retail promenade and boutique mall.
What is nearby Mirage at Sobha Central?
Roxy Cinema at The Beach is 1.7 km away, Reel Cinemas at Dubai Marina Mall is 1.9 km away, and The Walk JBR is 2.1 km away.
How can I buy an apartment in Mirage at Sobha Central?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details.

Project data comes from the Dubai Land Department (DLD) registry.

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Mirage at Sobha Central — Continental Club Property, from Dubai Land Department registry and developer data, 2026-10-10, https://continentalclub.ae/project/mirage-at-sobha-central-sobha-central/