Damac Hills (2) – Farmhouses is a residential project by Damac Properties in Damac Hills 2, Dubai, with handover 28.08.2025, construction 83% complete per the DLD registry.
Floor plans
Construction progress
- Handover28.08.2025
- Status date14.05.2026
- DLD project number2543
Data from the Dubai Land Department project registry (updated 12.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Damac Properties · District: Damac Hills 2
Recent transactions
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 27.10.2025 | 1 009.9 | 7 800 000 | |
| 19.06.2024 | 1 876.0 | 11 007 360 | |
| 08.02.2024 | 799.1 | 6 221 000 | |
| 16.01.2024 | 1 875.8 | 11 465 000 | |
| 20.12.2023 | 2 096.8 | 11 845 000 | |
| 15.11.2023 | 1 009.9 | 7 131 460 | |
| 09.11.2023 | 958.7 | 6 968 780 | |
| 06.11.2023 | 1 865.3 | 11 097 000 | |
| 02.11.2023 | 870.5 | 6 506 220 | |
| 25.10.2023 | 893.2 | 6 900 000 | |
| 24.10.2023 | 1 875.5 | 11 130 000 | |
| 24.10.2023 | 863.6 | 6 617 000 | |
| 02.10.2023 | 872.0 | 6 511 120 | |
| 26.09.2023 | 871.6 | 6 643 000 |
Dubai Land Department transaction registry, updated 2026-08-11. Explore Dubai property transactions →
About the project
Damac Hills (2) – Farmhouses is a residential project of 13 G+1 villas in Damac Hills 2, within Madinat Hind 4, Dubai. It is developed by Front Line Investment Management. The project is active, with construction completion recorded at 83.02% on 14 May 2026.
The project
Damac Hills (2) – Farmhouses comprises 13 G+1 villas. The project has a recorded total area of 16,727.78. Construction began on 19 September 2023, and the recorded project completion date is 28 August 2025. Its current status is active. The villas are specified with a concrete structure and blockwork, together with internal and external finishes. The project is located in Madinat Hind 4, a part of the wider Damac Hills 2 residential community in south Dubai Land. As of 14 May 2026, the recorded construction completion ratio is 83.02%.
Villa configuration and construction
The development is composed entirely of villas, with each home configured across ground and first floors. This G+1 format places the project within a villa-led community that also includes townhouse and apartment developments across its wider masterplan. The construction specification identifies a concrete structural system and blockwork, followed by internal and external finishes. There are 13 villas in total, making this a limited residential collection within Damac Hills 2. The project’s recorded area is 16,727.78, covering the overall development rather than individual villa dimensions.
Damac Hills 2 setting
Damac Hills 2 is a master-planned residential community in the southern sector of Dubai Land. The community is primarily villa-led and is arranged across 42 sub-communities, including The Farmhouses, Verona, Park Greens, Odora, Natura and Violet. Internal roads are in place, and several residential clusters have already been handed over, while development continues in other parts of the masterplan. The community includes leisure and sports facilities, water-based leisure areas and a bird aviary. Its environmental and mobility provisions include bicycle and hybrid-vehicle spaces, energy-efficient building systems, low-emission finishes, solar water heating, and facilities for waste separation and recycling.
Road access and nearby destinations
Damac Hills 2 is positioned south of Dubai’s main city centre, with road connections forming the principal means of access. Downtown Dubai and Burj Khalifa are 25.6 km from the community, while The Dubai Mall is 25.5 km away. Dubai International Airport is 29.3 km away and Al Maktoum International Airport is 25.0 km away. Other listed destinations include Mall of the Emirates at 23.5 km, Dubai Marina at 26.8 km, JBR Beach at 27.4 km and Palm Jumeirah at 28.4 km. The nearest Dubai Metro station on the Red Line is 22.7 km from Damac Hills 2.
Construction status and project dates
The project is recorded as active. Work started on 19 September 2023, and the recorded completion date is 28 August 2025. The latest construction progress figure is 83.02%, based on an inspection dated 14 May 2026. The project record was updated on 22 May 2026. These details relate specifically to Damac Hills (2) – Farmhouses rather than the wider Damac Hills 2 masterplan, where completed residential clusters sit alongside continuing construction of homes, roads and community infrastructure.
The developer
Front Line Investment Management is the developer of Damac Hills (2) – Farmhouses. The project is located within Damac Hills 2, a master-planned community developed by Damac Properties. Damac Hills 2 has been planned around low-density villa clusters, named sub-communities and leisure spaces, with a mixture of completed and developing residential areas. Farmhouses forms one of the project and cluster names within this wider community.