Gallery

On map

Damac Hills (2) – Farmhouses

Damac Hills (2) – Farmhouses is a residential project by Damac Properties in Damac Hills 2, Dubai, with handover 28.08.2025, construction 83% complete per the DLD registry.

Construction83%

Construction progress

83.02%
  • Handover28.08.2025
  • Status date14.05.2026
  • DLD project number2543

Data from the Dubai Land Department project registry (updated 12.08.2026 09:55).

Construction progress 32
14 May 2026 83.02%
Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 1 of 7Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 2 of 7Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 3 of 7Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 4 of 7Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 5 of 7Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 6 of 7Damac Hills (2) - Farmhouses, Damac Hills 2 construction progress — 14 May 2026, 83.02% complete, photo 7 of 7

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Recent transactions

DateTypeSize, m²Price, AED
27.10.20251 009.97 800 000
19.06.20241 876.011 007 360
08.02.2024799.16 221 000
16.01.20241 875.811 465 000
20.12.20232 096.811 845 000
15.11.20231 009.97 131 460
09.11.2023958.76 968 780
06.11.20231 865.311 097 000
02.11.2023870.56 506 220
25.10.2023893.26 900 000
24.10.20231 875.511 130 000
24.10.2023863.66 617 000
02.10.2023872.06 511 120
26.09.2023871.66 643 000

Dubai Land Department transaction registry, updated 2026-08-11. Explore Dubai property transactions →

About the project

Damac Hills (2) – Farmhouses is a residential project of 13 G+1 villas in Damac Hills 2, within Madinat Hind 4, Dubai. It is developed by Front Line Investment Management. The project is active, with construction completion recorded at 83.02% on 14 May 2026.

The project

Damac Hills (2) – Farmhouses comprises 13 G+1 villas. The project has a recorded total area of 16,727.78. Construction began on 19 September 2023, and the recorded project completion date is 28 August 2025. Its current status is active. The villas are specified with a concrete structure and blockwork, together with internal and external finishes. The project is located in Madinat Hind 4, a part of the wider Damac Hills 2 residential community in south Dubai Land. As of 14 May 2026, the recorded construction completion ratio is 83.02%.

Villa configuration and construction

The development is composed entirely of villas, with each home configured across ground and first floors. This G+1 format places the project within a villa-led community that also includes townhouse and apartment developments across its wider masterplan. The construction specification identifies a concrete structural system and blockwork, followed by internal and external finishes. There are 13 villas in total, making this a limited residential collection within Damac Hills 2. The project’s recorded area is 16,727.78, covering the overall development rather than individual villa dimensions.

Damac Hills 2 setting

Damac Hills 2 is a master-planned residential community in the southern sector of Dubai Land. The community is primarily villa-led and is arranged across 42 sub-communities, including The Farmhouses, Verona, Park Greens, Odora, Natura and Violet. Internal roads are in place, and several residential clusters have already been handed over, while development continues in other parts of the masterplan. The community includes leisure and sports facilities, water-based leisure areas and a bird aviary. Its environmental and mobility provisions include bicycle and hybrid-vehicle spaces, energy-efficient building systems, low-emission finishes, solar water heating, and facilities for waste separation and recycling.

Road access and nearby destinations

Damac Hills 2 is positioned south of Dubai’s main city centre, with road connections forming the principal means of access. Downtown Dubai and Burj Khalifa are 25.6 km from the community, while The Dubai Mall is 25.5 km away. Dubai International Airport is 29.3 km away and Al Maktoum International Airport is 25.0 km away. Other listed destinations include Mall of the Emirates at 23.5 km, Dubai Marina at 26.8 km, JBR Beach at 27.4 km and Palm Jumeirah at 28.4 km. The nearest Dubai Metro station on the Red Line is 22.7 km from Damac Hills 2.

Construction status and project dates

The project is recorded as active. Work started on 19 September 2023, and the recorded completion date is 28 August 2025. The latest construction progress figure is 83.02%, based on an inspection dated 14 May 2026. The project record was updated on 22 May 2026. These details relate specifically to Damac Hills (2) – Farmhouses rather than the wider Damac Hills 2 masterplan, where completed residential clusters sit alongside continuing construction of homes, roads and community infrastructure.

The developer

Front Line Investment Management is the developer of Damac Hills (2) – Farmhouses. The project is located within Damac Hills 2, a master-planned community developed by Damac Properties. Damac Hills 2 has been planned around low-density villa clusters, named sub-communities and leisure spaces, with a mixture of completed and developing residential areas. Farmhouses forms one of the project and cluster names within this wider community.

FAQ

Who is the developer of Damac Hills (2) - Farmhouses?
Front Line Investment Management is the developer of Damac Hills (2) - Farmhouses.
Where is Damac Hills (2) - Farmhouses located?
The project is in Madinat Hind 4 within Damac Hills 2, in the southern sector of Dubai Land.
How many homes are in Damac Hills (2) - Farmhouses?
The project comprises 13 villas.
What type of properties are offered at Damac Hills (2) - Farmhouses?
The development consists of G+1 villas with concrete structure and blockwork, internal finishes and external finishes.
What is the construction status of Damac Hills (2) - Farmhouses?
The project is active. Its recorded construction completion ratio was 83.02% on 14 May 2026.
When did construction start at Damac Hills (2) - Farmhouses?
The recorded project start date is 19 September 2023.
What is the recorded completion date for Damac Hills (2) - Farmhouses?
The recorded project completion date is 28 August 2025.
What is available within Damac Hills 2?
The wider community includes leisure and sports facilities, water-based leisure areas, a bird aviary, bicycle and hybrid-vehicle spaces, and provisions for waste separation and recycling.
How far is Damac Hills 2 from Downtown Dubai?
Downtown Dubai and Burj Khalifa are 25.6 km from Damac Hills 2. The Dubai Mall is 25.5 km away.
How can I buy an apartment in Damac Hills (2) - Farmhouses?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Nearby projects

Request
Request