Developer: Danube Properties Development · Dubai Silicon Oasis
Oasiz 2 by Danube is a residential project by Danube Properties in Dubai Silicon Oasis, Dubai, with prices from AED 727 000, handover Q4 2027, construction 31% complete per the DLD registry, 483 units.
| Type | Units | Size, sq.ft |
|---|---|---|
| Studio | 223 | 379–402 |
| 1 Bedroom | 177 | 542–693 |
| 2 Bedroom | 73 | 748–989 |
| 3 Bedroom | 8 | 1 170 |
| NA | 2 | 1 309–1 874 |
Data from the Dubai Land Department registry.
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
Data from the Dubai Land Department project registry (updated 19.08.2026 09:55).
Construction photos are taken by the technical inspectors of the Dubai Land Department (DLD) and remain its property. We show compressed copies; full-resolution originals are available in the Real Estate Project Status service.
All Dubai construction in the DLD register · Developer: Danube Properties · District: Dubai Silicon Oasis
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 17.08.2026 | Studio | 35.2 | 855 000 |
| 17.08.2026 | Studio | 37.3 | 754 160 |
| 11.08.2026 | Studio | 35.2 | 831 000 |
| 05.08.2026 | 1 BR | 52.8 | 1 028 300 |
| 03.08.2026 | Studio | 35.2 | 840 000 |
| 30.07.2026 | Studio | 35.2 | 781 200 |
| 30.07.2026 | Studio | 35.2 | 756 000 |
| 30.07.2026 | Studio | 35.2 | 781 200 |
| 29.07.2026 | Studio | 35.2 | 840 000 |
| 29.07.2026 | 1 BR | 58.6 | 1 185 800 |
| 27.07.2026 | 1 BR | 58.6 | 1 144 830 |
| 23.07.2026 | 2 BR | 76.6 | 1 414 140 |
| 22.06.2026 | 1 BR | 51.2 | 904 360 |
| 11.03.2026 | 2 BR | 38.3 | 694 330 |
| 30.12.2025 | Studio | 35.2 | 757 350 |
| 18.12.2025 | Studio | 35.2 | 769 000 |
| 12.12.2025 | Studio | 37.0 | 773 000 |
| 08.12.2025 | Studio | 35.2 | 725 858 |
| 28.11.2025 | Studio | 35.2 | 680 000 |
| 18.11.2025 | Studio | 35.2 | 761 000 |
Dubai Land Department transaction registry, updated 2026-08-18. Explore Dubai property transactions →
Dubai Land Department records for this building: closed transaction prices, not asking prices or estimates. Figures are medians, so a single expensive sale does not move them.
The yearly figure compares the last 12 months with the 12 before them: calendar years would not work, the current one is unfinished. The district moved +9% over the same period, so the building matched it.
| Type | Size, m² | Price, AED | Per m² | Deals |
|---|---|---|---|---|
| Studio | 35 | 757 540 | 21 644 | 223 |
| 1 bedroom | 52 | 1 017 530 | 19 568 | 173 |
| 2 bedrooms | 72 | 1 349 000 | 18 736 | 72 |
| 3 bedrooms | 109 | 1 831 000 | 16 798 | 8 |
Median across all recorded deals in this building. Rows with fewer than five deals are omitted: there is nothing to average there.
From 2024 to 2026 — +14% on the price per square metre in this building. The district moved +19% over the same period, so the building lagged the market.
Top to bottom: purchase price per m², year, annual rent per m², gross yield.
All figures are medians. Years with fewer than eight deals are skipped; rent is shown where there are at least twenty contracts. The yield is gross — service charges are not published in the register.
* 2026 is still in progress and its bar covers part of the year. The growth figure above uses completed years.
Source: Dubai Land Department transaction register. The register is updated daily; the figures here are recalculated weekly.

Oasiz 2 by Danube is a 483-unit residential development by Danube Properties in Dubai Silicon Oasis. The registered scheme comprises one mixed-use building configured as 1 basement level, ground floor, four podium levels, 37 floors and a roof level. It is active, with a recorded completion ratio of 31.00% at the inspection dated 29 July 2026, and handover is scheduled for Q4 2027.
Oasiz 2 by Danube is planned as a single mixed-use building in Dubai Silicon Oasis. Its registered configuration is 1B+G+4P+37+R, comprising one basement level, a ground floor, four podium levels, 37 floors and a roof level. The building is designed with a concrete structure and blockwork, with internal and external finishes. The development has 483 units across a total project area of 23,994.50 square metres. Construction began on 1 December 2024. The scheduled project completion date is 30 November 2027, which falls within the stated Q4 2027 handover period.
The residence offers studios and one-, two- and three-bedroom apartments. Private pools within apartments are listed among the project’s features. The project also identifies luxury furnishing as a feature. The building’s apartment offering is complemented by shared leisure, fitness, family and social facilities within the development. Buyers considering Oasiz 2 by Danube can assess apartment type alongside the amenities intended for active recreation, children’s activities, work and gatherings. Freehold ownership is listed for the project.
The amenities list includes an infinity anti-current pool, jacuzzi or shallow pool, aqua gym and rain shower. Fitness facilities comprise indoor and outdoor gyms, a joggers’ arena, spa and therapy facilities, and a health bar. Sports and activity spaces include a cricket pitch, basketball, badminton court, table tennis, wall climbing and a trampoline sphere. Children’s provisions include a kids’ play area, kids’ daycare and an arcade room. The project also lists a business centre, library, chess zone, floating cinema, Grill Grove, cabana seating and a party hall. Private pools in apartments are also listed among the amenities.
Oasiz 2 by Danube is located in Dubai Silicon Oasis. Silicon Towers Park is 0.3 km from the development, while Liwan Playground is 1.0 km away and Silicon Oasis Lake Park is 1.8 km away. IMG Worlds of Adventure is 6.4 km away, Global Village is 8.3 km away and Ras Al Khor Wildlife Sanctuary is 9.3 km away. The Track Meydan Golf is 7.8 km away, with Dubai Hills Golf Club at 10.7 km and Al Badia Golf Club at 11.0 km. Silicon Central Mall is listed at a two-minute distance, while Al Ain–Dubai Road is listed at three minutes.
Prices start from AED 727,000. The stated payment structure is 70/30. A 10% down payment is due on booking, followed by 54% during construction across the first to 33rd instalments. A further 6% is due on handover at 100% completion. The remaining 30% is scheduled post-handover within 30 months. This structure places 70% of the purchase price before or at handover and 30% after handover. The project also identifies its payment plan as interest-free and available on a per-month basis.
Oasiz 2 by Danube is an active development with a recorded completion ratio of 31.00%. The inspection associated with that figure was dated 29 July 2026, and the project record was updated on 31 July 2026. The planned completion date is 30 November 2027. Danube Properties is the developer of Oasiz 2 by Danube. Rizwan Sajan is identified as Founder and Chairman of Danube Group, while Adel Sajan is identified as Managing Director of Danube Group. The project is located in Dubai Silicon Oasis and has 483 units in one building.
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.