by Namat Developers in Nad Al Sheba 1
Tura Residence is a residential project by Namat Developers in Nad Al Sheba 1, Dubai, with handover 30.04.2029, construction 0.7% complete per the DLD registry.
Construction progress
- Handover30.04.2029
- Status date13.07.2026
- DLD project number4318
Data from the Dubai Land Department project registry (updated 06.08.2026 09:55).
Places nearby
About the project
Tura Residence is a 23-unit residential development in Nad Al Sheba 1 by Namat Real Estate Development. The project is active, with a recorded completion ratio of 66%. Its scheduled completion date is 30 April 2029.
The project
Tura Residence is recorded as project number 4318 and contains 23 total units. It is located in Nad Al Sheba 1, a sub-community within the wider Nad Al Sheba area on the eastern edge of Mohammed Bin Rashid City, near Meydan. Nad Al Sheba 1 includes low- to mid-rise residential pockets, standalone villas and residential compounds, served by local roads. The project’s recorded total area is 3,248.87. Namat Real Estate Development is identified as the developer of Tura Residence.
Construction status and scheduled completion
Tura Residence has active project status. Its recorded completion ratio is 0.66, equivalent to 66%, following an inspection dated 13 July 2026. The listed construction start date is 30 April 2026. The scheduled completion date is 30 April 2029. These dates and the completion ratio place the development within its recorded construction programme. The project information identifies Tura Residence under project number 4318 and records 23 total units.
Nad Al Sheba 1 setting
Nad Al Sheba 1 forms part of the Nad Al Sheba grouping in Dubai and sits close to the Meydan and Mohammed Bin Rashid City corridors. The neighbourhood combines residential areas with local leisure infrastructure and a developed street network. Its surroundings include open spaces, community parks, sports facilities and residential compounds. Tonino Lamborghini Residences is also listed within Nad Al Sheba 1. The locality is positioned at latitude 25.159119 and longitude 55.30882. Dubai Land Department transaction data for the area includes 50 sale transaction entries attributed to Nad Al Sheba 1.
Road connections and city destinations
From Nad Al Sheba 1, Burj Khalifa and Downtown Dubai are listed at 5.5 km, while The Dubai Mall is 5.2 km away. Business Bay is 5.3 km from the community and DIFC is 6.5 km away. Mall of the Emirates is listed at 11.8 km, Dubai International Airport at 11.9 km and Global Village at 9.9 km. Palm Jumeirah is 17.9 km away, Dubai Marina is 19.1 km away and JBR Beach is 19.8 km away. Expo City Dubai is listed at 27.3 km and Al Maktoum International Airport at 32.8 km.
Leisure, cycling and schools
The Nad Al Sheba Cycle Path provides 8 km, 6 km and 4 km routes for cycling and running. The route has night lighting, restrooms, changing rooms, showers and lockers. Nad Al Sheba 1 also includes a women-focused fitness SuperClub in a 21,000-square-foot facility, with boutique studios, recovery amenities and wellness programming. Rashid and Latifa Schools are listed at a distance of 0.6 km from the community. The Bilingual French International School is listed at 1.0 km. Community parks, sports facilities and leisure spaces form part of the wider local setting.
Public transport access
The closest identified Dubai Metro station to Nad Al Sheba 1 is Red Line station R26, at a listed distance of 6,042 metres from the community. Nad Al Sheba 1 is connected by local roads to central Dubai and major arterial routes. The area’s position near Meydan and Mohammed Bin Rashid City places it within the road network serving Downtown Dubai, Business Bay, DIFC and other Dubai destinations. Tura Residence is located within this Nad Al Sheba 1 setting.
Developer
Namat Real Estate Development is the developer of Tura Residence. The development is recorded under project number 4318 in Nad Al Sheba 1 and has 23 total units. Its project status is active, with a completion ratio of 66% recorded after the inspection dated 13 July 2026. The listed construction start date is 30 April 2026, and the scheduled completion date is 30 April 2029.