Developer: Binghatti Developers · JVC District 11

Binghatti Gardenia

Binghatti Gardenia is a residential project by Binghatti Developers in JVC District 11, Dubai, with prices from AED 670 000, construction 100% complete per the DLD registry, 308 units, 405 DLD-registered sales since 2023.

Price fromAED 670 000Developer supplied
Unit typesStudio · 1–3 BR269–1 615 ft²Developer supplied
StatusReadyDLD registry

Layouts and sizes

TypeSize, sq.ft
Studio269–431
1 Bedroom506–700
2 Bedroom1 130–1 238
3 Bedroom1 399–1 615

Balcony or terrace per the DLD registry: almost every residential unit (100%). Typical size: Studio — ~58 sq.ft (5.4 m²); 1 Bedroom — ~103 sq.ft (9.6 m²); 2 Bedroom — ~307 sq.ft (29 m²); 3 Bedroom — ~410 sq.ft (38 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.

Units for sale in Binghatti Gardenia

AED 720,000 · Studio

Payment plan

The purchase price is split into these stages.

120%Down payment
250%During construction
330%On handover

The exact schedule is confirmed in the sale agreement for the selected unit.

Compare with similar projects

A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.

Compare in WhatsApp

Handover date & construction progress

100%
  • StatusReady
  • Construction started25.05.2023
  • HandoverReady To Move in
  • Status date30.01.2025
  • Escrow bankDubai Islamic Bank
  • DLD project number2662

Data from the Dubai Land Department project registry (updated 17.11.2026 05:55).

Inspection history 3
025507510031.05.202330.01.2025
Actual, per inspections
Construction progress 105
30.01.2025 100.00%
Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 1 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 2 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 3 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 4 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 5 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 6 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 7 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 8 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 9 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 10 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 11 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 12 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 13 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 14 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 15 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 16 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 17 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 18 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 19 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 20 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 21 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 22 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 23 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 24 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 25 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 26 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 27 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 28 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 29 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 30 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 31 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 32 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 33 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 34 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 35 of 36Binghatti Gardenia, JVC District 11 construction progress — 30 January 2025, 100.00% complete, photo 36 of 36

69 more photos in the DLD register

Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.

Registered transactions in Binghatti Gardenia

Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.

405deals since 2023
14 747AED per m², median
21%resale, the rest bought from the developer
+8%over the past year
6.9%gross rental yield

The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building grew faster.

What buyers actually paid

TypeSize, m²Price, AEDPer m²Deals
Studio30595 00019 83372
1 bedroom60805 00013 417245
2 bedrooms1031 404 00013 63174
3 bedrooms1612 100 00013 04310

Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.

How the price per square metre moved

From 2023 to 2025 — +18% on the price per square metre in this building. The district moved +26% over the same period, so the building lagged the market.

13 9652023——
13 9652024——
16 45520251 3007.9%
16 3572026*1 2177.4%

Top to bottom: purchase price per m², year, annual rent per m², gross yield.

All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.

* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.

Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Recent transactions

DateTypeSize, m²Price, AED
16.11.20262 BR103.71 400 000
12.11.20261 BR60.41 095 000
19.10.2026Studio30.3550 000
19.08.20262 BR103.41 650 000
11.08.20261 BR59.9840 000
28.07.2026Studio30.2560 000
23.07.20261 BR48.9800 000
22.07.20262 BR103.41 430 000
21.07.20261 BR60.4825 000
16.06.20261 BR48.8790 000
08.06.20261 BR60.31 120 000
04.05.20261 BR60.21 090 000
29.04.20261 BR60.41 075 000
28.04.20261 BR49.0950 000
10.04.20262 BR103.71 570 000
25.03.20262 BR103.61 580 000
20.02.20261 BR59.81 000 000
19.02.20262 BR103.41 525 000
09.02.20261 BR48.8925 000
09.02.20261 BR60.1925 000
05.02.20262 BR103.41 405 000
23.01.20261 BR60.3960 000
15.01.2026Studio30.3630 000
13.01.2026Studio30.3625 000
06.01.20263 BR160.52 600 000
26.12.20251 BR60.31 120 000
22.12.2025Studio30.2670 000
18.12.2025Studio30.2630 000
08.12.20251 BR48.7870 000
04.12.20251 BR60.71 030 000
19.11.2025Studio30.2617 000
13.11.20252 BR103.31 500 000
30.10.20252 BR103.71 400 000
29.10.20251 BR61.01 030 000
29.10.20251 BR48.7950 000
28.10.20252 BR103.71 575 000
20.10.20252 BR103.41 400 000
15.10.20251 BR60.21 000 000
06.10.2025Studio30.1660 000
06.10.20251 BR60.31 000 000
25.09.20251 BR60.9980 000
16.09.20251 BR48.8860 000
16.09.20251 BR48.9870 000
16.09.20251 BR60.2970 000
12.09.20251 BR60.31 025 000
11.09.2025Studio30.2625 000
04.09.20251 BR48.9890 000
25.08.20251 BR60.31 060 000
20.08.20251 BR60.3990 000
14.08.20251 BR61.1970 000
Rentals — 20
DateTypeSize, m²Rent, AED/yr
16.11.2026Studio30.244 000
15.11.20261bed room+Hall60.770 000
14.11.20261bed room+Hall48.960 000
14.11.2026Studio30.145 000
08.11.2026Studio30.245 000
06.11.20261bed room+Hall60.365 000
04.11.20262 bed rooms+hall103.7110 000
03.11.20261bed room+Hall61.075 000
01.11.20261bed room+Hall60.780 000
27.10.2026Studio30.260 000
20.10.2026Studio30.243 000
17.10.2026Studio30.145 000
17.10.20262 bed rooms+hall103.4130 000
16.10.20261bed room+Hall60.160 000
13.10.20261bed room+Hall48.855 000
07.10.20262 bed rooms+hall103.4128 500
03.10.20262 bed rooms+hall103.795 000
02.10.20261bed room+Hall48.965 000
01.10.20261bed room+Hall60.377 000
01.10.20262 bed rooms+hall103.4100 000

Dubai Land Department transaction registry, updated 17.11.2026. Explore Dubai property transactions →

Mortgage for this project

For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 670 000 AED is 2 829 AED.

Calculate mortgage

Estimates only; not a bank approval.

Amenities

  • Health Club
  • Gymnasium
  • Restaurants
  • Shared Pool
  • Children's Play Area

What is nearby

  • Al Khail Avenue Mall3 мин
  • City Centre Al Barsha5 мин
  • Mall of the Emirates7 мин
  • Mediclinic Park View Hospital5 мин

Places nearby

🌳 Thamam Park · 0.1 km🌳 Halool Park · 0.2 km🌳 Henna Park · 0.4 km🧸 Ladybird Early Learning Centre JVC · 0.4 km🌳 Markh Park · 0.5 km
Binghatti Gardenia

Your broker for this project

Elena Orlova

Elena Orlova

Senior Broker · Continental Club Property · RERA ORN 31933

Answers questions about Binghatti Gardenia: current availability, payment plan, DLD registration. English and Russian.

Get the presentation and prices

We will send floor plans, the payment plan and available units for this project.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

Project data comes from the Dubai Land Department (DLD) registry.

Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology

About the project

Binghatti Gardenia is a completed mixed-use development by Binghatti Developers in JVC District 11, within Jumeirah Village Circle. It combines residential apartments with office and retail space in a single building. The project was completed on 25 July 2024, has reached 100% completion, and is ready to move in.

A mixed-use building in JVC District 11

Binghatti Gardenia is a residential, office and retail development in Jumeirah Village Circle. The building includes an underground floor, a ground floor, five podium floors, four office floors, 29 residential floors and a roof floor. It has 308 total units. The residential collection comprises studios and one-, two- and three-bedroom apartments. Office and retail space form part of the same development, with one retail shop and 23 offices included in the project configuration. The completed building sits in JVC District 11, a residential sector of the wider Jumeirah Village Circle community.

Architecture and exterior design

The architectural concept is defined by individual balconies that are interwoven across the façade. This arrangement creates a connected visual pattern across the building while giving apartments private outdoor space. The balcony configuration also provides shade to the living spaces, reducing the energy required for cooling. The design combines contemporary architectural treatment with Middle Eastern architectural elements. Binghatti Gardenia has been designed as a vertical mixed-use building, with its residential, office, retail and roof levels organised above the ground and podium floors. Apartments are specified with high-end finishes.

Apartment types and sizes

Binghatti Gardenia offers four apartment configurations: studios, one-bedroom, two-bedroom and three-bedroom residences. Studios range from 269.1 to 430.6 square feet. One-bedroom apartments range from 505.9 to 699.7 square feet. Two-bedroom apartments range from 1,130.2 to 1,237.8 square feet, while three-bedroom apartments range from 1,399.3 to 1,614.6 square feet. The range of layouts places compact studios and larger family-sized apartments within the same completed development. Each apartment type forms part of the project’s 29 residential floors.

Nearby schools, retail and healthcare

Several schools are listed within short driving times of Binghatti Gardenia. GEMS United in Dubai Sports City, Nord Anglia in Al Barsha South and GEMS World Academy in Al Barsha South are each five minutes away. Dubai British School and Dubai International Academy in Emirates Hills are each seven minutes away. Al Khail Avenue Mall at Jumeirah Village Triangle is two minutes away. City Centre Al Barsha and Mediclinic Park View Hospital in Al Barsha South are each five minutes away. Mall of the Emirates and Al Barsha Mall are each seven minutes away, while Emirates Hospital Day Surgery in Motor City is five minutes away.

Parks, golf and cinema options

Thamam Park is 0.1 km from Binghatti Gardenia, while Halool Park is 0.2 km away and Sabat Park is 0.3 km away. Cinepolis at Circle Mall is 0.8 km from the development. Reel Cinemas at The Springs Souk is 2.2 km away, and Vox Cinemas at Mall of the Emirates is 6.6 km away. The Els Golf Club is 2.5 km away, with Montgomerie Golf Course at 3.8 km and Jumeirah Golf Estates Golf Course at 4.4 km. Dubai Miracle Garden is 3.2 km from the project, while Ski Dubai is 6.6 km away.

Completion, availability and pricing

Binghatti Gardenia is finished, with a recorded completion ratio of 100%. Construction started on 25 May 2023 and the completion date is 25 July 2024. The project is ready to move in. The starting price is AED 670,000. It is a single-building development in JVC District 11, with 308 units in total. Payment-plan details are available on request. Buyers can consider the finished status alongside the available apartment configurations, which range from studios to three-bedroom residences.

Binghatti Developers

Binghatti Developers is the developer of Binghatti Gardenia. Founded in 2008, the company develops projects in Dubai and elsewhere in the UAE. Its portfolio includes developments in Business Bay, Dubai Silicon Oasis, Al Jaddaf, Dubai Marina, Jumeirah Village Circle, Liwan and Dubai Land Residence Complex. Binghatti Gardenia reflects the developer’s use of interwoven balconies, combining individual outdoor areas with a unified façade pattern. The project’s completed mixed-use structure incorporates residential apartments, offices and retail space within JVC District 11.

Service charge, 2026

Approved rate18.98 AED▲ +7.2% per sq ft per year · 204 AED/m²
General / reserve fund18.07 / 0.91AED/sq ft · additional 234.64
vs Jumeirah Village Circle median▲ +15.5%median 16.44 · rank 152/192
A 1,000 sq ft unit≈ 18,980 AEDper year · ≈ $5,168

Managed by Stealth Owner Association Management Services · budget 1 Jan 2026 — 31 Dec 2026

History, budget breakdown and nearby buildings →

RERA-approved budget from the DLD service charge index (Mollak) for “Binghatti Gardenia”. Total is the general and reserve funds; additional charges are separate.

Frequent questions

Who is the developer of Binghatti Gardenia?
Binghatti Gardenia is developed by Binghatti Developers, a developer founded in 2008.
Where is Binghatti Gardenia located?
The project is in JVC District 11, within Jumeirah Village Circle, Dubai.
Is Binghatti Gardenia completed?
Yes. Binghatti Gardenia is finished, with 100% completion recorded and a completion date of 25 July 2024.
Is Binghatti Gardenia ready to move in?
Yes. The project is ready to move in.
What apartment types are available at Binghatti Gardenia?
The development includes studios and one-, two- and three-bedroom apartments.
What are the apartment sizes at Binghatti Gardenia?
Studios range from 269.1 to 430.6 square feet, while one-bedroom apartments range from 505.9 to 699.7 square feet. Two-bedroom homes range from 1,130.2 to 1,237.8 square feet and three-bedroom homes from 1,399.3 to 1,614.6 square feet.
What is the starting price at Binghatti Gardenia?
The starting price is AED 670,000.
What is near Binghatti Gardenia?
Al Khail Avenue Mall is two minutes away, while City Centre Al Barsha and Mediclinic Park View Hospital are each five minutes away. Thamam Park is 0.1 km from the project and Cinepolis at Circle Mall is 0.8 km away.
What is the payment plan for Binghatti Gardenia?
Payment-plan details are available on request.
How can I buy an apartment in Binghatti Gardenia?
Submit an enquiry via the form on this page or message us on WhatsApp — a Continental Club Property broker (RERA 31933) will help you choose a unit and send the brochure and payment plan.

Estimate a unit in this building from DLD sales

Based on 50 registered DLD sales in Binghatti Gardenia between 14 Aug 2025 and 16 Nov 2026: median 16 801 AED/m² (1 561 AED/sq ft); half of the deals fell between 15 518 and 18 468 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.

TypeIndicative priceDealsMedian AED/m²Median area, m²
StudioAED 625 000920 70930.2
1 BRAED 1 022 0002916 97160.2
2 BRAED 1 501 0001114 517103.4
Get an exact valuation

Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.

PDF shortlist · updated 1 November 2026

JVC District 11: new projects and prices

23 projects · prices from DLD and developers

  1. Maimoon Gardens Maimoon Gardens JVC District 11 · Studio, 1–3 BR from AED 540,000
  2. Greygate Residences Greygate Residences JVC District 11 · Studio, 1 BR from AED 600,000
  3. Vivanti Residences Vivanti Residences JVC District 11 · Studio, 1–3 BR from AED 600,000

20 more in the PDF: prices, handover dates, payment plans

The PDF opens instantly. Refreshed monthly from DLD data.

How much is your property in Binghatti Gardenia worth?

DLD has recorded 405 sales in this building since 2023, 86 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.

By submitting the form you agree to the processing of your contact details, including for advertising analytics.

More projects by Binghatti Developers

All 82 projects by Binghatti Developers →

Nearby projects

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.

How to cite:Binghatti Gardenia — Continental Club Property, from Dubai Land Department registry and developer data, 2026-11-17, https://continentalclub.ae/project/binghatti-gardenia-jvc-district-11/

Where should we send the shortlist?

The PDF downloads right after you submit. A manager gets in touch only if you ask.