by Emaar Properties in Rashid Yachts and Marina
Fior 1 is a residential project by Emaar Properties in Rashid Yachts and Marina, Dubai, with handover 31.07.2030, 184 units.
Construction progress
- StatusActive
- Handover31.07.2030
- Status date11.12.2025
- DLD project number4287
Data from the Dubai Land Department project registry (updated 08.08.2026 10:48).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Emaar Properties · District: Rashid Yachts & Marina
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 05.08.2026 | 2 BR | 125.0 | 3 751 888 |
| 05.08.2026 | 1 BR | 72.0 | 2 288 888 |
| 05.08.2026 | 1 BR | 72.0 | 2 283 888 |
| 03.08.2026 | 2 BR | 111.1 | 3 285 888 |
| 03.08.2026 | 1 BR | 72.0 | 2 297 888 |
| 31.07.2026 | 2 BR | 111.1 | 3 260 888 |
| 28.07.2026 | 1 BR | 70.6 | 2 238 888 |
| 27.07.2026 | 1 BR | 70.6 | 2 238 888 |
| 27.07.2026 | 1 BR | 70.6 | 2 247 888 |
| 27.07.2026 | 2 BR | 106.0 | 4 550 030 |
| 23.07.2026 | 1 BR | 70.6 | 2 247 888 |
| 09.07.2026 | 2 BR | 109.3 | 3 195 829 |
| 09.07.2026 | 2 BR | 111.1 | 3 213 310 |
| 09.07.2026 | 2 BR | 106.0 | 4 633 888 |
| 29.06.2026 | 1 BR | 72.0 | 2 310 888 |
| 18.06.2026 | 1 BR | 70.6 | 2 243 888 |
| 17.06.2026 | 2 BR | 109.3 | 3 236 888 |
| 11.06.2026 | 1 BR | 72.0 | 2 306 888 |
| 11.06.2026 | 1 BR | 82.8 | 3 045 888 |
| 11.06.2026 | 1 BR | 70.6 | 2 211 750 |
Dubai Land Department transaction registry, updated 2026-08-07. Explore Dubai property transactions →
About the project
Fior 1 is an active 184-unit project by Emaar Properties at Rashid Yachts & Marina, on Dubai Creek near Bur Dubai and Deira. Its recorded completion ratio is 0.00%, with a project completion date of 31 July 2030.
Fior 1 at Rashid Yachts & Marina
Fior 1 forms part of Rashid Yachts & Marina, the waterfront redevelopment of Mina Rashid. The project has 184 total units and occupies a site area of 19,770.59 square metres. Rashid Yachts & Marina combines residential development with marina, hospitality, retail, dining and leisure elements. The precinct is arranged around waterfront promenades, a swimmable canal and public spaces, with the Arabian Gulf and Downtown Dubai skyline forming part of its wider outlook. The QE2, permanently docked as a hotel and exhibition venue, is a maritime landmark within the precinct.
The waterfront masterplan
Rashid Yachts & Marina is being developed as a marina-led waterfront district on Dubai Creek. Its masterplan includes mid-rise waterfront residences, townhouses, hospitality components, piazzas and promenades. A 500-metre palm-fringed swimmable canal and a 12,600-square-metre sandy beach are included within the precinct. The district also incorporates parkland, art and cultural venues, interconnected public areas, retail and dining facilities. A pedestrian bridge connects the area with the House of Sheikh Saeed Al Maktoum and its associated museum and theatre. The Hamdan bin Mohammed Cruise Terminal at Port Rashid provides berth-side services for visiting yachts and cruise ships.
Marina and leisure setting
The marina at Rashid Yachts & Marina has more than 430 wet berths and can accommodate yachts up to 100 metres in length. Berthing options include short stays as well as seasonal and annual arrangements. The waterfront programme includes a floating yacht club, a beach club, hotels and public promenades. Retail, dining and leisure uses are planned along the waterfront, alongside residential areas. The site brings together Port Rashid’s maritime heritage with new marina and waterfront facilities, while the QE2 remains a focal point of the district. These elements establish the setting in which Fior 1 is located.
Location within Dubai
Rashid Yachts & Marina is located on Dubai Creek near Bur Dubai and Deira. The nearby Dubai Metro Green Line includes station G24, which is 661 metres from the site. Dubai Mall is reached in 16 minutes by car, while Dubai International Airport is 17 minutes away by car. Palm Jumeirah is 28 minutes away, Burj Al Arab is 26 minutes away, and The Walk at JBR is 32 minutes away. Al Maktoum International Airport is 53 minutes away by car. The location also places the project within the Port Rashid waterfront and cruise-terminal area.
Project status and completion
Fior 1 is recorded as Active. The completion ratio is 0.00%, and the recorded project start date is 15 June 2026. The completion date is 31 July 2030. The project is registered under number 4287 and has 184 total units. These dates establish the current recorded development timetable for Fior 1. Buyers considering the project can use the completion date as the stated point of reference for its delivery schedule.
Developer
Emaar Properties is the developer of Fior 1. Emaar is also leading the broader Rashid Yachts & Marina redevelopment in partnership with P&O Marinas. Within the precinct, P&O Marinas operates the Hamdan bin Mohammed Cruise Terminal and is involved with marina and berthing facilities. Fior 1 is therefore positioned within a waterfront district that combines residential development with Port Rashid’s existing cruise and marina infrastructure.















