Developer: Timber Terrace Development · Dubai South Residential District
Timber Terrace is a residential project by Vakson Group in Dubai South Residential District, Dubai, with handover Q3 2027, 77 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 22.09.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Vakson Group · District: Dubai South Residential District
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 14.09.2026 | 2 BR | 104.8 | 1 424 000 |
| 25.08.2026 | 1 BR | 82.8 | 1 117 000 |
| 25.08.2026 | 1 BR | 82.8 | 1 090 000 |
| 25.08.2026 | 1 BR | 85.0 | 1 119 000 |
| 24.08.2026 | 2 BR | 116.9 | 1 623 000 |
| 20.08.2026 | 1 BR | 81.5 | 1 114 000 |
| 20.08.2026 | 1 BR | 81.5 | 1 087 000 |
| 20.08.2026 | 2 BR | 104.8 | 1 459 000 |
| 27.07.2026 | 1 BR | 82.8 | 1 117 000 |
| 22.07.2026 | 1 BR | 81.5 | 1 141 000 |
| 01.07.2026 | 2 BR | 117.0 | 1 662 000 |
| 23.06.2026 | 1 BR | 84.9 | 1 063 000 |
| 23.06.2026 | 1 BR | 85.0 | 1 063 000 |
| 23.06.2026 | 1 BR | 84.9 | 1 119 000 |
| 23.06.2026 | 1 BR | 81.5 | 1 114 000 |
| 23.06.2026 | 1 BR | 82.8 | 1 090 000 |
| 22.06.2026 | 1 BR | 82.8 | 1 063 000 |
| 22.06.2026 | 1 BR | 82.8 | 1 144 000 |
| 17.06.2026 | 2 BR | 116.9 | 1 662 000 |
| 17.06.2026 | 1 BR | 84.9 | 1 119 000 |
Dubai Land Department transaction registry, updated 2026-09-20. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| 1 bedroom | 83 | 1 114 000 | 13 422 | 22 |
| 2 bedrooms | 117 | 1 623 000 | 13 872 | 10 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Timber Terrace is a 77-unit development in Dubai South Residential District. Timber Terrace Development is the developer. The project is classified as Active, with a recorded construction completion ratio of 0.00 and a completion date of 31 July 2027.
Timber Terrace is identified by project number 4165 and has a recorded total area of 8,510.18. The development contains 77 units in Dubai South Residential District, the residential component of the wider Dubai South masterplan. Its recorded project status is Active. The construction completion ratio is 0.00, and the recorded inspection date is 11 November 2025. A start date of 1 December 2025 is recorded for the project, followed by a completion date of 31 July 2027. These dates place Timber Terrace within the developing residential stock of Dubai South Residential District.
Dubai South Residential District sits within the larger Dubai South zone, which is positioned to serve Al Maktoum International Airport and connected economic, logistics and aviation precincts. The district functions as a residential enclave within that wider development. Its planned layout includes residential blocks, open spaces and local infrastructure. Timber Terrace is located within this residential district rather than in an established inner-city neighbourhood. The district includes residential projects at different stages of development, including completed and under-construction buildings. It is connected with the wider Dubai South area, where retail, leisure and healthcare services are accessed across the broader zone and neighbouring urban districts.
South District Park is 1.2 km from Timber Terrace, while DSRC Central Park is 1.3 km away. Pulse Pond Park is located 1.8 km from the project. Expo City Dubai is 5.4 km away. For golf, Jumeirah Golf Estates Golf Course is 7.9 km from Timber Terrace. The Els Golf Club is 9.7 km away, and Trump International Golf Club is 9.8 km away. These destinations place parks closest to the project, followed by Expo City Dubai and golf facilities in the surrounding districts.
The nearest referenced metro connection for Dubai South Residential District is the Red Line, with station reference R76 at a straight-line distance of 6,663 metres. This connection is classified as not walkable from the district. Recorded driving times from Dubai South Residential District are 38 minutes to Dubai Mall, 34 minutes to Palm Jumeirah, 35 minutes to Burj Al Arab and 37 minutes to The Walk, JBR. The recorded drive time to Dubai International Airport is 38 minutes, while Al Maktoum International Airport is listed at 19 minutes by car. Travel times are subject to traffic conditions and selected routes.
The International School of Choueifat DIP is a nearby school option at a listed distance of 5.8 km from Dubai South Residential District. The district is designed as a residential component of Dubai South, with associated parking and internal amenity spaces included among planned district provisions. Wider retail, leisure and healthcare services are accessed through Dubai South and neighbouring urban districts. The location is positioned in relation to the employment, logistics and aviation activity of the wider Dubai South area, including the precincts connected with Al Maktoum International Airport.
Rove Expo 2020 is 5.5 km from Timber Terrace. Its listed venues include Rove Lounge Bar and The Daily restaurant. Millennium Lakeview Hotel is 7.1 km away and includes Lakehouse Bistro. Marriott Executive Apartments DIP is 7.2 km from the project, with Zenzi Thai among its listed dining venues. These hotel destinations are located beyond the immediate residential district and provide named restaurant and bar venues within the surrounding area. Expo City Dubai, at 5.4 km, is closer to Timber Terrace than the three listed hotel properties.
Timber Terrace has a recorded construction start date of 1 December 2025 and a recorded completion date of 31 July 2027. The project is classified as Active. Its recorded completion ratio is 0.00, based on an inspection dated 11 November 2025. The project record was updated on 26 March 2026. Timber Terrace has 77 total units and a recorded total area of 8,510.18. The project number is 4165, matching the development’s identification within Dubai South Residential District.
Timber Terrace Development is the developer of Timber Terrace. The developer name associated with the project is Timber Terrace Development L.L.C. Timber Terrace is located in Dubai South Residential District and is recorded under project number 4165. The development has 77 total units, a total area of 8,510.18 and an Active project status. Its recorded completion date is 31 July 2027, following a recorded start date of 1 December 2025.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Timber Terrace — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-15, https://continentalclub.ae/project/timber-terrace-dubai-south-residential-district/