Developer: G F S Real Estate · Saih Shuaib 2
Coventry Residence 3 is a residential project by GFS Real Estate in Saih Shuaib 2, Dubai, with handover Q4 2027, 185 units.
Every figure carries its origin: “DLD registry” is taken from the Dubai Land Department register, “Developer supplied” is stated by the developer, “Our calculation” is computed by us from the first two. Developer prices change without notice — confirm before you commit. Methodology
The purchase price is split into these stages.
The exact schedule is confirmed in the sale agreement for the selected unit.
All Dubai projects handing over in 2027 →
Data from the Dubai Land Department project registry (updated 22.09.2026 09:55).
| Date | Type | Size, m² | Price, AED |
|---|---|---|---|
| 10.09.2026 | Studio | 36.6 | 499 973 |
| 08.09.2026 | Studio | 36.6 | 515 000 |
| 08.09.2026 | Studio | 36.6 | 530 000 |
| 04.09.2026 | Studio | 36.6 | 507 976 |
| 04.09.2026 | Studio | 36.6 | 507 976 |
| 26.08.2026 | Studio | 36.6 | 450 000 |
| 24.08.2026 | Studio | 36.5 | 476 155 |
| 22.06.2026 | Studio | 39.9 | 551 788 |
| 12.06.2026 | Studio | 36.4 | 468 982 |
| 12.06.2026 | Studio | 36.6 | 529 650 |
| 12.06.2026 | Studio | 36.6 | 533 930 |
| 12.06.2026 | 1 BR | 62.7 | 868 954 |
| 12.06.2026 | Studio | 36.6 | 476 155 |
Dubai Land Department transaction registry, updated 2026-09-20. Explore Dubai property transactions →

Coventry Residence 3 is a G+4 residential development by G F S Real Estate in Saih Shuaib 2, within Dubai Industrial City and the Dubai South masterplan. The project comprises 185 units across a total area of 7,401.59. It is active, with a recorded completion ratio of 0.00 and a completion date of 31 December 2027.
Coventry Residence 3 is identified under project number 4070 and is planned as a G+4 development. G F S Real Estate is the developer of the project. The development has 185 total units and a total area of 7,401.59. Its location is Saih Shuaib 2, a subcommunity within Dubai Industrial City. Dubai Industrial City forms part of the wider Dubai South masterplan. Saih Shuaib 2 is positioned at coordinates 24.872133, 55.053492. The project combines its G+4 building format with a location in southern Dubai’s industrial and development-led district.
Coventry Residence 3 is active and has a recorded completion ratio of 0.00. The construction start date is 15 December 2025. The completion date is 31 December 2027. These dates place the project within the current pipeline of development in Saih Shuaib 2. The development is a 185-unit scheme, with its construction progress recorded at 0.00 at the latest update. The project’s G+4 format and total area of 7,401.59 form part of its recorded development profile. Its scheduled completion falls in December 2027.
Saih Shuaib 2 is a subcommunity of Dubai Industrial City, which is part of Dubai South. The district combines industrial, development and residential uses. Its residential component includes accommodation supporting workforce and operational needs, alongside the area’s industrial and logistics activity. Saih Shuaib 2 contains 15 projects with a combined 1,558 units. Three projects in the area are under development and five have been completed. Coventry Residence 3 is located within this established mix of industrial, logistics, supporting residential and workforce accommodation schemes. Expo City Dubai is 13.8 km from Saih Shuaib 2.
From Saih Shuaib 2, Al Maktoum International Airport is 11.2 km away and Dubai International Airport is 52.8 km away. Dubai Marina is 24.8 km from the subcommunity, while JBR Beach is 24.3 km away. Palm Jumeirah is 28.1 km away, and Mall of the Emirates is 31.1 km away. Burj Khalifa and Downtown Dubai are 42.4 km from Saih Shuaib 2, while The Dubai Mall is 42.8 km away. Typical driving times include 41 minutes to The Dubai Mall, 33 minutes to Palm Jumeirah, 38 minutes to Burj Al Arab and 34 minutes to The Walk at JBR. Travel times vary with traffic and route choice.
Al Maktoum International Airport is 11.2 km from Saih Shuaib 2, with a typical driving time of 19 minutes. Dubai International Airport is 52.8 km away, with a typical driving time of 48 minutes. The nearest metro station is Red Line station R42, located 12.3 km from the centre of Saih Shuaib 2. The station is not within walking distance of the subcommunity. The location places Coventry Residence 3 within Dubai South, near the southern Dubai transport infrastructure that includes Al Maktoum International Airport and Expo City Dubai.
Dubai Industrial City is the setting for Saih Shuaib 2 and forms a component of Dubai South. The area’s 15 projects provide a combined total of 1,558 units. Its development pattern includes industrial, logistics, residential and workforce accommodation schemes. Of the projects in Saih Shuaib 2, three are under development and five are completed. Coventry Residence 3 adds a 185-unit G+4 project to this district. The subcommunity is 13.8 km from Expo City Dubai and 11.2 km from Al Maktoum International Airport. Its position links the project to southern Dubai’s industrial masterplan and airport infrastructure.
Dubai market as a whole: prices, transactions and trends (DLD data) →
We will send floor plans, the payment plan and available units for this project.
Project data comes from the Dubai Land Department (DLD) registry.
Machine-readable mirrors of this page: Markdown · JSON. They carry the same figures as this page, each with its origin labelled.
How to cite:Coventry Residence 3 — Continental Club Property, from Dubai Land Department registry and developer data, 2026-09-19, https://continentalclub.ae/project/coventry-residence-3-saih-shuaib-2/