Developer: Tfg S C Development · Studio City
The First Collection At Dubai Studio City is a residential project by Tfg S C Development in Studio City, Dubai, with indicative prices from AED 316 000 (estimate from DLD sales; developer price not yet published), handover Q1 2028, construction 31.9% complete per the DLD registry, 513 units, 607 DLD-registered sales since 2024.
· price from DLD deals
Balcony or terrace per the DLD registry: 4% of residential units. Typical balcony size: Studio — ~60 sq.ft (5.6 m²). Median of registered units; for villas and townhouses the registry includes terraces and open areas.
A broker will compare this project with 3 similar ones: prices, handover dates and payment plans.
All Dubai projects handing over in 2028 →
Data from the Dubai Land Department project registry (updated 26.11.2026 05:55).
Pace: 2.53% per month. At this rate 100% falls on 09.01.2029.
The pace is calculated from the past year of inspections. It is an estimate, not a developer commitment. For reference: across 1,175 completed projects the median pace is 2.48% per month and the median build takes 40 months.
84 more photos in the DLD register
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Tfg S C Development · District: Studio City
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved 0% over the same period, so the building grew faster.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 27 | 1 051 650 | 38 950 | 530 |
| 1 bedroom | 51 | 1 571 000 | 30 804 | 76 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 24.11.2026 | Studio | 26.9 | 1 051 650 |
| 24.11.2026 | Studio | 6.7 | 279 125 |
| 23.11.2026 | 1 BR | 12.7 | 452 647 |
| 23.11.2026 | 1 BR | 12.7 | 467 025 |
| 23.11.2026 | Studio | 6.7 | 315 775 |
| 18.11.2026 | Studio | 26.9 | 1 051 650 |
| 11.11.2026 | Studio | 6.7 | 279 125 |
| 11.11.2026 | Studio | 14.6 | 279 125 |
| 11.11.2026 | 1 BR | 13.0 | 430 375 |
| 09.11.2026 | Studio | 6.9 | 301 115 |
| 09.11.2026 | Studio | 7.0 | 315 775 |
| 04.11.2026 | 1 BR | 12.7 | 467 025 |
| 04.11.2026 | 1 BR | 12.7 | 452 275 |
| 04.11.2026 | Studio | 6.6 | 315 775 |
| 04.11.2026 | Studio | 6.9 | 315 775 |
| 03.11.2026 | Studio | 7.0 | 279 125 |
| 03.11.2026 | Studio | 6.9 | 315 775 |
| 03.11.2026 | Studio | 6.6 | 315 775 |
| 03.11.2026 | Studio | 6.6 | 279 125 |
| 03.11.2026 | Studio | 6.6 | 279 125 |
| 03.11.2026 | Studio | 6.9 | 282 000 |
| 02.11.2026 | Studio | 6.6 | 315 775 |
| 02.11.2026 | 1 BR | 52.1 | 1 565 000 |
| 29.10.2026 | Studio | 27.9 | 1 051 650 |
| 28.10.2026 | Studio | 26.9 | 1 051 650 |
| 28.10.2026 | Studio | 6.6 | 315 775 |
| 28.10.2026 | 1 BR | 13.0 | 467 025 |
| 28.10.2026 | Studio | 6.9 | 315 775 |
| 28.10.2026 | Studio | 6.7 | 315 775 |
| 28.10.2026 | 1 BR | 13.0 | 467 025 |
| 28.10.2026 | 1 BR | 13.0 | 470 375 |
| 28.10.2026 | Studio | 6.7 | 315 775 |
| 28.10.2026 | Studio | 6.6 | 297 450 |
| 28.10.2026 | Studio | 6.9 | 315 775 |
| 28.10.2026 | Studio | 6.9 | 315 775 |
| 22.10.2026 | Studio | 6.9 | 279 125 |
| 21.10.2026 | 1 BR | 13.0 | 467 025 |
| 21.10.2026 | Studio | 27.9 | 1 051 650 |
| 21.10.2026 | Studio | 26.5 | 1 051 650 |
| 21.10.2026 | 1 BR | 13.0 | 467 025 |
| 16.10.2026 | Studio | 6.6 | 260 800 |
| 16.10.2026 | Studio | 6.6 | 279 125 |
| 16.10.2026 | Studio | 26.2 | 1 051 650 |
| 16.10.2026 | Studio | 26.9 | 1 051 650 |
| 16.10.2026 | Studio | 6.7 | 293 614 |
| 16.10.2026 | Studio | 7.0 | 315 775 |
| 16.10.2026 | Studio | 6.6 | 315 775 |
| 14.10.2026 | Studio | 6.6 | 315 775 |
| 09.10.2026 | Studio | 6.6 | 315 775 |
| 09.10.2026 | Studio | 26.4 | 1 051 650 |
Dubai Land Department transaction registry, updated 25.11.2026. Explore Dubai property transactions →
For UAE residents the down payment starts at 20% with terms up to 25 years. Indicative monthly payment for prices from 316 000 AED is 1 334 AED.
Estimates only; not a bank approval.


Olesia Kotova
Broker · Continental Club Property · RERA ORN 31933
Answers questions about The First Collection At Dubai Studio City: current availability, payment plan, DLD registration. English and Russian.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
The First Collection At Dubai Studio City is an active single-building project by Tfg S C Development in Studio City. The building is configured as basement, ground level, eight floors and roof, with 513 total units recorded for the project. Construction began on 1 February 2025, and the scheduled completion date is 31 January 2028.
The First Collection At Dubai Studio City is planned as one building in Studio City, within Al Hebiah Second. Its recorded configuration is B+G+8+R: a basement, ground floor, eight upper floors and a roof level. The project is designed with a concrete structure and blockwork, together with internal and external finishes. The total project area is recorded as 13,557.70. The project has 513 total units recorded. Its construction start date is 1 February 2025, placing the development within Studio City’s continuing residential, hospitality, commercial and production-focused built environment.
The project is active. Its completion ratio is 31.86%, based on an inspection dated 12 October 2026. The scheduled completion date is 31 January 2028. Construction commenced on 1 February 2025. These dates place the project within a defined construction programme extending from February 2025 to January 2028. The development is identified by project number 3370. The project is recorded as a single building, with its building form set as basement, ground floor, eight floors and roof.
Studio City is a specialised district in the DubaiLand area, planned as a film and television production centre with residential and hotel accommodation. The district combines production infrastructure with a residential offering near the original studio complex. Its master plan includes facilities for broadcasting, film production, television and music, alongside residential units, hotels and ancillary retail. Production-related facilities in the district include sound stages, studios, production offices, workshops, backlots, sets and water tanks. Commercial, hospitality and residential accommodation are also present within Studio City.
From Studio City, Dubai Marina is 12.0 km away and JBR Beach is 12.6 km away. Palm Jumeirah and Expo City Dubai are each 13.7 km away. Business Bay is 16.0 km away, while Burj Khalifa and Downtown Dubai are 17.4 km away. The Dubai Mall is 17.5 km away, Dubai International Financial Centre is 19.1 km away, and Dubai International Airport is 26.1 km away. Al Maktoum International Airport is 18.6 km away. Mall of the Emirates is 9.9 km away and Global Village is 6.4 km away.
The nearest Dubai Metro reference for Studio City is Red Line station R73, 9,296 m from the core studio area. The station is not within walking distance of that core area. Studio City’s production campus includes multi-storey office buildings, a tower element within the production and administration campus, workforce-serving retail, warehousing and workshop spaces. A hotel serves production crews and visitors. Food and beverage outlets and small shopfronts are located near hotel and residential entrances, while gardens and park space form part of the district’s community and building amenities.
Studio City was launched in 2005 as part of the media and entertainment cluster under TECOM Investments, a subsidiary of Dubai Holding. Phase one construction began in June 2007 and delivered sound stages, smaller studios, production and administration office space, and workshop and warehouse units. These facilities support set construction and wider production operations. The district’s core occupational base includes production companies, post-production houses, crews and related service providers. Residential buildings, hotel accommodation and ancillary retail sit alongside this production infrastructure.
The First Collection At Dubai Studio City is being developed by Tfg S C Development. The project is located in Studio City and is identified under project number 3370. Its recorded programme began on 1 February 2025 and has a scheduled completion date of 31 January 2028. The development is active, with a reported completion ratio of 31.86% at the 12 October 2026 inspection.
Compare with other projects under construction: all off-plan projects in Dubai — completion data from the DLD register, prices and handover dates.
Dubai market as a whole: prices, transactions and trends (DLD data) →
Based on 50 registered DLD sales in The First Collection At Dubai Studio City between 9 Oct 2026 and 23 Nov 2026: median 40 779 AED/m² (3 788 AED/sq ft); half of the deals fell between 36 907 and 45 898 AED/m². This is transaction statistics, not a valuation of a specific unit: floor, view, finish and condition move the price.
| Type | Indicative price | Deals | Median AED/m² | Median area, m² |
|---|---|---|---|---|
| Studio | AED 298 000 | 38 | 43 186 | 6.9 |
| 1 BR | AED 466 000 | 12 | 35 870 | 13 |
Source: Dubai Land Department open data, the latest up to 50 sales in the building; areas as registered; refreshed daily. Deals outside 3,000–200,000 AED/m² are excluded.
PDF shortlist · updated 1 November 2026
Studio City: new projects and prices
9 projects · prices from DLD and developers
Beach Oasis 2 Studio City · Studio, 1–2 BR
from AED 520,000
Arisha Terraces Studio City · Studio, 1–2 BR
from AED 558,000
Ghaff Land Residence Studio City · Studio, 1–2 BR
from AED 600,000
6 more in the PDF: prices, handover dates, payment plans
The PDF opens instantly. Refreshed monthly from DLD data.
DLD has recorded 607 sales in this building since 2024, 1 of them resales. We compare your unit with sales of the same layout here, not with asking prices. Free, reply within 24 hours.