Developer: OKSA Developer · Dubai South Residential District
The Eighty Three is a residential project by OKSA Developer in Dubai South Residential District, Dubai, with prices from AED 464 083, handover Q4 2026, construction 60% complete per the DLD registry, 70 units.
| Type | Size, sq.ft |
|---|---|
| 1 Bedroom | 773–1 248 |
| 2 Bedroom | 975–1 808 |
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: OKSA Developer · District: Dubai South Residential District
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 01.07.2026 | Studio | 35.5 | 556 325 |
| 23.06.2026 | 1 BR | 63.4 | 900 000 |
| 19.05.2026 | Studio | 34.2 | 585 000 |
| 16.04.2026 | 2 BR | 108.1 | 1 414 083 |
| 17.03.2026 | Studio | 34.4 | 501 500 |
| 10.03.2026 | Studio | 34.4 | 586 000 |
| 16.02.2026 | Studio | 35.5 | 595 000 |
| 04.02.2026 | 2 BR | 83.6 | 1 100 000 |
| 04.02.2026 | 2 BR | 108.5 | 1 400 000 |
| 26.01.2026 | 2 BR | 120.4 | 1 165 000 |
| 26.01.2026 | Studio | 35.1 | 540 500 |
| 06.01.2026 | 1 BR | 63.3 | 905 000 |
| 23.12.2025 | 2 BR | 83.6 | 1 104 500 |
| 16.12.2025 | 2 BR | 130.8 | 1 800 000 |
| 12.12.2025 | 2 BR | 119.2 | 1 155 000 |
| 01.12.2025 | 2 BR | 107.2 | 1 348 300 |
| 26.11.2025 | 2 BR | 87.5 | 1 123 650 |
| 18.11.2025 | 1 BR | 62.0 | 841 700 |
| 03.11.2025 | 2 BR | 83.6 | 1 150 000 |
| 03.11.2025 | 2 BR | 125.9 | 1 161 551 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +3% over the same period, so the building lagged.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 34 | 529 083 | 15 561 | 21 |
| 1 bedroom | 71 | 950 000 | 13 380 | 8 |
| 2 bedrooms | 106 | 1 251 300 | 11 805 | 19 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

The Eighty Three is a single residential building by OKSA Developer in Dubai South Residential District. The development contains 70 units across a G+4+roof configuration, with studios and one- and two-bedroom apartments. It is active, with construction completion recorded at 50.29% and handover scheduled for Q4 2026.
The Eighty Three is a six-storey residential development configured as ground level, four additional floors and a roof level. Its 70 homes comprise studios, one-bedroom apartments and two-bedroom apartments. The residences are designed with contemporary architecture and semi-equipped kitchens. Layouts are described as broad, with an emphasis on space and natural light. The project sits within Dubai South Residential District, the residential component of the wider Dubai South masterplan. This district is positioned to serve the surrounding economic, logistics and aviation precincts, including the area around Al Maktoum International Airport.
Buyers can choose from studio, one-bedroom and two-bedroom apartment types at The Eighty Three. Semi-equipped kitchens form part of the residential specification. The building’s design combines contemporary architecture with layouts intended to create space and admit natural light. With 70 homes in one building, the development is a compact residential scheme rather than a multi-building community. The G+4+roof structure places all residences and shared facilities within the same project building in Dubai South Residential District.
The Eighty Three includes an infinity pool, swimming pool, fitness centre and gymnasium. Outdoor and social facilities include sunken seating, barbecue areas, a children’s play area, jogging trails, running track and cycling trails. The amenity offering also includes 24-hour security, indoor parking and covered parking facilities. Retail outlets, restaurants, a supermarket and a health care centre are listed among the project’s facilities. These features combine fitness, recreation, outdoor activity and everyday convenience within the development.
The Eighty Three is located in Dubai South Residential District, within the broader Dubai South masterplan. Pulse Community Park 2 is 0.2 km from the project, while Pulse Beachfront Park is 0.5 km away and Pulse Community Park 1 is 0.6 km away. Expo City Dubai is 7.5 km from The Eighty Three. Nearby golf destinations include Jumeirah Golf Estates Golf Course at 9.4 km, Trump International Golf Club at 10.1 km and The Els Golf Club at 11.0 km. The district is a residential area connected to Dubai South’s aviation, logistics and commercial precincts.
Listed travel times from The Eighty Three include 25 minutes to Dubai Hills Estate and Dubai Hills Mall. Dubai Marina and Dubai Marina Mall are each listed at 28 minutes, while Palm Jebel Ali is listed at 33 minutes. Downtown Dubai and Dubai Mall are each listed at 35 minutes. The project’s location in Dubai South also places it in the wider area serving Al Maktoum International Airport and Expo City Dubai. These connections position the development between the Dubai South economic zone and destinations across the city.
Prices for The Eighty Three start from AED 464,083. The payment plan is structured as 60/40: 5% is due on booking, 55% is payable during construction through the first to fifth instalments, and the remaining 40% is due on handover at 100% completion. Handover is scheduled for Q4 2026. The recorded project completion date is 14 December 2026. Construction began on 14 November 2024, and the project’s completion ratio was recorded at 50.29% following an inspection dated 30 April 2026.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.