Developer: Damac Properties · Dubai South Residential District

Damac Celestia Tower B

Damac Celestia Tower B is a residential project by Damac Properties in Dubai South Residential District, Dubai, with prices from AED 435 000, construction 100% complete per the DLD registry, 972 units, 1 437 DLD-registered sales since 2014.

Price fromAED 435 000Developer supplied
Unit typesStudio · 1 · 2 BR433–1 382 sq.ftDLD registry
StatusReadyDLD registry

Layouts and sizes

TypeUnitsTypical size, sq.ft
Studio587436–536
Studio (hotel apt.)48433–466
1 Bedroom259784–1 056
1 Bedroom (hotel apt.)9763–988
2 Bedroom591 111–1 382
2 Bedroom (hotel apt.)31 111–1 122
Retail7379–1 835

Size range excludes the smallest and largest 5% of units of each type.

All units are freehold. Data from the DLD registry.

Balcony or terrace per the DLD registry: almost every residential unit (98%). Typical balcony size: Studio — ~55 sq.ft (5.1 m²); 1 Bedroom — ~100 sq.ft (9.3 m²); 2 Bedroom — ~133 sq.ft (12 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Units for sale in Damac Celestia Tower B

AED 1,000,000 · 1 bedroom

How much is your property in Damac Celestia Tower B worth?

DLD has recorded 1 437 sales in this building since 2014, 694 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

100%
  • StatusReady
  • Construction started01.06.2014
  • HandoverReady To Move in
  • Status date07.08.2019
  • Escrow bankEmirates NBD
  • Scale5 bldg
  • DLD project number1487

Data from the Dubai Land Department project registry (updated 27.11.2026 05:55).

Inspection history 14
025507510014.12.201407.08.2019
Actual, per inspections
Construction progress 120
07.08.2019 100.00%
Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 1 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 2 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 3 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 4 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 5 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 6 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 7 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 7 August 2019, 100.00% complete, photo 8 of 8
18.10.2018 97.52%
Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 1 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 2 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 3 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 4 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 5 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 6 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 7 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 8 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 9 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 18 October 2018, 97.52% complete, photo 10 of 10
03.06.2018 95.06%
Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 1 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 2 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 3 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 4 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 5 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 6 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 7 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 8 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 9 of 10Damac Celestia Tower B, Dubai South Residential District construction progress — 3 June 2018, 95.06% complete, photo 10 of 10
31.01.2018 91.55%
Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 1 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 2 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 3 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 4 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 5 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 6 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 7 of 8Damac Celestia Tower B, Dubai South Residential District construction progress — 31 January 2018, 91.55% complete, photo 8 of 8

84 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Buying a ready unit: pre-purchase inspection

Damac Celestia Tower B is completed. Buying a ready unit here? Before you pay the deposit we check 110 points: finishes, plumbing, electrics and A/C, with a photo report within 24 hours. Fixed price from 749 AED.

Snagging inspection: prices and scope

Registered transactions in Damac Celestia Tower B

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

1 437deals since 2014
10 846AED per m², median
48%resale, the rest bought from the developer
+4%over the past year
7.6%gross rental yield

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +1% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio42553 00013 167955
Shop46854 00018 5656
1 bedroom83625 0007 530386
2 bedrooms104949 0009 12590

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2022 to 2025 — +59% on the price per square metre in this building. The district moved +129% over the same period, so the building lagged the market.

15 4512014——
15 6782015——
15 1852016——
14 5812017——
13 4712018——
7 1832019——
8 0792020——
8 23220214885.9%
7 28420225617.7%
7 31120236639.1%
9 24920248058.7%
11 61420259027.8%
11 9672026*9057.6%

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
25.11.2026Studio41.0500 000
20.11.2026Studio41.9507 000
28.10.20261 BR92.3840 000
23.10.2026Studio42.2495 000
22.10.20262 BR105.61 050 000
20.10.2026Studio40.9445 000
15.10.20261 BR76.7875 000
05.10.2026Studio41.7540 000
01.10.20261 BR90.6890 000
28.09.2026Studio40.9550 000
28.09.2026Studio41.4475 000
28.09.2026Studio40.9475 000
28.09.2026Studio40.8475 000
24.09.2026Studio41.2520 000
24.09.2026Studio43.0520 000
21.09.20261 BR127.81 000 000
17.09.2026Studio41.7490 000
16.09.2026Studio41.0505 000
20.08.20262 BR103.81 275 000
19.08.20261 BR99.4950 000
18.08.2026Studio40.5510 000
17.08.20262 BR103.21 200 000
30.07.2026Studio41.7505 000
13.07.20261 BR78.7835 000
07.07.2026Studio41.4499 000
26.06.2026Studio41.2495 000
18.06.2026Studio41.8499 990
11.06.2026Studio42.9550 000
11.06.2026Studio41.6499 999
11.06.2026Studio41.0475 000
04.06.2026Studio45.9525 000
21.05.2026Studio43.3617 280
13.05.2026Studio48.8565 000
08.05.20261 BR78.8890 000
06.05.2026Studio40.8540 000
06.05.2026Studio40.8550 000
23.04.2026Studio41.6580 000
21.04.20261 BR83.1890 000
21.04.20261 BR83.4965 000
16.04.20262 BR104.11 170 000
14.04.2026Studio40.9525 000
10.04.20261 BR77.5890 000
08.04.2026Studio40.9530 000
07.04.20261 BR90.6882 836
06.04.2026Studio40.9530 000
02.04.2026Studio41.7450 000
31.03.2026Studio41.4530 000
31.03.2026Studio45.2540 000
31.03.2026Studio41.7535 000
30.03.20262 BR103.31 000 000
Rentals — 20
DateTypeSize, m²Rent, AED/yr
26.11.2026Studio41.640 000
26.11.2026Studio41.845 500
26.11.2026Studio41.534 650
26.11.2026Studio40.940 000
25.11.20261bed room+Hall78.756 000
25.11.20261bed room+Hall83.153 000
24.11.2026Studio49.545 000
22.11.2026Studio42.243 000
20.11.2026Studio43.339 889
20.11.20262 bed rooms+hall103.373 000
16.11.20262 bed rooms+hall104.174 000
16.11.20261bed room+Hall75.965 500
16.11.20261bed room+Hall71.860 000
16.11.2026Studio40.245 000
15.11.2026Studio41.642 000
15.11.2026Studio40.845 000
15.11.20261bed room+Hall78.658 000
15.11.20261bed room+Hall91.160 000
15.11.2026Studio41.642 000
15.11.2026Studio41.835 000

Dubai Land Department transaction registry, updated 26.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 435 000 AED is 1 837 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Health and fitness club
  • Swimming pool
Damac Celestia Tower B

Your broker for this project

Elena Orlova

Elena Orlova

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Damac Celestia Tower B: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Damac Celestia Tower B is a finished deluxe serviced-apartment building in Dubai South Residential District. It is developed by Damac Properties and forms part of Celestia, with a 2B+G+7 building configuration. The project is 100% complete and ready to move in.

The project

Damac Celestia Tower B is a serviced-apartment project in Dubai South Residential District. Its registered building configuration comprises two basement levels, a ground floor and seven upper floors, with internal and external finishes. The project is listed with 972 units. Celestia’s accommodation includes deluxe rooms, one-bedroom suites and two-bedroom suites. The completed project combines serviced living with suites that include a separate living room and dining area. DAMAC Maison de Ville Hotels & Resorts manages the serviced accommodation. The project is ready to move in, with a recorded completion date of 7 August 2019.

Residences and in-home features

The available residence formats are deluxe rooms, one-bedroom suites and two-bedroom suites. Celestia apartments are also described as studios and one- and two-bedroom apartments. Reported apartment sizes range from 425 sq ft to 1,357 sq ft. Suites include fitted kitchens with a washer, dryer, oven, refrigerator and microwave. Free WiFi is included in the stated suite features, alongside separate living and dining areas. These features position the residences as serviced accommodation rather than conventional unfurnished apartments. The current starting price for Damac Celestia Tower B is AED 435,000.

Health and leisure facilities

The development includes a health and fitness club and a swimming pool. Further listed leisure and fitness facilities include a gym, sauna, spa and leisure pool. Residents also have access to jogging tracks, cycling tracks and sports facilities. A basketball court, tennis courts, cricket field and children’s playgrounds are included among the listed facilities. The project’s amenities also include indoor parking, a kids’ play area and 24-hour security. Retail outlets, restaurants and a supermarket are listed within the wider amenity offering. The combination of fitness, recreation, parking and on-site services forms the stated facility provision for Celestia.

Dubai South Residential District location

Damac Celestia Tower B is located in Dubai South Residential District, within the wider Dubai South masterplan. The project has access to Dubai Metro Route 2020 and direct access to Al Maktoum International Airport. Al Maktoum International Airport, Jebel Ali Port, Dubai Metro and the Expo 2020 site are identified as nearby destinations. Expo City Dubai is 5.4 km away. South District Park is 1.1 km away, DSRC Central Park is 1.3 km away and Pulse Pond Park is 1.9 km away. Jumeirah Golf Estates Golf Course is 8.1 km away, while The Els Golf Club and Trump International Golf Club are each 9.9 km away.

Completion and purchase position

Damac Celestia Tower B is finished, with a 100.00% completion ratio. The recorded project completion date is 7 August 2019, and the current handover status is ready to move in. This means buyers can consider completed accommodation rather than a future construction-stage delivery. The project began on 1 June 2014. The current starting price is AED 435,000. Payment-plan information is available on request.

Damac Properties

Damac Properties is the developer of Damac Celestia Tower B. The company was founded in 1982 and has been constructing real-estate projects in the Middle East for more than 20 years. Its operations also extend to Saudi Arabia, Jordan, Lebanon, Qatar, Turkey and the United Kingdom. At Celestia, the accommodation is managed by DAMAC Maison de Ville Hotels & Resorts. The project’s developer identity is presented as Damac Properties, including across its Dubai South location and serviced-apartment offering. Damac Celestia Tower B is one of the completed residential projects in Dubai South Residential District.

Service charge, 2026

Approved rate15.04 AED▲ +2.0% per sq ft per year · 162 AED/m²
General / reserve fund14.48 / 0.56AED/sq ft
vs Dubai South median▼ -12.6%median 17.21 · rank 11/38
A 1,000 sq ft unit≈ 15,040 AEDper year · ≈ $4,095

Managed by Luxury Owner Association Management Services Co. · budget 1 Jan 2026 — 31 Dec 2026

History, budget breakdown and nearby buildings →

RERA-approved budget from the DLD service charge index (Mollak) for “Celestia”. Total is the general and reserve funds; additional charges are separate.

Frequent questions

Who is the developer of Damac Celestia Tower B?
Damac Celestia Tower B is developed by Damac Properties. The serviced accommodation is managed by DAMAC Maison de Ville Hotels & Resorts.
Where is Damac Celestia Tower B located?
The project is in Dubai South Residential District, within Dubai South. It has access to Dubai Metro Route 2020 and direct access to Al Maktoum International Airport.
What is the starting price at Damac Celestia Tower B?
The current starting price is AED 435,000.
Is Damac Celestia Tower B ready to move in?
Yes. The project is finished, 100% complete and ready to move in.
When was Damac Celestia Tower B completed?
The recorded completion date is 7 August 2019.
What apartment types are available at Damac Celestia Tower B?
The accommodation includes deluxe rooms, one-bedroom suites and two-bedroom suites. Celestia is also described as offering studios and one- and two-bedroom apartments.
What amenities does Damac Celestia Tower B offer?
Listed facilities include a health and fitness club, swimming pool, gym, sauna, spa, jogging tracks, cycling tracks, sports facilities and children’s playgrounds.
What is near Damac Celestia Tower B?
South District Park is 1.1 km away, DSRC Central Park is 1.3 km away and Expo City Dubai is 5.4 km away. Al Maktoum International Airport, Jebel Ali Port and Dubai Metro are also identified as nearby.
What is the payment plan for Damac Celestia Tower B?
Payment-plan information is available on request.
How can I buy an apartment in Damac Celestia Tower B?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Damac Celestia Tower B between 30 Mar 2026 and 25 Nov 2026: median 11 842 AED/m² (1 100 AED/sq ft); half of the deals fell between 11 321 and 12 614 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 502 0003412 11541.4
1 BRAED 885 0001110 61783.4
2 BRAED 1 167 000511 241103.8
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

Dubai South Residential District: new projects and prices

30 projects · prices from DLD and developers

  1. The Eighty Three The Eighty Three Dubai South Residential District · 1–2 BR from AED 464,083
  2. Waada - Altura 1 Waada - Altura 1 Dubai South Residential District from AED 470,000
  3. Waada - Altura 2 Waada - Altura 2 Dubai South Residential District · Studio, 1–2 BR from AED 475,000

27 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

More projects by Damac Properties

All 196 projects by Damac Properties →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Damac Celestia Tower B — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-26, https://continentalclub.ae/project/damac-celestia-tower-b-dubai-south-residential-district/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.